Loading...
2019-07-23 City Council - Full Agenda-24071. 2. 3. 4. 5. 6. 7. o Agenda Edmonds City Council snl. ,nyo COUNCIL CHAMBERS 250 5TH AVE NORTH, EDMONDS, WA 98020 JULY 23, 2019, 7:00 PM CALL TO ORDER/FLAG SALUTE ROLL CALL APPROVAL OF THE AGENDA PRESENTATIONS 1. Oath of Office/Swearing In Ceremony - Police Sergeant Damian J. Smith and Police Corporal Brian V. McIntyre (15 min) 2. Annual Visit and Update from Federal Lobbyist (15 min) AUDIENCE COMMENTS (3-MINUTE LIMIT PER PERSON) - REGARDING MATTERS NOT LISTED ON THE AGENDA AS CLOSED RECORD REVIEW OR AS PUBLIC HEARINGS APPROVAL OF THE CONSENT AGENDA 1. Approval of Council Special Meeting Minutes of July 16, 2019 2. Approval of Council Meeting Minutes of July 16, 2019 3. Approval of claim, payroll and benefit checks, direct deposit and wire payments. 4. Acknowledgment of Claim for Damages 5. May 2019 Monthly Financial Report COUNCIL COMMITTEE REPORT 1. Council Finance Subcommittee Report and Minutes (5 min) 8. ACTION ITEM 1. Report on Bids for the Dayton Street Stormwater Pump Station Project and contract Award (15 min) 9. STUDY ITEM 1. Budget discussion to review overarching Council and community priorities (120 min) 10. MAYOR'S COMMENTS 11. COUNCIL COMMENTS 12. CONVENE IN EXECUTIVE SESSION REGARDING PENDING OR POTENTIAL LITIGATION PER RCW 42.30.110(1)(1). 13. RECONVENE IN OPEN SESSION. POTENTIAL ACTION AS A RESULT OF MEETING IN EXECUTIVE SESSION. Edmonds City Council Agenda July 23, 2019 Page 1 ADJOURN Edmonds City Council Agenda July 23, 2019 Page 2 4.1 City Council Agenda Item Meeting Date: 07/23/2019 Oath of Office/Swearing In Ceremony - Police Sergeant Damian J. Smith and Police Corporal Brian V. McIntyre Staff Lead: Al Compaan Department: City Clerk's Office Preparer: Scott Passey Background/History N/A Staff Recommendation N/A Narrative Newly -promoted Corporal Damian J. Smith will take the oath of office for his new position of Police Sergeant, and newly -promoted Officer Brian V. McIntyre will take the oath of office for his position of Police Corporal. Packet Pg. 3 4.2 City Council Agenda Item Meeting Date: 07/23/2019 Annual Visit and Update from Federal Lobbyist Staff Lead: Patirck Doherty Department: Community Services Preparer: Patrick Doherty Background/History Tim Lovain, of Crossroads Strategies LLC, is the City's contract lobbyist/strategist in Washington, DC, assisting the City with securing critical funding for important major projects in Edmonds, such Highway 99 redevelopment, Edmonds Marsh restoration and Willow Creek daylighting, as well as other infrastructure and capital projects, as well as representing the City on any legislative issues that may affect us and regarding which we may have an opportunity to submit comment or concern. Staff Recommendation No action. Presentation only. Narrative Mr Lovain is making his annual visit to the Seattle area next week and wishes to touch base with his clients, including the City of Edmonds. He will offer a brief update on the work he has been doing on our City's behalf over the past few months. There will be an opportunity for brief comments or Q&A from Council as well. Packet Pg. 4 6.1 City Council Agenda Item Meeting Date: 07/23/2019 Approval of Council Special Meeting Minutes of July 16, 2019 Staff Lead: Scott Passey Department: City Clerk's Office Preparer: Scott Passey Background/History N/A Staff Recommendation Review and approve the draft meeting minutes on the Consent Agenda. Narrative N/A Attachments: 07-16-2019 Draft Council Special Meeting Minutes Packet Pg. 5 6.1.a EDMONDS CITY COUNCIL SPECIAL MEETING DRAFT MINUTES JULY 169 2019 Elected Officials Present Staff Present Diane Buckshnis, Councilmember Mike Nelson, Councilmember Adrienne Fraley-Monillas, Council President Dave Teitzel, Councilmember Tom Mesaros, Councilmember Mike Nelson, Councilmember Kristiana Johnson, Councilmember Neil Tibbott, Councilmember Dave Earling, Mayor Elected Officials Absent Mike Nelson, Councilmember 1. CALL TO ORDER/CONVENE IN JURY MEETING ROOM At 6:45 p.m., the City Council Special Meeting was called to order by Mayor Earling in the Council Chambers, 250 5t' Avenue North, Edmonds. 3. CANDIDATE INTERVIEWS FOR APPOINTMENT TO A CITY BOARD OR COMMISSION The Council then convened in the Jury Meeting Room and interviewed Rae Podrebarac, a candidate for appointment to the Sister City Commission. ADJOURN At 6:55 p.m., the meeting was adjourned. Edmonds City Council Draft Minutes July 16, 2019 Page 1 Packet Pg. 6 6.2 City Council Agenda Item Meeting Date: 07/23/2019 Approval of Council Meeting Minutes of July 16, 2019 Staff Lead: Scott Passey Department: City Clerk's Office Preparer: Scott Passey Background/History N/A Staff Recommendation Review and approve the draft meeting minutes on the Consent Agenda. Narrative N/A Attachments: 07-16-2019 Draft Council Meeting Minutes Packet Pg. 7 6.2.a EDMONDS CITY COUNCIL DRAFT MINUTES July 16, 2019 ELECTED OFFICIALS PRESENT Dave Earling, Mayor Adrienne Fraley-Monillas, Council President Michael Nelson, Councilmember Kristiana Johnson, Councilmember Thomas Mesaros, Councilmember Diane Buckshnis, Councilmember Dave Teitzel, Councilmember Neil Tibbott, Councilmember 1. CALL TO ORDER/FLAG SALUTE STAFF PRESENT Phil Williams, Public Works Director Shane Hope, Development Services Director Scott James, Finance Director Kernen Lien, Environmental Program Mgr. Thom Sullivan, Facilities Maintenance Mgr. Jeff Taraday, City Attorney Scott Passey, City Clerk Jerrie Bevington, Camera Operator Jeannie Dines, Recorder The Edmonds City Council meeting was called to order at 7:00 p.m. by Mayor Earling in the Council Chambers, 250 5t1i Avenue North, Edmonds. The meeting was opened with the flag salute. 2. ROLL CALL City Clerk Scott Passey called the roll. All elected officials were present. 3. APPROVAL OF AGENDA COUNCILMEMBER MESAROS MOVED, SECONDED BY COUNCILMEMBER BUCKSHNIS, TO MOVE ITEMS 8.3 AND 8.4 TO 8.1 AND 8.2 AND RENUMBER THE REMAINING ACTION ITEMS. MOTION CARRIED UNANIMOUSLY. COUNCIL PRESIDENT FRALEY-MONILLAS MOVED, SECONDED BY COUNCILMEMBER MESAROS, TO APPROVE THE AGENDA IN CONTENT AND ORDER AS AMENDED. MOTION CARRIED UNANIMOUSLY. 4. APPROVAL OF CONSENT AGENDA ITEMS COUNCIL PRESIDENT FRALEY-MONILLAS MOVED, SECONDED BY COUNCILMEMBER MESAROS, TO APPROVE THE CONSENT AGENDA. MOTION CARRIED UNANIMOUSLY. The agenda items approved are as follows: 1. APPROVAL OF COUNCIL SPECIAL MEETING MINUTES OF JULY 2, 2019 2. APPROVAL OF COUNCIL MEETING MINUTES OF JULY 2, 2019 3. APPROVAL OF CLAIM, PAYROLL AND BENEFIT CHECKS, DIRECT DEPOSIT AND WIRE PAYMENTS 4. CONFIRM APPOINTMENT OF BOARD AND COMMISSION CANDIDATE Edmonds City Council Draft Minutes July 16, 2019 Page 1 Packet Pg. 8 6.2.a 5. WDFW CONTRACT FOR FISHING PIER 6. INTERLOCAL AGREEMENT WITH EDMONDS SCHOOL DISTRICT FOR MEADOWDALE PRESCHOOL 7. PROPOSAL FOR PERSONAL SERVICES CONTRACT FOR PROGRAM ADMINISTRATOR AT THE WASTEWATER TREATMENT PLANT 8. PROBATION OFFICER COURT POSITION 9. APPROVE CONTRACT FOR JERRIE BEVINGTON 5. PRESENTATION 1. STUDENTS SAVING SALMON YEARLY COUNCIL REPORT 2019 Members of Student Saving Salmon (SSS) making the presentation introduced themselves: • Mariam Gold, a graduate of Edmonds-Woodway High School, two years in SSS and will be attending Denison University in Ohio • Emma Gibson, a junior this fall in full IB program at Edmonds-Woodway High School • Mackey Guenther, a graduate of Edmonds-Woodway High School and will be attending USC in fall 2020 • Erin Francisco, in SSS for three years and will be attending Cal Poly Ms. Gold explained SSS is a club at Edmonds-Woodway High School whose focus is to protect and restore salmon habitat and track salmon populations in Edmonds. The club is a citizens science project which means the data collected is at a State standard and can be used to enact legislative change in the City of Edmonds or Washington State. Students join SSS for many different reasons including interest in a future career in conservation biology, hands-on experience with scientific procedures and equipment, a desire to help the environment, to meet others who are passionate about environmental action, or to engage in the Edmonds community more deeply. SSS does monthly water quality measurements in Shell, Willow and Shellabarger Creeks and the Edmonds Marsh. Students from Meadowdale High School monitor Perrinville and Lunds Gulch Creeks. Ms. Gold explained the measurements provide information regarding