Resolution 227RESOLUTION NO.
A RESOLUTION OF THE CITY OF EDMONDS, WASHINGTON, ADOPTING
A REVISED COMPREHENSIVE SIX -YEAR STREET CONSTRUCTION PRO-
GRAM TO. BE FILED WITH THE DIRECTOR OF HIGHWAYS AND THE
URBAN ARTERIAL BOARD.
WHEREAS, pursuant to the requirements of Chapter 35.77
of the Revised Code of Washington, as amended, and Chapter
47.26 of the Revised Code of Washington, as amended, the City
Council has adopted a comprehensive street program by Resolut-
ion No. 61, and thereafter modified. by Resolution Nos. 70, 107,
137, 15'8, 187, 189, 197 and 208 for the six -year period
following their passage, and
WHEREAS, the City Council of the City of Edmonds, Wash-
ington, has revised the work accomplished under said program,
determined current and future city street and arterial needs,
and based on these findings has prepared a revised and extended
comprehensive street and arterial program for the next ensuing
six years, and
WHEREAS, having held the public hearing on the revised
and extended comprehensive street program,
NOW, THEREFORE, BE IT RESOLVED by the City Council of
the City of Edmonds that the comprehensive street and arterial
program as revised and extended for the ensuing six years for
the City of Edmonds, a copy of which is attached hereto (1971 -
1976, inclusive), setting forth the project location, type
of improvement and the estimated costs therefor, be and the
same is hereby adopted and by this reference incorporated herein
as if fully set forth within the cody of this Resolution; and
BE IT FURTHER RESOLVED that a copy of this Resolution
together with the Exhibit attached thereto (1971 - 1976, inclus-
ive) shall be filed with the Director of Highways and the Urban
Arterial Board for the State of Washington.
ATTEST:
APPROVED:
i
D AYOR
CITY CLERK
FILED WITH THE CITY CLERK: June 16, 1970 a- P&"-cdl 9`161 000
4
SIX YEAR CONSTRUCTION PROGRAM Page 1
1971-1976
June 16, 197 June 16, 1970 227 (COUNTY)
HEARING DATE RDOPTION DATE RESOLUTION NO (CITY) EDMONDS. WASHINGTON
ITEM
NO.
LOCAL NAME
ROAD
OR
STREET
F C
U L
N A
U R
R U
B R
TYPE OF WORK
LENGTHOF
IN
ESTIMATE OF COST
ROAD OR STREET
NO.
C S
A A
MILES
1971
1972
1973
1974-76
TOTAL
T S
N L
1.
Various locations
M6S
U
Traffic Lights
$ 50,000
$ 50,000
$ 50,000
$
$ 150,000
2.
OLYMPIC AVENUE; from Main
C
U
Regrading, widening, concrete
0.9
374,000
374,000
St. to Olympic View Drive
curbs, paving, sidewalks, drainage,
street lighting and erosion contr
1
planting
3.
184TH ST. SW; from 88th
C
U
Acquire right-of-way, paving,
0.6
250,000
250,000
Avenue W, East to Olympic
grading, drainage, street lightin
,
View Drive
and erosion control planting
4.
EDMONDS WAY; from Elm St.
SSIil-W
M
U
Concrete sidewalks, street lighti
g 0.7
98,000
98,000
to Westgate Area
(Paving, curbs & gutters to be
done under State Highway Project)
5.
BOTH AVENUE W; from 184th
C
U
Widening, curbs, gutters,
1.0
370,000
370,000
St. SW to 200th St. SW
sidewalks, drainage. Street
lighting and erosion control
planting.
6.
THIRD AVENUE S; from Pine
C
U
Curbs, gutters, sidewalks,
0.3
92,000
92,000
St, to Elm St.
drainage. Street lighting &
erosion control planting.
7.
DAYTON ST.; from Railroad
C
U
Regrading, Paving, and Drainage.
0.1
40,000
40,000
St. to Sunset Avenue
8.
MEADOWDALE BEACH ROAD;
C
U
Regrading, widening, curbs,
0.7
293,000
293,000
from 76th Avenue W. to
gutters, paving and drainage.
Olympic View Drive
Street lighting, and erosion
control planting.
