Loading...
Resolution 264RESOLUTION NO. A RESOLUTION OF THE CITY OF EDMONDS, WASHINGTON, ADOPTING A RE- VISED COMPREHENSIVE SIX-YEAR STREET CONSTRUCTION PROGRAM TO BE FILED WITH THE DIRECTOR OF HIGHWAYS AND THE URBAN ARTERIAL BOARD. WHEREAS, pursuant to the requirements of Chapter 35.77 of the Revised Code of Washington, as amended, and Chapter 47.26 of the Revised Code of Washington, as amended, the City Council has adopted a comprehensive street program by Resolution No. 61, and thereafter modified by Resolution Nos. 70, 107, 137, 158, 187, 189, 197, 208, 227 and 242, for the six-year period following their passage, and WHEREAS, the City Council of the City of Edmonds, Washington, has reviewed the work accomplished under said program, determined current and future city street and arterial needs, and based on these findings has pre- pared a revised and extended comprehensive street and arterial program for the next ensuing six years, and WHEREAS, having held the public hearing on the revised and extended comprehensive street program, NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Edmonds that the comprehensive street and arterial program as revised and extended for the ensuing six years for the City of Edmonds, a copy of which is attached hereto (1973 - 1978, inclusive) setting forth the project location, type of improvement and the estimated costs therefor, be and the same is hereby adopted and by this reference incorporated herein as if fully set forth within the body of this Resolution; and BE IT FURTHER RESOLVED that a copy of this Resolution together with the Exhibit attached thereto (1973 - 1978, inclusive) shall be filed with the Director of Highways and the Urban Arterial Board for the State of Washington. APPROVED: MAYOR ATTEST: CITY CLERK (DE UTY) FILED WITH THE CITY CLERK: June 20, 1972 ADOPTED BY COUNCIL: June 20, 1972 /�J DISTRIBUTION: SIX YEAR CONSTRUCTION PROGRAM (1) copy: District Engineer. Dept. of Highways (1) Copy: UAB with Original UAD-1 Form 1973-1978 HEARING DATE 6/20/72 ADOPTION DATE _fi=72--�64— RESOLUTION NO. (COUNTY) I(CITY) EDMON. ASHINGTON ITEM NO. 3. 4. 5. 6. 7. 8. LOCAL NAME OF ROAD OR STREET ROAD F C U R OR U L R U STREET N A B R NO. C S A A R/W, Dr, Gr, Pave, Curb, T S N L Various Locations MILS U Da ton St.; from Railroad St. to Second Avenue S. C U Olympic Ave; from Main St. to Olympic View Dr. 184th St. S.W.-183d PI.S.W from 88th Avenue W. to- Olympic oOlympic View Dr. 80th Avenue W; from 184th St. S.W. t0 00th St. S.W. Third Avenue; from Pine St. o ETM--S—t. Meadowdale Beach Road; Trom 7bth Ave. W. to Olyrmp Vi ew Dr. Talbot Road & 171st St.; rrom uiympic View Dr. tt 16th Ave. W. IC u i C U is St. C U path, C U 0.3 R/W, Dr, Gr, Pave, Curb, C U IC u i C U is St. C U path, C U TYPE OF WORK Traffic Lights LENGTH IN MILES R/W, Dr, Pave, Curb, Swk, St. light, planting, bicycle path, U.G. Wiring 1 0.3 R/W, Dr, Gr, Pave, Curb, Swk, St. Light,Landscaping, U.G. Wirind r 0.9 R/W, Dr, Gr, Pave, Curb, Swk, St. i Light, Landscaping, U.G. Wiring 0.6 R/W, Dr, Gr, Pave, Curb, Swk, St. Light, Landscaping, U.G. Wiring 1.0 R/W, Dr, Gr, Pave, Curb, Swk, St. Light, Bicycle Path, Landscaping, 0.3 U.G. Wiring R/W, Dr, Pave, Curb, St. Light, planting U.G. Wiring 2.7 R/W, Or, Pave, Curb, Planting, St. Light, Recreational Walk, U.G.i 1.4 Wiring 1973 50,000 100,000 1 i 410,000 300,000 100,000 300,000 ESTIMATE OF COST 1971 1975 1976-78 $ 50,000 50,000 150,000 460,000 Page 1 TOTAL 300,000 100,000 410,000 300,000 460,000 100,000 300,000 480,000 1^iSTRI.0'1014: SIX YEAR CONSTRUCTION PROGRAM 11 capY: District Englh" , Dept. of Hignwsys t [npY: UAB with Origir4l UAB -1 Foran 1973-1978 HEARING DATE 6/20/72 ADOPTION DATE 6/20/72 RESOLUTION NO. 264 ( (CITY))Y) Snohomish ITEM LOCAL NAME NO. OF ROAD OR STREET SA -1 REV.2/72 ROAD 9. 240th St. S.W. ; from US 9S o t t Avenue W.; U L R U from 240th—t-6-fYrth St. LENGTH STREET 238th P1. S.W.• 76th to 79th Avenue B R TYPE OF WORK W. NO. 10. Arterials, residential & MILES Access streets at misc. T S N L locations UAB 11. 