future salmon runs, the conditions in the stream and whether they are conducive to a healthy salmon population. SSS takes part in many salmon stewardship projects such as habitat restorations along Shell Creek to make it more habitable for a wider variety of aquatic life and salmon, conducting salmon surveys every fall to count the number of salmon in the steams, working with the Willow Creek Hatchery to raise and release coho fry into Shell Creek, using hatchboxes to place eggs in Shell Creek, and community outreach such as door-to-door outreach to homes on Shell Creek about how be more engaged with the salmon population and presentations to various community groups, and having a booth at many community events. Ms. Gibson explained monthly monitoring of local creeks and the Edmonds Marsh has been done for the past four years. The monitoring done by the citizens' science project, the Edmonds Stream Team, is designed to be similar to scientific monitoring conducted by the State in larger streams and rivers. The data can be used to determine water quality in Edmonds streams that meet requirements in the Washington Administrative Code (WAC). She displayed photographs of professional monitoring devices that provide scientific measurements on different water variables including dissolved oxygen, pH, temperature, salinity, conductivity, turbidity and nitrates. They also document physical conditions each month such as water depth, flow, channel width, vegetation and bottom substrate. Edmonds City Council Draft Minutes July 16, 2019 Page 2 Packet Pg. 9 6.2.a Ms. Gibson reviewed monitoring results that apply to the principal parameters that affect aquatic life especially those that can hinder or impact salmon population — pH, water temperature and dissolved oxygen. Water temperature is a crucial factor for salmon and aquatic life. High water temperatures can kill cold water species such as salmon. She displayed a graph of water temperature in lower creeks and marsh August 2015-July 2019, that illustrates all the creeks have been below the maximum temperature (63.5° F); however, the Edmonds Marsh has exceeded this maximum water temperature every summer, with the highest water temperature of 73.3° F. Ms. Gibson explained dissolved oxygen in creeks and the marsh is critical for spawning and survival of salmon. She displayed a graph regarding dissolved oxygen in creeks that illustrated the lower portions of creeks where salmon spawn had dissolved oxygen levels at or above the minimum requirement (8.0 mg/L) and most were above 11.0 mg/L each winter which is optimum for salmon eggs in gravel. She displayed a graph of dissolved oxygen at Edmonds Marsh outlet and edges of Marsh, explaining the water exiting the Marsh is indicative of the main body of water and are that students are unable to access. The graph illustrates the northern and eastern edges of the marsh were below the monthly standards; the northern edge was typically 2.5 mg/L and often below 2 mg/L which is lethal to most aquatic organism. Ms. Gibson displayed a graph of pH in lower creeks and Edmonds Marsh that illustrates the pH in lower creeks is within the State standards (6.5 to 8.5). The water exiting the marsh has also been within the State standard except for one sample. This is good news because water that is too acidic is also lethal to aquatic organism. Although the general water quality parameters are good for salmon, there are some concerns with pollutants that enter creeks through stormwater drains. Using the $15,000 that the Council provided in 2018 and 2019, SSS has collected quarterly water samples during rain events which were sent to an accredited lab in Everett where the samples are analyzed for petroleum compounds and heavy metals. SSS will continue collecting samples through the end of 2019 and provide the Council a complete report. One of the greatest concerns to date is the detection of seven carcinogenic hydrocarbons that exceed the Washington State human health criteria for consumption of water and organisms, especially on the east edge near SR104 where runoff drains directly into the marsh. Mr. Guenther explained salmon stewardship includes monitoring and improving conditions for salmon in Edmonds. SSS is involved in stewardship through an array of efforts. To ensure maximum impact and return, SSS is focused on Shell Creek as it is currently the only stream in Edmonds with salmon runs but the goal is to see salmon return to all Edmonds creeks. Stewardship became a club focus through identification of areas for improvement in stream conditions during monthly water quality monitorings, a great opportunity to periodically evaluate conditions in streams. One of the primary focuses of the stewardship activities is streamside habitat restoration. Streamside vegetation affects salmon in a number of ways. In particularly, increased shade from vegetation keeps streams cool and native plants attract insects that are food for juvenile salmon. Reduction of sediment into creeks is also aided by streamside habitat restoration. After determining the need for improved streamside habitat along Shell Creek, SSS began restoration projects in 2017. Since then 600 native plants of more than 20 different species have been planted across 6 different private properties, some of which had to first be cleared of invasive species such as blackberry and ivy. In March 2019, 40 students and community volunteers planted 160 native plants at a site on Shell Creek next to Holy Rosary Church. Because previous plantings failed due to foraging by mountain beavers, wire cages were used to protect the new plants. Olympic Fly Fishers of Edmonds donated the funding used to purchase the plants and wire for the planting event. Other plantings have taken place on private property where SSS have educated streamside homeowners on ways to maintain their portion of the steam. Mr. Guenther explained salmon migrate back from the ocean into streams during the fall; during October and November, SSS survey streamside homeowners on lower Shell Creek to determine the presence or Edmonds City Council Draft Minutes July 16, 2019 Page 3 Packet Pg. 10 6.2.a absence of salmon and assess habitat conditions that might impact salmon return and spawning. The surveys have allowed SSS to identify several fish passage barriers, improved stream conditions and to begin discussions with important stakeholders. Unfortunately, very few salmon or evidence of spawning were seen this year. Some residents who were surveyed said this was the first time they had seen no salmon at all. SSS has assisted the Willow Creek Salmon Hatchery with the incubation and release of coho salmon since 2017. Students contribute to nearly every function of the hatchery including preparing the hatchery pond, feeding juvenile salmon and many other responsibilities. The water quality data collected during monthly monitorings was used to successfully petition the State to allow the placement of over 1,000 juvenile coho salmon from the hatchery measuring 3-4 inches in length into upper Shell Creek. Placing salmon in upper Shell Creek is important as that spawning habitat has been inaccessible to adult salmon due to manmade obstacles. Meadowdale High School students also assisted at a chum hatchery located in upper Lunds Gulch Creek which raised 10,000 chum salmon for release into lower Lunds Gulch. Mr. Guenther explained one of the most recent stewardship efforts was installation of instream egg incubators, known as hatchboxes which are designed to hold fertilized salmon eggs in a stream until the eggs hatch and fry emerge, allowing for eggs to be hatched under more natural conditions than a hatchery. Each egg is placed in an individual chamber that has holes large enough to allow water passage but too small for the egg to pass through. Once the egg is hatched and the newborn salmon consumes its yolk sac, the salmon fry is slim enough to pass through the hole and into the stream. The first attempt at hatchbox incubation last year using a similar hatchbox failed due to sediment buildup within the hatchbox chambers. This year, thanks to another donation from the Olympic Fly Fishers, both Edmonds-Woodway and Meadowdale High School students were able to install multiple hatchboxes on sites on Shell and Lunds Gulch Creeks with an overall egg hatching release rate of 89%. SSS hopes to continue the success with hatchboxes in