SA-1 REV. 1/70
SIX YEAR CONSTRUCTION PROGRAM
1971 - 1976
Page 2
HEARING DATE June 16, 1974DOPTION DATE June 16, 1970 227 (COUNTY)
RESOLUTION N0. (CITY) FDMnNDS, WASHINGTON
ITEM LOCAL NAME
No. OF
ROAD OR STREET
ROAD
F
C
U
R
OR
U
L
R
U
STREET
N
A
B
R
TYPE OF WORK
NO.
C
S
A
A
T
S
N
L
9. TALBOT ROAD AND 171ST ST. C U Widening, curbs, gutters, drai
SW from Olympic View Street lighting, 6 erosion con
Drive to 76th Avenue W. planting.
10. 240TH ST. SW; from High- A U Regrading, widening, paving,
way 99 to 78th. 78TH AVE concrete curbs, sidewalks,
W.; from 240th to 236th; drainage, street lighting.
238TH PL SW; 76th to 78th
11.
Arterials, residential 6
access streets at miscel-
laneous locations
12.
MAIN STREET; from 6th
CAM-5S
Avenue to vicinity of 17t
Avenue So. (84th Ave. W.)
13.
NINTH AVENUE SO.; from
CA9A
232d St. SW to Casper St.
14.
76TH AVENUE W.; from 244ti
CS25A
SW to Highway 99
15.
76TH AVENUE W.; from 5th
St. SW to Highway 99
CS25A
16. 76TH AVENUE W.; from 5th ICA25A
St. SE. 212th St. SW.)
to 208th St. SW
S,A U Repair, regrading, widening,
concrete curbs, paving, sidewalks
drainage. Street lighting.
S U Regrading, widening, concrete
curbs, paving, sidewalks and
drainage4
S U Regrading, widening, concrete
curbs, paving, sidewalks, drainag
S U Regrading, widening, concrete
curbs, paving, sidewalks, drainag
S U Regrading, widening, concrete
curbs, paving and drainage.
S U Regrading, widening, concrete
curbs, paving and drainage
LENGTH
IN
MILES 1971
1.4 $ $
0.7
ESTIMATE OF COST
1972 1973 1974.76
25,000 1 235,000
110,000 ' 110,0001 110,000
1.4 (Funded Pr�ject) -
TOTAL
480,000 i$ 480,000
400,000 1 730,000
letion Sdheduled Pridr to 1971
2.0 12,800 [Funded Project) - Ca ry Over Fror 12,800
roject Started in 19 0
1.1 (Funded 4ject) - Completion Scheduled Pri r to 1971
0.8 (Funded Pr)ject) - Completion Scheduled Prior to 1971
0.3 (Funded Pr ject) - C mpletion Scheduled Prior to 1971
DS
SA-1 REV. 1/70
SIX YEAR CONSTRUCTION PROGRAM
1971 - 1976
HEARING DATE June 16, 1970ADOPTION DATE June 16, 1970RESOLUI"ION N0. 227 (COUNTY)
(CITY) _ EDMONDS, WASHINGTON
ROAD IF CI U R
ITEM
LOCAL NAME
No.
OF
STREET
N A
B R
TYPE OF WORK
ROAD OR STREET
NO.
C S
A A
T S
N L
17.
76TH AVENUE W.; from
CA25A
S
U
Regrading, widening, concrete
208th St. SW to 199th SW,
curbs, paving and drainage. (1/2
& from 196th St SW to
street under jurisdiction of City
188th St. SW
of Lynnwood).
18.
76TH AVENUE W.; from
CA25A
S
U
Regrading, widening, concrete
188th St. SW to Olympic new
curbs, paving and drainage.
Drive
(1/2 street under jurisdiction of
Snohomish County)
19.
76TH AVENUE W.;
CS25A
C
U
Regrading, widening, concrete
75th P1 W 6 Lund's Gulch
curbs, paving and drainage.
Road; from Olympic View
Street lighting and erosion
Drive to 72d Avenue W.
control planting.
20.
CASPER ST.; from 3d Ave.
SSH524
M
U
Curbs, gutters, sidewalks,
N. to Ninth Ave. N., Ninti
drainage, paving, widening.
Ave. N. from Casper St.
Street lighting and erosion
to Puget Drive and Puget
control planting.
Drive from Ninth Ave. N.
to Olympic Ave; and 196th
St. SW from Olympic Ave.
to 76th Ave. W.