76th Avenue W; 75th P1. W. un s u c Road; from ympic View—Fr.—to 72d W. SR 524:L3g-Eys UAB 12. St; from 3d Ave. h to NfntFVve. N; Ninth Av North from Caspers St. Puget Drive; Puget Drive from Ninth Ave. N. to Olympic Ave. 196th St. S.w from Olympic Ave. to 64th Avenue W. UAB 13. 88th Avenue W; from 196th • . to ympic View Drive UAB 14. 220th St. S.W.; from US 99 o ve. ,- SA -1 REV.2/72 ROAD F C U R OR U L R U LENGTH STREET N A B R TYPE OF WORK IN NO. C S A A MILES T S N L SR524 A U R/W, Dr, Gr, Pave, Curb, Swk, St. Light, U.G. Wiring, Planting 1 0.7 S A I UI R/W, Dr, Gr, Pave, Curb, Swk, St. Light, U.G. Wiring, Planting S,C U I R/W, Dr, Gr, Pave, Curb, Swk, St.1 Light, U.G. Wiring, Planting & 2.0 Bicycle path M U Dr, Gr, Pave, Curb, Swk, St. Light , 2•9 U.G. Wiring, Planting, Bicycle Pal h, (Joint Project with City of Lynnwood and Washington State Highway Depi. District No. 1) C I U I R/W, Dr, Gr, Pave, Curb, Swk, St. Light, U.G. Wiring, Planting 1973 ESTIMATE OF COST 1974 1975 F 1976-78 $ 35,000 300,000 110,000 110,000 110,000 165,000 485000 ,650,000 1 0.9 10,000 (90,000 100 -ho -05 C U R/W, Dr, Gr, Pave, Curb, Swk, I11 1.6 U.G. Wiring, Planting, Bicycle Path, {Joint Project W/Sno. Cnty. 20,000 180,000 200,000 Nage ie TOTAL $ 335,000 400,000 730,000 165,000 1,485,000) Improvement to State;Highway 220,000 Route 524lrequired in' 1973-15 1,980 000 period 0 51,500 463,500 515,000 95,000 950,'000 61,500 553,500 615,00 115,000 1,035_,000 1,150,000 Edmonds UAB Total Ed/ Lyn UAB Total Edmonds UAB Totill Ed/Sno.Co. UAB Total UAB UAB UAB UAB UAB UAB DISTRIBUTION: SIAL YEAR CONSTRUCTION PROGRAM r (1) copy: District Engineer, Dept. 01 Highways (11 copy: UAB W, Original UAB -1 Form 1973-1978 HEARING DATE 6%20/12 ADOPTION DATE 6/20/12 RESOLUTION NO. 264 (COUNTY) Snohomish (CITY) FdMonrk- Washington I LOCAL NAME ROAD F Ci U R LENGTH ESTIMATE OF COST NO. OF ROAD OR STREET STREET NO. N A C S B R A A TYPE OF WORK IN MILES T S N L 1973 1971 1975 197678 TOTAL ti 15. Elm treet; from 9th Ave. to 6thAve; 6th Ave. fran C U R/W, Dr, Gr, Pave, Curb, Swk, I11, 0.8 11,300 31,100 42,400 Elm to Pine; Pine St. from 6th Ave. to 5th Ave. U.G. Wiring, Planting101,600 380000 381;600 ' I 0 16. Olympic View Drive; from Olympic Ave. to 76th Ave. R. C U R/W, Dr, Gr, Pave, Curb, Swk, I11�, 2.4 35,000 130,000 I 165,000 U.G. Wiring, Planting, Bicycle J285 000 2001000 11,485,000) Path .33 0,000 11,650,000) 17. North Meadowdale Road; C U R/W, Dr, Gr, Pave, Curb, Swk, I11, 0.6 18,000 29,000 47,000 from 75th P1. W. to 68th Avenue West U.G. Wiring, Planting (155,800)1( 260,000) 415,800 , s 18. 228th St. S.W.; from S U Dr, Gr, Pave, Curb, Swk, I11, 0.1 Funded Project undir Construction 76th ve. W. to City limit Planting, U.G. Wiring (Joint Project W/Mountlake Terrace) 19. 88th Avenue W• from 196t S.W.to Z12th St. S.W. C U R/W, Dr, Gr, Pave, Curb, Swk, I11, 0.8 17,800 34,400 52,200 U.G. Wiring, Planting Q59,800) 310,000 (469,800) 20.:28th St. S.W.; from 16th S U R/W, Dr, Gr, Pave, Curb, Swk, I11, 0.1 10,000 10,000 Ave. W. tv S 99 U.G. Wiring, Planting (90,000)90 000 0�0 100,000' 21. 236th St. S.W.; from US 99 to 76th S U R/W, Dr, Pave, repair, Curb, Swk, 0.3 100.,000 100,000 Avenue W. Ill, U.G. Wiring, Planting ar._ 1 Mr. V. Ll 1L Page 4 DISTRIBUTION. SIX YEAR CONSTRUCTION PROGRAM (1) copy: District Enq,near, Dept. 01 Mi0hwatys (1) copy: UAB with Orismai UAB -1 Forth 1973-1978 HEARING DATE 6/20/72 ADOPTION DATE 6/20/72 RESOLUTION N0. 264 (COUNTY) Snohomish (CITY) ITEM NO. LOCAL NAME OF ROAD OR STREET ROAD OR STREET NO. F C U R U L R U N A B R C S A A T S N L TYPE OF WORK LENGTH IN MILES ESTIMATE OF COST 1973 1974 1975 1976-78 TOTAL 22. 80th Avenue W; from 212th S U R/W, Dr, Gr, Pave, Curb, Swk, I11. 0.8 200,000 280,000 480,000 St. S.W. to 706th St. S.W U.G. Wiring, Planting 206th St. S.W.; from 80th ve. W. to 92d Ave. W. 82d Ave. W; from 206th St S.W.o th St. S.W. j 204th St. S.W.; from 82d Ave. W. to 83d Ave. W. 83d Ave. W. , from 204th I St. to 200th St. S.W 23. Edmonds Way; From east SR104 M U Walks, I11, Planting 0.5 909000 90,000 ity Lim is to Paradise Lane { i 1 I