these creeks next year with expanded installation and plan to place 3,000 coho eggs in hatchboxes in Shell, Willow and Lunds Gulch Creeks as well as 2,000 chum eggs in lower Shell and lower Lunds Gulch. SSS is involved in a variety of steward efforts that take a great deal of planning and preparation but are also involved in shorter term projects to improve salmon habitat whenever the opportunity presents itself. For example, last Saturday a culvert on Shell Creek near 7t' Ave N that was severely obstructed for salmon passage by tree roots and sediment accumulation was cleared. Ms. Francisco relayed recommendations based on SSS's observations over the past year. • Passage barriers o Removal of manmade waterfall on private property in Shell Creek ■ Totally blocks adult salmon passage above 7t' Ave ■ SSS has offered assistance with applying for funding to remove the obstacle, the owner has been unwilling to discuss o Remove impassable culvert under Talbot Road and in Shell Creek near Yost Park o Eliminate passage blocking debris/logs at Brackett's Landing Sediment o Address sediment build-up in Shell Creek downstream of Yost Park ■ Hinders spawning of chum and coho salmon ■ Erosion on the bluffs in Yost Park likely contribute to the problem o Develop watershed development plan in Perrinville Creek basin Marsh o Restore saltwater estuary o Remove Hwy 104 fences o Keep tide gate open year-round Edmonds City Council Draft Minutes July 16, 2019 Page 4 Packet Pg. 11 6.2.a o Remove invasive vegetation and plant native vegetation • Stream Monitoring and Surveys o Continued Council support including the annual funding Councilmember Mesaros asked who maintains the monitoring data to ensure it is available into the future. Joe Scordino explained when the program first started, the intent was to have the data accessible through the City. However, due to the volume of data, it was determined that it would be best to have it managed by the students and him. Eventually it will be available on the City's website. Councilmember Mesaros said he was less concerned about making the data available on the website and more concerned with preserving the data and making it easily accessible. It is important scientific data and becomes even more important the longer monitoring is done. He recommend SSS think about that issue and develop a solution over the next year to ensure the data is institutionally housed somewhere. He also suggested evaluating progress on the SSS 2015-2018 recommendations in order to have a broader plan of solution as well as identifying problems. Councilmember Nelson complimented the students on their report, finding it very concise, user friendly, professional and readable. He commented an easy statistic to track is when people start seeing salmon, something everyone wants to see happen. He appreciated the recommendations and was eager for the Council to begin implementing some of them and to give SSS give more tools and assist them in working with private property owners. Council President Fraley-Monillas thanked Mr. Sordino and the students for the amount of time they spend collecting data. She noted there are also a number of adult volunteers. Mr. Sordino said the number of volunteers varies; when efforts are publicized such as the planting, more people volunteer. Council President Fraley-Monillas asked if there has been pushback from private property owners about entering their property. Mr. Scordino there are 40 residences along the edge of lower Shell Creek, only 4 residences refused access, the rest have been very cooperative. Council President Fraley-Monillas asked if those property owners' refusal to provide access impedes the students' work. Mr. Scordino said students make observations from the other side of the creek. For example, with the culvert that was cleared, one property owner did not provide access so efforts were conducted from one side. He concluded they are able to work around properties where owners do not allow access. Councilmember Teitzel applauded and thanked the students for their work to restore salmon habitat and thanked Mr. Sordino for spending time with him at the site of the waterfall on Carol Way. He has sent the homeowner two letters asking them to meet with him to discuss the issue and has received no response. He referred to the Elwha River restoration where two large dams were removed and king salmon began returning upriver almost immediately. If dams can be removed to restore habitat, it should be possible to remove a 5-foot waterfall that blocks over a mile of good salmon habitat. He suggested the Council join him in identifying that issue as a priority in the next several months. Councilmember Johnson asked if hatchboxes were released westward of 7' Ave. Mr. Scordino said the focus is upstream; since adult salmon cannot get above the waterfall, the hatchboxes are placed in the areas where they would have been if the adults could have reached those upstream areas. When the salmon return, it will be to the area below the waterfall, a population that needs to be boosted due to declines. Councilmember Johnson said she has seen pictures of enormous acrobatic feats by wild salmon doing to overcome barriers. She asked if it would be possible to install a fish ladder next to the waterfall so the residents could retain the waterfall but salmon could reach spawning areas. Ms. Gold answered the homeowner does not want the waterfall removed as they anticipate it will decrease their property value. A Edmonds City Council Draft Minutes July 16, 2019 Page 5 Packet Pg. 12 6.2.a number of solutions have been proposed such as a step system, but it has been difficult to get the property owner to listen to suggestions. Councilmember Johnson inquired about Hindley Creek. Mr. Scordino said it enters Shell Creek at Brookmere Street near Caspers Street. Councilmember Johnson observed 33 students at Edmonds- Woodway High School participate in SSS;. she thanked the students and adult volunteers for their efforts. She recalled SSS was started by Mr. Scordino and Val Stewart in 2015 and expressed her admiration for their tenacity, noting that restoring fish habitat is the future of Edmonds. Councilmember Buckshnis said she would like to have SSS make a presentation to WRIA 8 or Puget Sound Partnership Salmon Recovery Council. She recalled the Tree Board and Youth Council members participated in the Holy Rosary planting. She suggested compiling the SSS information on the City's sever. She asked if SSS had received grant funding for next year. Mr. Scordino answered no, the second year of funding from the Council ($15,000) will provide enough information to see trends over the two years and profile the problems. Exhaust fumes from the ferry holding lanes on SR104 that wash into the Marsh is the primary problem. Councilmember Buckshnis said Councilmember Teitzel and she plan to research how to remove the fences once they determine whose property they are on. She agreed the Council should consider mitigations for the waterfall. Councilmember Tibbott thanked SSS for their report, noting the photograph of the fence covered with vegetation graphically illustrated the blockage. 