21.
BOWDOIN WAY; from 9th
CSBW
C
U
Regrading-, widening, paving,
Ave. So. to vicinity
concrete curbs, sidewalks,
of 17th Ave. So.
drainage. -
22.
WALNUT STREET; from 7th
CSBW
C
U
Grading, paving, concrete curbs,
Ave. to 9th Ave.
sidewalks and drainage.
23.
88TH AVENUE W.; from
CS15A
C
U
Clearing,`grading, concrete curbs
I'Jbtn St. to Olympic View
Drive
sidewalks, paving, street lightin
6 erosion control planting.
SA-1 REV. 1/70
Page 3
ESTIMATE OF COST
LENGTH
IN
MILES 1971 1972 1973 1974.76 TOTAL
1.0
0.2
12,500 Funded P
rolect S
12,500 Funded Pr
roject St
2.0 47,500 90,000
(427,500) (810,000
(475,000) (900,000
2.0
0.8
0.3
ect) - Carry Over
ted in 19' 0
ect) - Ca ry Over
ted in 19 0
Improvement to State Highway
Route 524 required in period
i 1971 - 1975
12,500 JEDMONDS
12,500 JEDMONDS
137,500 JEDMONDS
(1,237,500) JUAB
(1,375,000) TOTAL
885,000
(Funded
Pr)ject)
- C
pletion
Scheduled
Pri
r to
1971
(Funded
Pr
ject) -
Completion
S
heduled
Pricir
to
1971
1.0 14,500 35,500
(130,000) (320,000
(144,500) (355,500
50,000 EDMONDS
(450,000) UAB
(500,000)TOTAL
SIR YEAR CONSTRUCTION PROGRAM Page 4
1971 - 1976
June 16 197p June 16 1970 227 (COUNTY)
HEARING DATE ADOPTION DATE ' RESOLUTION NO, (CITY) EDMONDS, WASHINGTON
ITEM
�O'
LOCAL NAME
OF
ROAD
OR
STREET
F C
U L
N A
U R
R U
B R
TYPE OF WORK
LENGTH
IN
ESTIMATE OF COST
ROAD OR STREET
NO.
C S
A A
MILES
1971
1972
1973
1974.76
TOTAL
T S
N L
24.
84TH AVE. W.; from 212th
CS17A
C
U
Widening, concrete curbs, paving,
0.2
(Funded Pr)ject)
- Ccmpletion
Scheduled
Pri
r to 1971
SW to South City Limits
and drainage.
25.
220TH ST SW; from 76th
CS12S
C
U
Regrading, widening, concrete
0.4
E 4,600
? 20,000
$
$
$ 24,600
Ave. W. to Highway 99
curbs, paving, sidewalks, drainage
(41,720)
(180,000)
(221,726)
E from 9th Ave. S. to
Street lighting and erosion contr
1
(46,320)
(200,000)
(246,320)
96th Ave. W.
planting (Joint UAB project with
Snohomish County)
26.
ELM ST.; from 9th Ave. to
CS12S
C
U
Widening, concrete curbs, paving,
0.8
11,300
31,100
42,400
6th Ave.; 6th Ave. from
drainage, sidewalks. Street
(101,600)
(280,000)
(381,600)
Elm to Pine; Pine St.
lighting, and erosion control
(112,900)
(311,100)
(424,000)
from 6th to 5th
planting.
27.
OLYMPIC VIEW DRIVE; from
CSOVD
C
U
Widening, drainage, paving,
2.4
35,000
130,000
165,000.
Olymp c Ave. to 76th
concrete curbs. Street lighting
(2851)000)(1,200,000)
(19485,000)
Ave. W.
and erosion control planting.
(3205000)
1,330,000)
(1,650,000)
28.
NORTH MEADOWDALE ROAD;
CS25A2
C
U
Widening, paving, curbs, gutters,
0.6
18$000
29,000
47,000
from 75th Place W. to
drainage, street lighting, &
(155,800)
(260,000)
(415,800)
68th Avenue W.
erosion control planting.
(173,800)
(289,000)
(462,800)
29.
228TH ST. SW; from 76th
S
U
Widening, paving, curbs, gutters,
0.1
(Funded ProI
•
l7ect) Co
pletion Scieduled
Prior
, to 1971
Ave W. East to city limits
drainage, street lighting, and
erosion control planting. (Joint
UAB project with Mountlake Terrace)
30.