6. AUDIENCE COMMENTS Jenny Antilla, Edmonds, recalled in 2015 she put information on My Edmonds News about seeing a fish in the stream on 7t' Ave S; Mr. Scordino then contacted her and requested permission to access her property. She did not think he needed permission as the stream is free flowing, but she gave permission and the students have been coming ever since. She recommend continuing to allocate funds and to establish a timeframe for removing the blockage. With regard to Civic Park, she observed the cost of the park was $9M-$12M, but could be more due to drainage issues. She suggested addressing the water issues first and creating parking on the north end which would allow more use of the park. She referred to cost overruns on the Five Corners roundabout and the wayside train horn project. With regard to the Urban Forest Management Plan, she said the City needs to focus on vegetation overgrowing the sidewalks and send letters to the homeowners. She recalled a meeting several years ago regarding trees where people expressed their opposition to being told what to do with their trees. Matt McCulloch, President, Edmonds Downtown Alliance Advisory Board (Ed!) described their four main projects, 1) afterhours parking — includes a total of 100 spaces after the recent addition of parking at Bank of America, 2) new umbrella design, 3) digital marketing; last year over 1M views and 700,000 by the end of June this year, and 4) small grants program which partially funded the Where's Waldo program downtown. Ed! will present their work plan and budget to the Council in the fall. 7. REPORTS ON COUNCIL COMMITTEES 1. MONTHLY COUNCIL SUBCOMMITTEE REPORTS AND MINUTES Parks & Public Works Committee Councilmember Johnson highlighted items the committee reviewed: • WDFW Contract for the Fishing Pier — Consent Agenda • Interlocal Agreement with Edmonds School District for Meadowdale Preschool — Consent Agenda Edmonds City Council Draft Minutes July 16, 2019 Page 6 Packet Pg. 13 6.2.a • Rejected bids for Frances Anderson Center roofing — Consent Agenda • Waterfront Redevelopment contracts — future presentation to Council • Report on Bids for Dayton Street Stormwater project — future presentation to Council • Professional services agreement with Framework for the Downtown Parking Study — committee requested more public engagement before consultant data gathering and a future presentation to Council • McKinstry Facility Condition Assessment — on tonight's agenda • Willow Creek Daylighting and Marsh Restoration Design - future presentation to Council • 180 Gate - future presentation to Council Finance Committee Councilmember Mesaros highlighted items the committee reviewed: • Proposal for Personal Services Contract for Program Administrator at the Wastewater Treatment Plant — Consent Agenda • New Probation Officer in Municipal Court —Consent Agenda • Approved new contract for Jerrie Bevington — Consent Agenda • May 2019 Monthly financial report — Consent Agenda • 2' Quarter budget amendments — on tonight's agenda • McKinstry Report regarding deferred maintenance on City buildings — on tonight's agenda Public Safety, Planning & Personnel Committee Councilmember Nelson highlighted items the committee reviewed: • Amend Edmonds Community Development Code Chapter 20.70 Street Vacations — Planning Board provide recommendation to Council • Probation Officer for Municipal Court — Consent Agenda • Update on Climate Protection Goals — presentation to Council on August 6 8. ACTION ITEMS 1. CIVIC PARK FINANCING ORDINANCE Finance Director Scott James explained this agenda item will ask Council to approve an ordinance authorizing the issuance of bonds to finance the Civic Park construction gap. Two weeks ago on July 2, Council voted to issue $3.7M in bonds to fund the Civic Park construction gap. Also, during that meeting, Council authorized Mayor to sign letters of engagement with Foster Pepper to serve as bond counsel and with Northwest Municipal Advisors to serve as financial advisor on this bond issuance. Mr. James introduced Bond Counsel Nancy Neraas and Financial Advisor Scott Bauer. Mr. Scott reviewed some key City and Council accomplishments related to Civic Park. Developing Civic Field into a signature park for the City has been a dream the City has had for decades. This dream of constructing Civic Park started to become a reality in 2016 when the City negotiated the purchased of Civic Field from the Edmonds School District. Soon thereafter, the City formed the Civic Park advisory committee and hired the Landscape Architecture firm of Walker Macy. Walker Macy, the advisory committee and staff worked together to seek input from stakeholders which lead to the development of the Civic Park Master Plan. With the Council approved master plan, Parks Director Carrie Hite was able to approach agencies to ask for grants and to was able to secure just over $8.8M in grants and city funding, including a $1.5M grant from the Hazel Miller Foundation. Tonight with Council approval of the $3.7M bond ordinance, the City will have funds to pay the estimated construction costs of Civic Park. Mr. Bauer reviewed: • Bond market Edmonds City Council Draft Minutes July 16, 2019 Page 7 Packet Pg. 14 o Interest rates have been falling since the beginning of 2019 and have approached historical lows seen in 2016 (immediately after Brexit) o Graph of Bonds Buyer 20-Bond GO Index 1990 to present ■ Shows long-term interest rates for an index of well rated (AA) general obligation bonds • The City's Outstanding General Obligation Bonds LTGO Bonds (Moody's: Aa3 Par Outstanding Callable Par Final Mat. Coupon Range Call Date LTGO Ref 2012 $5,210,000 $2,635,000 12/1/2031 1.75%-2.25% 12/1/2022 LTGO Ref 2016 $2,579,489 $1,008,918 12/1/2026 1.67% 12/1/2023 Total LTGO Bonds Debt $7,789,489 $3,643,918 • Financing Plan o Provide approximately $3.7 million of bond proceeds for Civic Park project o Financing Structure: Level debt service, amortized over 20 years o Estimated average annual debt service: $244,000 Ms. Neraas reviewed: Delegation Authority o Under Washington State law, the City Council can delegate final approval of bond sale to designated individuals ■ This has been utilized on the City's prior transactions o This delegated authority allows the bond sale to occur on days other than a City Council date o Certain parameters are set in advance in the Ordinance ■ Maximum issue size ■ Maximum interest rate ■ Final maturity o Provides more flexibility in timing bond issue Mr. Bauer reviewed the schedule of events: • July 16 Adoption of Bond Ordinance • August — Early Sept. Drafting of Preliminary Official Statement (POS) • Mid — Late Sept. Rating Agency Call • Early October Receive Bond Rating Release POS to Potential Investors • Mid October Competitive Bond Sale • Late October Bond Closing Councilmember Johnson asked about the annual debt service. Mr. Bauer said it would be $244,000. Councilmember Johnson relayed her calculation that that totaled $4.88M over 20 years, actually paying more in debt service than the bond. Mr. Bauer explained the City pays interest on the funds borrowed. Councilmember Johnson recalled Mr. James stated Ms. Hite obtained $8.8M in grants. Mr. James clarified he said Ms. Hite was able to secure $8.8M in funding, $3.3M of that is grants including $1.5M from the Hazel Miller Foundation as well as funds from Snohomish County and the State. The request for bonds is $3.7M and there is a $2M allocation from the General Fund which is included in the $8.8M. Councilmember Johnson summarized that is a total of $14.5M for Civic Park. Mr. James clarified the amount is $8.8M + $3.7M (bond) _ $12.5M. The $2M allocation from the General Fund is included in the $8.8M. Councilmember Johnson said she was on Civic Park advisory committee. At that time there was not a real understanding of the total cost but it was estimated to be $8M-$12M. She was concerned about adding $4.5M in debt service to the $12.5M for a total of $17M for the park. Edmonds City Council Draft Minutes July 16, 2019 Page 8 Packet Pg. 15 6.2.a Mr. James displayed the Civic Park Budget (as of July 2019): REVENUE 2019 2020 Total Fund 125 $70,000 $500,000 $570,000 Fund 126 $750,000 $500,000 $1,250,000 City GF $2,000,000 $500,000 $2,500,000 Park Impact Fees $500,000 $500,000 $1,000,000 RCO/Local Parks/YAF $850,000 $850,000 LWCF/State $500,000 $500,000 Snohomish County $450,000 $450,000 Hazel Miller Foundation $1,500,000 $1,500,000 ADA Playground Upgrades $110,000 $110,000 Verdant/Fitness Zone $100,000 $100,000 TOTAL $3,430,000 $5,400,000 $8,830,000 EXPENSES 2019 2020 Total A&E $750,000 $205,000 $955,000 Other 0 $144,600 $144,600 Construction $6,800,000 $6,800,000 GC's, escalation, contingency $2,380,000 $2,380,000 Const. su ort/testing/misc/En ineerin $30,000 $1,020,000 $1,050,000 WSST $700,400 $700,400 Stormwater Mitigation Estimate $500,000 $500,000 TOTAL $780,000 $11,750,000 $12,530,000 Gap in Funding $3,700,000 *July 2, 2019 Council authorize issuance of $3.7M to fund construction gap Councilmember Johnson commented the $3.7M bond will cost $4.88M in 20 years. She asked if the cost of servicing the bond was added to the amount of the bond for the true cost of Civic Field. Mr. James said the question was whether to have today's citizens pay the entire park cost or does the City ask citizens who will be enjoying the park for the next 20 years to help fund it? The Council's direction on July 2nd was not to have citizens pay the entire cost today and to fund some of the cost via bonds to allocate costs over 20 years. Councilmember Johnson said she is a dissenting viewpoint. If the City was able get $6.8M through grants and funding, it could be funded via pay-as-you-go, possibly doing half the park now and the complete park later. Her intent was to point out the true costs associated with this project. She was not in favor of bond funding for Civic Park. Councilmember Buckshnis suggested doing a present value of the payment stream to illustrate $244,000 today is not the same as $244,000 in 20 years. She asked if the City would maintain its current rating. Mr. Bauer expected the City would maintain its Aa2 rating. She opined $244,000/year was well worth completing Civic Park. She acknowledged there may be water issues but was hopeful they would not be significant. Councilmember Mesaros recalled the Finance Committee discussed other opportunities for financing in the City such as deferred building maintenance. He asked if the City could bond for an additional $2M to address deferred maintenance and whether purposes could be mixed within a bond issue. He was not Edmonds City Council Draft Minutes July 16, 2019 Page 9 Packet Pg. 16 6.2.a advocating for that but wanted to ask the question. Mr. James answered $2M or more could be added to the bond issue but he was uncertain the Council had enough information or enough time to add $2M to this bond issue for deferred maintenance. He suggested developing a long term plan for funding deferred building maintenance. Councilmember Mesaros inquired about rumors of a federal funds rate cut at the end of month and if that occurred, how that would impact savings to the City. Mr. Bauer said that rate cut is already reflected in interest rates. The shortest term rates have already been adjusted downward. Mayor Earling said staff has been discussing a strategy for addressing the $6.5M in deferred maintenance. He was hopeful the Council would allow staff time for further analysis before making a decision regarding how to address that expense. Council President Fraley-Monillas said she was thinking along the lines of Councilmember Johnson with regard to the cost of this park. She agreed with Councilmember Johnson's calculation that the cost of Civic Park would be $17,410,000 including debt service. She loves parks and Edmonds parks are some of the best, recalling she used to visit Edmonds parks when living in Richmond Beach. However, she was struggling with borrowing $3.7M for a park and paying back $4.8M. She was not one to buy things above her means and it bothered her to pay so much in debt service. She would rather see the park development paid for upfront and if the City was going to bond, bond for the facility issues. The buildings are the City's assets and they are in disrepair. A park is not a priority compared to a fire station or other problems the City is facing. She did not support bonding for the gap in funding for Civic Park. Mr. Bauer said when the cost of a project is discussed, it is typically the principal and the borrowing amount and generally interest is not included, but he understood Council President Fraley-Monillas' point. Councilmember Teitzel expressed support for bonding for Civic Park. He pointed out in 20 years a dollar will be worth a fraction of what it is worth today so you cannot simply add numbers together to reach a total in today's dollars. Civic Park will be an asset for the City, future generation will enjoy it and future generations should pay a portion of the cost. If the City funded the park entirely from the General Fund, it would take funds away from other projects such as facility maintenance. He concluded this is a tool available to the City now and interest rates are at near historic low levels. COUNCILMEMBER TEITZEL MOVED, SECONDED BY COUNCILMEMBER BUCKSHNIS, TO APPROVE ORDINANCE NO. 4155, AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, RELATING TO CONTRACTING INDEBTEDNESS; PROVIDING FOR THE ISSUANCE, SALE AND DELIVERY OF NOT TO EXCEED $4,000,000 AGGREGATE PRINCIPAL AMOUNT OF LIMITED TAX GENERAL OBLIGATION BONDS TO PROVIDE FUNDS TO FINANCE IMPROVEMENTS TO CIVIC PARK AND TO PAY THE COSTS OF ISSUANCE AND SALE OF THE BONDS; FIXING OR SETTING PARAMETERS WITH RESPECT TO CERTAIN TERMS AND COVENANTS OF THE BONDS; APPOINTING THE CITY'S DESIGNATED REPRESENTATIVE TO APPROVE THE FINAL TERMS OF THE SALE OF THE BONDS; AND PROVIDING FOR OTHER RELATED MATTERS. UPON ROLL CALL, MOTION CARRIED (5- 2), COUNCILMEMBERS NELSON, BUCKSHNIS, MESAROS, TEITZEL AND TIBBOTT VOTING YES; AND COUNCILMEMBER JOHNSON AND COUNCIL PRESIDENT FRALEY- MONILLAS VOTING NO. 2. CITY OF EDMONDS FACILITY CONDITION ASSESSMENT STUDY BY MCKINSTRY Mr. Williams introduced Thom Sullivan, Facilities Manager, and Grant Haig, McKinstry. Mr. Williams reviewed: • Overview and history Edmonds City Council Draft Minutes July 16, 2019 Page 10 Packet Pg. 17 6.2.a o In 2018, the City of Edmonds commissioned a Facility Condition Assessment (FCA) with McKinstry. This effort supplemented research conducted in 2015 by Cardno, Inc. o Cardno Study was a high-level review of the existing conditions of facilities owned by the City of Edmonds. o In addition to the basic building analysis Cardno produced McKinstry added all the other assets in our buildings including HVAC, plumbing, electrical, and envelope issues like exterior finishes, windows, fire suppression, fences and parking lots. o In addition to assessing condition, remaining life and replacement costs and periodic maintenance costs were also estimated Facility Condition index (FCI) scores o The Facility Condition Index (FCI) is a management benchmark used to objectively assess current and projected condition of a building asset. This is often the output from a Computerized Maintenance Management System (CMMS). FCI is defined as the ratio of current year required renewal cost to current building replacement value: Excellent 0-5% Good 5-10% Fair 10-15% Poor 15-25% Critical 25+% 0 5-year capital expenditures Building FCI Score 5-year FCI Score Boys & Girls Club 6.8% 14.4% Cemetery Building 3.5% 14.4% City Hall 13.8% 19.0% Fishing Pier 11.7% 241% Frances Anderson Center 13.6% 18.0% FS 16 3.6% 11.7% FS 17 10.1% 25.9% FS 20 3.4% 17.5% Historic Log Cabin 10.8% 24.1% Historic Museum 3.6% 14.3% Library and Plaza Room 13.3% 30.0% Meadowdale Club House 5.4% 9.0% Old Public Works 6.0% 9.6% Parks Maint. Building 14.5% 22.6% Public Safety Building 5.5% 16.1% Public Works O&M Center 20% 26.3% Wade James Theater 7.2% 16.9% Yost Pool House 8.7% 19.1% • Deferred maintenance needs o $6.5M current deferred maintenance Category Amount HVAC & Plumbing $3,315,000* Electrical $1,200,000* Interiors (e.g. flooring, ceiling tiles or furniture) $750,000 Roofing $500,000** Exteriors (e.g. parkinglots, fencing or exterior finishes $330,000 Fire, life safety & security $315,000 Other (e.g. specialty equipment or solar inverters) $165,000 Total $6,575,000 Edmonds City Council Draft Minutes July 16, 2019 Page 11 Packet Pg. 18 6.2.a *Not in Cardno Report ** includes Frances Anderson Center roof which largely funded by State grant o $800,000 annual baseline budget needed to maintain facilities independent of deferred maintenance on existing facilities o Current funding level at $400,000-700,000 per year is not sufficient for sustainable facilities management o $9.6M of cumulative 5-year deferred maintenance ($6.5M + —$800,000/year for 4 years) Top Projects 1. HVAC upgrades at Frances Anderson, City Hall, FS 16, Public Works O&M and the Public Safety Building. 2. Electrical investigation and upgrades at any buildings built around or before 1980 (e.g. City Hall, Old Public Works and the Library) 3. Fire alarm system replacements at City Hall, Public Safety, Public Works O&M and the Wade James Theater. 