86TH AVE. W.; from 196th
C
U
Widening, paving, curbs, gutters,
0.8
17,800
34,400
52,200
to 212th
drainage, street lighting, and
(159,800)
(310,000)
(469,800)
erosion control planting
(177,600)
(344,400)
(522,000)
31.
228TH ST. SW; from 76th
S
U
Widening, paving, curbs, gutters,
0.1
31900
3900
(34:600)
Ave. W. to ighway 99
drainage, street lighting, and
(34,600
(38,500
(38,500)
erosion control planting
EDMONDS
UAB
TOTAL
EDMONDS
UAB
TOTAL
EDMONDS
UAB
TOTAL
EDMONDS
UAB
TOTAL
EDMONDS
UAB
TOTAL
EDMONDS
UAB
TOTAL
SA-1 REV. 1/70
CITY OR COUNTY
I
EDMONDS _ f
FUNCTIONAL CLASS OF ARTERIAL
_ SECONDARY
Loral Name of \rtrnol
76th AVE WEST
URBAN AREA SIX YEAR C0NSTRUCTI0N PR0GRAM
HEARING DATE June_16,_1970 ADOP1 ION DATE _June 16, 1970 RESOLUTION NO. 222— —
REOUESTFD RFQUESTED U. A TF,UST FUNDS BY PERIOC
URBAN�-
11 ARTERIA!- i 1971 1972 1;173
;:I TRUST — - I 1 1 1974 1 1975 1976
FUNDS 1 /1 7 11 l r l 7 1 l i
fa
t o ' C. o
I
I'unii•,^';, '4 6 12i./31 6 t'30 t i2 %31 6/30 12/31
FUNDED
Il, t.itl it l'oCL1110n of 1' ol.,rrt anJ 1. ni --- - - Y - - ; i 53,593 - - -
CS 25A
From 244th St. SW to
�R','.
Olympic View _Drive
-Provos
3.3
u,.,'ih1i,,ii, ,, a 11or
Widen. to 44', Gr, Dr, Pave, Curb, Swk,
Ill, Stm
51 864
Sewed', Traffic Control,
Erosion Control
Planting
ESTIMATE
OF TOTAL CIOST
- - -- -
�' 975,043
62,000 � 60,000--
1,128,000
1,250,000
- -
I •rl N;iaof 1r1,•,I--------•-
Lr' .i -
-----Ii..
-.:1080,500
_ .. I' I .-
9th Ave. S. &
100th Ave. W.
CA9A
FUNDED
60,100
From 244th St. SW to
Casper St.
2.8
75,200
Widen to 441, Gr, Dr, Pave, Curb, Swk,
Ill, Stm
Sewer, Traffic Control,
Erosion Control
Planting
706,200
-TI41:1 i L
OF TOT,".L U -_
100,000 125,000 1,175,000 1,400,000
228th St. SW S-1
o. I
From 76th Ave. W.
to State -Highway 99- 0.1
Widen to 44', Gr, Dr, Pave, Curb, Swk, I11, Stm
Sewer, Traffic Control, Erosion Control Planting
1805000 180,706
180,000 180,706 (Joint project with City of Lynnwood & Snohomish County - costs relfect
total costs, 1971 & prior 1971, including Lynnwood & Snohomish County portion)
— I
1
(Joint project with Snohomish County- costs reflect total costs including '
Snohomish County portion - cost increases above original estimate will have to ;
201,260 be financed by Edmonds and Snohomish County. Right-of-way acquisition problems
may cause slippage of construction into 1971)
841,500 201,2gC
3,100 3,100
9,000
22,500
34,600
9,000
22,500
34,600
_3,500 101000 25,000 9500
JAB-1 REV.1/70
CITY OR COUNTY l
�DMONDS -__ - ._ J
FUNCTIONAL CLASS OF ARTERIAL
COLLECTOR
Local Namc of A!terlaI
220th St. SW
Arterial No
CS 12 S
URBAN AREA SIX YEAR CONSTRUCTION PROGRAM
HEARING DATE . June 16, 1970 ADOP1 ION DAZ E June 16, -1970 RESOLUTION N0. _227._.