4. Aesthetic upgrades such as flooring, ceiling tiles, exterior finishes, and parking lot repairs across nearly all facilities. Mr. Williams provided a screenshot of the Tableau software into which all the building data has been entered and allows the data to be sorted in a variety of ways. Mr. Haig described how information can be sorted, using the components of a car as an example, explaining the data could be sort by building, by component, by system, etc. for use as a planning tool. The database includes all the assets with condition, replacement timing, replacement cost, asset class, etc. based on industry data that has been compiled since 1960. Mr. Williams said the data can also be weighted based on several factors such as replacement cost, amount of remaining life in asset, life expectancy, condition, and criteria such as occupant impact. He continued his presentation: • Cost of delay o At current funding levels, the cumulative cost of delay on deferred maintenance over the next five years will be: >$2,000,000 plus annual inflation costs on current deferred maintenance backlog: $260,000 @ 4% annually • Key findings o Deferred maintenance backlog is $6.5M o $800,000 annual investment is needed independent of deferred maintenance backlog. o Assuming $100-$200k in additional grants, the City of Edmonds should plan to allocate $650k- $700k to address planned capital renewal. o Backlog caused by historical underfunding, understaffing and gaps in the capital planning process. (i.e. $56,600/yr. for 20 straight years) Councilmember Buckshnis referred to the data modeling and Mr. Haig's use of a car as an example. She asked about a 40 year old car that was still in prime condition, asking if variables could be added. Mr. Haig said for example a boiler would have a life of 30 years if maintained by the original equipment manufacturer. To the degree the maintenance was not done, would be a percentage of the decrease in the life. Councilmember Buckshnis asked if McKinstry looked at every piece of equipment in the City. Mr. Haig said yes and Mr. Sullivan and Mr. Williams were an integral part of that effort. Councilmember Buckshnis concluded this is great information as long as the human aspect is added. Mr. Williams commented because deferred maintenance exists, facilities maintenance staff have had to do a lot of work recently. Mr. Sullivan commented on the heroic work the 3 maintenance technicians, 1 city electrician and 7 custodians do every day to maintain the City's buildings in operational condition 7 days/week 365 days/year. The average age of the City's buildings is 49 years. In the 3 years he has been with the City, there have not been any significant building system outages that have prevented continuity Edmonds City Council Draft Minutes July 16, 2019 Page 12 Packet Pg. 19 6.2.a of business other than a PUD electrical failure last winter. The polishing of the City's old assets that staff does is commendable. Councilmember Tibbott found the report very detailed. He asked how increasing the annual amount contributed to deferred maintenance from $800,000 to $1.2M or $1.5M would help over 20 years to make up the $6M deficit as well as an additional $2M. Mr. Williams said anything above the $700,000- 800,000/year would go toward the backlog although the cost of the backlog grows each year. If the $6.4M were divided over multiple years in addition to the underlying maintenance cost, that would address the backlog. . Councilmember Tibbott asked if there were any imminent system failures that could not be handled on an incremental maintenance basis or could be addressed via an annual increase. Mr. Williams said there is a not a panic about a specific building or system, but the cost of maintenance is increasing for a lot of systems. Mr. Sullivan said the Tableau allows you to look at each deficiency, but it is a tool and does not always tell the whole story. For example, replacing the steam boiler at the Frances Anderson Center may be a $200,000 project but to replace the entire steam system might be a $2M project because there are 1920s steam lines and radiators in the building that are not included in the boiler replacement. Councilmember Tibbott summarized perhaps in some earlier years more than $1.2M would be required to address a whole system replacement. Mr. Sullivan agreed, pointing out for example a car may look amazing but the engine could blow at any time. Losing the steam boiler system at FAC could be catastrophic for usage during the winter. Councilmember Tibbott relayed his understanding that one of the fire stations is in fair condition now but will be in near critical condition in five years. He noted the downtown fire station may need a total replacement to bring it up to current standards. He asked whether some buildings needed to be completely replaced in which case bonding would make sense. Mr. Sullivan said a master planning effort with key stakeholders for the building inventory with the projected usage over 20 years would be important to determine whether to run a building to failure and replace it or to reinvest in the building. Mr. Williams said borrowing could be part of the strategy, but the City has a lot of priorities. The difficulty is facilities have not been maintained for a long time and it may be time to dedicate funding whether out of current revenues or borrowing if necessary. He summarized more and more deferred maintenance is being added as years progress so it needs to be addressed. Councilmember Teitzel commented it is not fun to talk about deferred maintenance; it's more fun to talk about something new. He compared deferred maintenance to a homeowner who delays repairing their roof and ends up paying more to address the subsequent damage the deferred maintenance caused. Citizens own the City's buildings and it will cost them more unless the City starts investing in maintenance which he supports. He was concerned about approving the Facility Condition Assessment before he has seen the study. Mr. Williams said McKinstry's report will be provided to Councilmembers tomorrow. Councilmember Teitzel recommended Council approve the study after having an opportunity to review the it, such as on the Consent Agenda. Council President Fraley-Monillas asked the age of City Hall. Mr. Sullivan said it was built in 1976. Council President Fraley-Monillas commented City Hall was built when there were dial phones and before computers and electronics. It is surprising the City is able to function with that building's archaic electrical systems. The plumbing in some building is over 40 years old. Although she believed buildings were built better back then, technology has changed since they were built. She referred to wooden WWII barracks she worked in that were great in an earthquake but the State had to replace all the interiors.. She agreed it was time to look at the City's buildings and systems. Mayor Earling commented staff is very creative, recalling when a part was needed for the elevator, staff located it on the used market in Argentina. Edmonds City Council Draft Minutes July 16, 2019 Page 13 Packet Pg. 20 6.2.a Mayor Earling declared a brief recess. 3. DRAFT URBAN FOREST MANAGEMENT PLAN Development Services Director Shane Hope said the presentation was basically the same as June 25t' with a few additions. She highlighted • History • Public process • Comments on prior drafts • Work done between November 2018 Draft and May 2018 Draft o Informal committee formed in early 2019 to work on improvements • Changes that were made • Recent consideration o Introduction of revised UFMP to Tree Board (June 6) o Discussion of revised UFMP by Tree Board (June 27 o City Council meetings ■ June 25 ■ July 16 • Contents of Current Draft Plan • Overarching goals 1. Maintain or enhance citywide canopy coverage A. Update tree regulations to reduce clearcutting or other development impacts on urban forest & to consider changes to tree replacement requirements & penalties for code violations (ongoing) B. Adopt policy of no net loss to overall (1 year) C. Ensure protection of tree resources in environmentally critical areas (1 year) D. Develop voluntary heritage tree program (3-5 years) E. Enforce City regulations on tree -cutting (ongoing) F. Establish tree bank or fund to which donations can be made (1 year) G. Support sustainable ways to combat pests & diseases (3-5 years) H. Consider need for dedicated City arborist (ongoing) I. Report every 10 years on canopy coverage (10 years, ongoing) J. Periodically update UFMP (generally, every 5-10 years) 2. Manage public trees proactively A. Use best available science in caring urban forest on City properties & ROW (ongoing) B. Have adequate resources (staff, contractual help, training, etc.) to monitor health of public trees & make decisions on their care (ongoing) C. Develop & maintain inventory of trees in key public places to document tree condition & risks (ongoing) D. Update Street Tree Plan periodically (ongoing) E. Support removal of invasive plants that threaten trees (ongoing) F. Coordinate among departments on tree issues & identify lead City staff person (ongoing) G. Develop & implement tree planting plan on City property & ROW to ensure diversity & suitability (ongoing) H. Implement program of regular maintenance for City trees (ongoing) 1. Lead or facilitate volunteer activities for tree planting/care on City property & ROW (1 year, ongoing) J. As part of City -sponsored capital projects, provide funding for appropriate trees in ROW & on City properties (ongoing) K. Provide annual report City Council on tree management for City properties & ROW (ongoing) Edmonds City Council Draft Minutes July 16, 2019 Page 14 Packet Pg. 21 6.2.a 3. Incentivize protecting and planting trees on private property A. Have program of giving away trees &/or tree vouchers for use in Edmonds (3-5 years, ongoing) B. For properties that retain certain amount of tree canopy cover, explore establishment of incentives (3-5 years, ongoing) C. Develop certification/awards program to public recognize property owners that maintain certain amount or type of healthy trees (1 year, ongoing) 4. Provide resources to community to educate/inform on tree planting and care A. Provide signage or other information about significant public trees (1 year) B. Provide for Tree Board, esp. to: develop community education materials; participate in or initiate tree planting & tree care activities; report annually on Tree Board activities (1 year, ongoing) C. Develop & disseminate info for public on value of trees & to provide guidance on tree selection & management (1 year, ongoing) 5. Promote "right tree, right place" A. Make readily available list of compatible trees in various kinds of settings (1 year) B. Identify key areas to increase canopy (1-3 years) i. For private properties, encourage appropriate tree planting or other technique ii. For public property, act appropriately plant trees or otherwise increase canopy C. Identify & plan for care of unsuitable trees &, as necessary, for pruning or removal when they are potential damaging to people, buildings, or infrastructure (ongoing) D. Ensure that development regulations require native trees & vegetation to be planted in critical areas, esp. near streams & other wildlife habitat areas (ongoing) E. hi updating Street Tree Plan, identify specific species of trees that should be planted to be compatible with street environment 1-2 years) • What will happen when UFMP is adopted? o Implementation can get underway, including actions identified for each goal, starting with most critical activities o Monitoring of UFMP goals & actions can begin o UFMP can be re-evaluated in 5-10 years & adjusted as needed • Additional Questions & Info o Tree Coverage ■ What are tree coverages in other cities? - Graph of tree canopies in nearby communities from early 2017 assessment - Edmonds is in the middle ■ Is there one "right" coverage amount? No, varies ■ What would it mean to increase tree canopy in Edmonds by 1 %? 64 more acres of tree cover o Actions to implement UFMP ■ Can timeline of proposed actions be revised? Yes, consistent with resources and priorities ■ What are priority actions after UFMP adoption? - Street tree plan - Tree regulations update - Awards program ■ Will some actions need change to staff workload or funding? Probably, over time • Thanks to many people o City Council o Planning Board o City Staff o Planning Board o Tree Board • Recommendation Edmonds City Council Draft Minutes July 16, 2019 Page 15 Packet Pg. 22 6.2.a o Adopt a final UFMP, either tonight or on Consent Agenda Councilmember Buckshnis referred to her memo in the packet following her meeting with Mr. Lien, the Tree Board and scientist Ross Dimmick and their nine recommendations: • Hire a full-time Arborist. The $20,000 in the current budget is not sufficient if the City is serious about managing the tree canopy. • Obtain a current GIS and have a GIS done every five years. The last GIS was performed in 2015 and tree canopy was about 30% • Consider districting or quadrants for tree canopy as incentives and codes should address the issue of views and non -view properties. Tree Board has offered to help with this strategy. • Start immediately on code crafting especially for developments as well as private homes. • Start working on a "voucher program" for developers so that they will have to help pay for all the trees removed and establish a ratio plan. • Immediately begin working on incentives for people to retain trees that follow the "Right Tree Right Place" motto • Create a local tree bank location • Be proactive and start planting Street Trees • Tree Board is committed to community education Councilmember Johnson said she is very concerned about clearcutting of development sites where native trees and the understory is removed. Other cities require trees above a certain caliber to be located and identified by species on the property survey prior to development. She asked how that could be incorporated into the UFMP or if should it be a separate ordinance. Ms. Hope answered that would be a code change. The UFMP includes a goal to update the development regulations to deal with the tree ratio on private property as development occurs. Councilmember Johnson asked the timeline for the code update. Ms. Hope said it was intended to be this year; the challenge has been to complete the UFMP before beginning the code update. Councilmember Johnson commented there are so few developable sites left that the ones being developed are the ones on the margins where there are tall trees and people are alarmed when a grove of mature trees is bulldozed. Environmental Program Manager Kernen Lien said the subdivision code requires trees over 8" in diameter be identified on survey. With regard to properties being clear-cut during development, it is more than the tree code that results in tree removal; there are regulations related to roadway width, utilities, setbacks, etc. and all those impact the retention of trees to the maximum extent practicable. Councilmember Johnson commented buildable lots are getting smaller and smaller and the unintended consequence is the loss of vegetation. Ms. Hope agreed it was balancing act, providing opportunity for property owners to use their property and still retaining trees or requiring replanting or a contribution to a tree bank. Council President Fraley-Monillas was pleased that issue could be addressed via a code change. She expressed her appreciation for staff s work on the UFMP. COUNCIL PRESIDENT FRALEY-MONILLAS MOVED, SECONDED BY COUNCILMEMBER BUCKSHNIS, TO ADOPT THE URBAN FOREST MANAGEMENT PLAN. Councilmember Nelson commended Ms. Hope and Mr. Lien and their staff for their work. He recognized the UFMP is a compromise document. Although he would like to see more done, he understood it was a reflection of the entire City. He looked forward to using the UFMP as a starting point. Edmonds City Council Draft Minutes July 16, 2019 Page 16 Packet Pg. 23 6.2.a Councilmember Tibbott commended staff for the compromises reflected in the document and including elements that were not in the original document. He asked whether this plan addressed low impact development. Ms. Hope said that is viewed as part of the UFMP. Councilmember Teitzel thanked staff for the additions to the UFMP, commenting it was much improved. He recalled attended a Planning Board meeting before he took office in 2015 were the Tree Code was discussed; the mood in the room that evening made the Waterfront Connector meeting look like a Sunday afternoon picnic, there were some very high emotions. Based on the feedback received that night, in early 2016 the Council directed staff to develop the UFMP as a first step. Although there are concerns about trees on private property, the UFMP is a first step toward protecting trees. MOTION CARRIED UNANIMOUSLY. 