REQUESTED REQUESTED U. A TRUST FUNDS BY PERIOC
URBAN
ARTERIAL 1971 1972 1 1973 — -- I - 1
TRUST 1974 1975 1976
FUNDS 1/1 7%1 1/1��--�•7/1 -— I— 1/1 7%1 I
to to to IIIIIIs to I to to
Priority No. 6 /30 1 2 /3 1 6 /30 1 12/31 i 6 /30 1 2 /31 f
C-1 I; P�— _ I
Deladcd Location of Project and T:rmini L,nkth in Mile
From 9th Ave S. to vicinity
of 72nd Ave. extended 1.7
Description o! P,opused Work�—
Widen to 40"/48', Gr, Dr, Pave, Curb, Swk, Ill,
Traffic Control, Erosion Control Planting, Stm Sewer
11_60,500
izz
I
1 60,000
_F I
45,000 15 50! i
-a— 0--- } — - - - -^ -- -- - - --- --� - --- .
60,000
ESTIMATE OF TOTAL COST
549,200 P50,000
Prelim. Eng.
Right of \\av
Const-u,t!on
1'r t;tt
�1
rntnl
I
90,000 _
100 000
s
803,000 i
1 _ _
993,000
669_,700 105,000 65.500
Local Name or Arterial
Art.rnal No.
f Priont •Nn,
f 5- P.l,.
I
76th Ave.
West
CS 25A
C-2
l
1129500 112,500
Dt-lmlcd L,lcattnn.
of Prolrrt and r,:nntni
l cngth'in \
if;.Jlz
'l1
76th Ave.
W., 75th P1 W.,
Lunds Gulch Rd
f
l` (Joint project with Snohomish County -
2509000 49,200 costs reflect total costs inc lu ing
- - - _ - f Snohomish- County portion)
250_,0.00--------- 49 200__-_-L
I
from Olympic View Drive to 72nd Ave. W. 2.0 180,000 180,000
Uescriplion of Prul),n-. ;: No!k i I --- - -- -----�--------- ..____. — .. ._ ---_-- -- -- ------------ — ,__�
Widen to36=40'Gr, Dr, Pave, Curb, Swk, Ill, Stm
Sewer, Traffic Control, Erosion Control Planting 945,000 1 7--45,000 000,000 300,000
OF TOTAL COST
I
_ESTIMATE
Piclim. Fng. k ghl lla on
I.
F-
U
L
125,000 2009000 1,050,000
1,375,000
1,237,500
•,337,500 500,000
--
l..n,tl Nunn.• of lft. •+:J
- �
to
Olympic View Drive CSOVD
C-3
135,000
O
Dcnitl,•d [.ocaiion of Pnn.cl .ind Ternimi
I_"ngth m '•.hlo
q
From Olympic Ave
2. 4---
2.0,0_0D
1-- -
De:,.r!pUun I' •n:�ul \lo!k
Z
Widen to 36", Gr, Dr, Pave, Curb, Swk,
Ill, Stm
Sewer, Traffic Control, Erosion Control
Planting
1,260,000
- of
OF TOTAL COST
I
-1
_ _ESTIMATE
Prelim. Bnk. ;— Right oI Nay Con.,!ruc;ion
TotaI �
�I
150 000 44 100 000 1 400 000
- 1.._.. --- Y
150 000
'
1 485 000
--�_
3001000
,
80,000 55,000
60,000 1,200,000
809000 42052.000 1, 000
,
AR-1 OFV 1 /7!1
' CITY OR COUNTY
LEDMOND-S
FuwcT0wxLCLASS nFARTERIAL
LCOLLECTOR
����l���� �&��� ����� ��l��l� CONSTRUCTION 1������!���
°~^`~�����~ �=^^=�=�� =°�== ^^�=�=^^� =,~=��~~^^�=~���^^�*=�� PROGRAM
HEARING DATE -June 16" lg7O_ ADOP7ION DATE Juoe�l6° 1970RESOLUTION NO. _��7__
' '- _------
REQUESTED I REQUE5TEOU A TRUSTFUNDS BYPER|OC
onsAw -'_'----__
-� /--_ --_-
ARTERIAL
1971 l977 \973 '
Tm/sr l' - - — '� '-- - ' �' ---'-� l974 l
ruwo� r'� / )/\ ' r'| 1// � r//
to
/ Local w^='"/x,u,.,/ A,m."/w
| 6/tn 1
/2/31
/ 6/30 / 12/3/
^/zn | |z/z/
88tb Ave. W. CS 15&
.
--'__--- -__-
z o./,./'o / °"""" "/ p"v'u ""o �."".".
From '^~-6tb 8t SW to ` �
�CL �
~'
.
45vU0U
Olympic View Drive l'U '^~
` o'"."r^',n .`' r."p.^'u «,a |
.
Widen to 36^ Qr, Dr, Pave, Curb, Swk, Ill, Stm �
���»»»
45^000
,
Sower, Traffic Control, Erosion Control Planting
.. ESTIMATE OF TOTAL COST .
3G�,0OO
4U,00O
�200�OUO l3U,U8U
/
>
/----_---_-''-.-�`.10��.�0' /
�� p."/.". /`"g� [
-
-
508J000
�u5g^00O
1300000
2Uo,OUO l2O,0OV
. /^^./ x"un'^/A"'"`./
'
Elm Street CS l3 � C-5
34,200
349208
/ ^..,",/,'^^',.,/r.,`�^",,./,. /`,",..,.,/.',.
Elm St (From gtb to 6tb) btb Ave 3 (From Elm
xn
to Pine) Pine St (From Gtb to 5tb) 0.8
45,000
45,000
---------------------'--'--
gldao to 36", Qr, Dr, Pave, Curbs, Swk, Ill, Stm Sewer
Traffic Control, Erosion Control Planting
_-_-__-_----_ ----,/.`.
302,400
22,400
180,000 100,000
sS�/m�re OF Tor�� cosT
.
'
`-'--- _- ' '-- _ '
38,000 60,000 336,000 424,000
381,600
101^680
180,000 100,000
North Meadowdala Road CS25A2 C-6
37,800
�
°
25,000 13,800
From 75tb Place W.
Ave. W^- 0.8
90"O 00
``
90"000
_t_Q-68th-
� ^",` ''^'
"
'' �
Widen to 36' , Qr, Dr, Pave, Curb, Swk, Ill, Stm
�
Sewer, Traffic Control, Erosion Control Planting
288,0O0
- �
28,000 260,000
esT|wArc OF IOTA!COST
---�
42,000 lDO,U08 320�O00 .4b2,000
4l5,8O8
.,
��
�
25,DOO l3O,80O
--_--___-'--_|
/
)AB-1 msv 1/70
F
CITY OR COUNTY URBAN AREA SIX YEAR CONSTRUCTION PROGRAM
HEARING DATE June 16, 1970. ADOPI ION DAI E June 16, 1970-- RESOLUTION NO. 227
LEDMONDS--_- --7 ---- -
REQUESTED REQUESTED U. A TRUST FUNDS BY PERIOD
FUNCTIONAL CLASS OF ARTERIAL URBAN
ARTERIAL
1 1971 ---1-972 1973
'OLLECTOR TRUST
1i 1 FUNDS 1/1 1 7 1 711 7 /1 1974 1975 1976
to to t 0 to to
I. Local Narric of.Artcrial Vlcm;l N, Priority No, 6 /30 12 /31 6/30 12 6/10 12/31
88th Ave. W. CS 15 C-7
2. Dctaflcd Location of Projoct and Tcrmml I _42,300__ 25,000 17,300
From 196th St. SW R 4-- - --- - - - -
to 21-2th St SW 0.8
DesErip(i,in of Pmpos—(; \\ork 67,500 67,500
Widen to361-4013r, Dr, Pave, Curb, Swk, Ill, Stm.:
Sewer, Traffic Control, Erosion Control Planting
ESTIMATE OF TOTAL COST 360,000 501000 310,000
4. ptchn.. Frig. Riehl nl \\,iv
25,000 134,800 310,000
L,,�al Nam. of Wcril 5. 11 11.
D' til I 1---d LOcA 11 Orl of PF"I "I 1 11111 I inl
t. Dom Upton of Pwp-)c, J %\,,rk
ESTIMATE OF TO I'AL COST
111, 11,11 Vn'..
1--! V-
ESTIMATE OF TOTAL COST
7
A Prelim. Fng. R ght 1,f
IAS-I REV.1/70
L