4. SECOND QUARTER 2019 BUDGET AMENDMENT Finance Director Scott James • 16 Decision Packages totaling $4,936,173 in new expenditures o Of these 16 Decision Packages, 2 account for $4,767,350 • $4,782,321 in new revenues • Overall Fund Balance reduced by $153,852 • Proposed amendments o Records Storage/Transfer Project o Public Records Request Software enhancement o Citizens' Housing Commission expenses o Ebb Tide expert witnesses o Transfer money out of Risk Fund to General Fund (per the newly adopted Fund Balance Policy) o Transfer money out of Contingency Fund to General Fund (per newly adopted Fund Balance Policy) o Historic calendar printing (2018 invoice paid in 2019) o Final research to complete Kone Consulting Homeless Report (2018 invoice paid in 2019) o Joint tourism promotion ad purchased in the WA State Visitor's Guide o Paine Field Terminal advertisement o Yost Pool shower boiler ■ To offset expense, remove Mathay Ballinger Trail Improvement Project this year o Yost Pool clock (funded via community initiative) o Seaview Park benches and picnic table 0 1 % for Art (174th & 71 st Storm Improvement project) o Additional budget for new Gateway sign at 5th Ave S & SR-104 o LEOFF 1 Fire Fund reimbursement Summary of the 2nd Quarter Budget Amendment o Revenues increased by $4,782,321 o Expenditures increased by $4,936,173 o Ending Fund Balance decreased by $153,852 Council President Fraley-Monillas pointed out the replacement of the Yost Pool boiler was funded by removing Mathay Ballinger Trail Improvement Project this year. She pointed out Mathay Ballinger is the only park on the east side of Edmonds. With regard to the amendment to fund Citizens' Housing Commission expenses, she pointed out this is a citywide commission and questioned why it was being paid from the Council Contingency Fund and not at least partially funded from another citywide fund. Mr. James recalled when the Council first discussed the Housing Commission, there was a suggestion to use the $93,000 in Council Contingency to pay for it. Bottom line, the General Fund will pay for this expense; if it Edmonds City Council Draft Minutes July 16, 2019 Page 17 Packet Pg. 24 6.2.a is preferable to have it paid from non -departmental and the Council Contingency reserved for another expense, that could be done. Council President Fraley-Monillas expressed concern that a citywide project would be paid from Council Contingency. Mr. James explained the expense for the Housing Commission is not coming from the Council budget, the decision package is in the Development Services budget and funds are moved from the Council Contingency to help fund it. Council President Fraley-Monillas suggested in the future there be consensus before the Council Contingency is used to fund an expense. Councilmember Buckshnis explained the $93,000 was surplus in the 2018 budget and carried forward to the Council Contingency in 2019. She recalled the Council agreed to use the $93,000 to fund the Housing Commission. Mr. James explained this request would move $7600 to the Development Services communications budget and $87,000 to Development Services professional services budget. During the 2019 budget development, there was a request by Councilmember Buckshnis to save the remaining $93,000 in the 2018 budget for future allocation by Council; this amendment is that allocation. The Council still has $25,000 in the Council Contingency. Councilmember Buckshnis expressed support for eliminating the Risk Management fund and for transferring funds from the Contingency Reserve Fund to the General Fund to be in compliance with the RCW. Councilmember Mesaros said the Finance Committee discussed funding the Housing Commission expenses from ending fund balance instead of a transfer from Council Contingency. The explanation for the amendment states is it is 100% from ending fund balance. Mr. James said that should be corrected to self -funded. Councilmember Mesaros suggested funding the expenditure from ending fund balance. Council President Fraley-Monillas said her concern is with communication; one Councilmember making a suggestion and it becomes an action. Mr. James said because the Council did not object to the suggestion, staff assumed that was Council direction. He said in the past the Council President approved Council Contingency expenditures. Councilmember Tibbott recalled this conversation; there was $93,000 in Council Contingency at the end of 2018 and because the cost of the Housing Commission was unknown, the Council asked to retain that amount in the Council Contingency in 2019. He found it reasonable to make that transfer to Development Services for that project. If any funds remain in the Council Contingency at the end of the year, the Council may want to retain them for expenses in 2020. COUNCILMEMBER MESAROS MOVED, SECONDED BY COUNCIL PRESIDENT FRALEY- MONILLAS, TO APPROVE ORDINANCE NO. 4156, THE SECOND QUARTER BUDGET AMENDMENT. MOTION CARRIED UNANIMOUSLY. 9. MAYOR'S COMMENTS Mayor Earling reported on last Tuesday's groundbreaking of the new community center. He also reported on the ribbon cutting at the Village at Westgate on Friday. He encouraged Councilmembers to visit and see the quality building and the great addition it is to community. Mayor Earling announced a ceremony between the police station and fire station on Saturday at 9 a.m. commemorating the 50t1i anniversary of the landing on the moon. 10. COUNCIL COMMENTS Edmonds City Council Draft Minutes July 16, 2019 Page 18 Packet Pg. 25 6.2.a Councilmember Johnson reported Councilmember Tibbott and she also attended the Village at Westgate ribbon cutting. This is the City's first MFTE building and she was surprised to learn that although there are discounts for people who qualify, the apartments themselves are exactly the same and all are $50/square foot. Councilmember Johnson offered a correction after talking with Mr. James during the break. She recalled the financial adviser Scott Bauer said there was $244,000/year in debt service for Civic Park; Mr. James clarified that the principal was included in the debt service. Therefore the total $4.88M was to repay the $3.7M bond, bringing the total cost of Civic Park to $13.68M. Councilmember Buckshnis said she will be absent from next week's meeting as friends from Lithuania and her family are in town and it is her birthday. Council President Fraley-Monillas provided an update regarding the South Snohomish County task force on homelessness being organized by County Councilmember Wright. The task force will include south Snohomish County electeds and agencies such as Verdant and others to start talking about what to do about homelessness and how to interface with each other. The first meeting will be held in September; she will inform Council when a date is determined. Council President Fraley-Monillas reported next week's Council meeting will include a mini -budget retreat. The retreat facilitator Mike Bailey recommended the Council meet with the Mayor to talk about the Council's overarching budget issues. For example, the Council will identify a priority, the Mayor will request staff research the cost and return to Council. That process is intended to keep the Council out of the minutia of budgeting and at a higher level which may be a better way of budgeting. Councilmember Mesaros reported he will be doing his second sprint triathlon next Sunday in Lake Chelan. Councilmember Teitzel reported he announced the season's first Concert in the Park, Rangers and the "Re - Arrangers" Gypsy Jazz Band. The concert was well attended and everyone had a great time. 11. CONVENE IN EXECUTIVE SESSION REGARDING PENDING OR POTENTIAL LITIGATION PER RCW 42.30.110(1)(i) This item was not needed. 12. RECONVENE IN OPEN SESSION. POTENTIAL ACTION AS A RESULT OF MEETING IN EXECUTIVE SESSION This item was not needed. 13. ADJOURN With no further business, the Council meeting was adjourned at 9:53 p.m. Edmonds City Council Draft Minutes July 16, 2019 Page 19 Packet Pg. 26 6.3 City Council Agenda Item Meeting Date: 07/23/2019 Approval of claim, payroll and benefit checks, direct deposit and wire payments. Staff Lead: Scott James Department: Administrative Services Preparer: Nori Jacobson Background/History Approval of claim checks #237745 through #237837 dated July 18, 2019 for $585,255.68 (re -issued check #237745 $86.00) and wire payments of $602.35. Approval of payroll checks #63814 through #63863 for retroactive pay for the employees of the Edmonds Employee Association in the amount of $119,798.54. Approval of payroll direct deposit and checks #63864 through #63870 for $578,299.65, benefit checks #63871 through #63875 and wire payments of $620,236.52 for the pay period July 1, 2019 through July 15, 2019. Staff Recommendation Approval of claim, payroll and benefit checks, direct deposit and wire payments. Narrative In accordance with the State statutes, City payments must be approved by the City Council. Ordinance #2896 delegates this approval to the Council President who reviews and recommends either approval or non -approval of expenditures. Attachments: claims 07-18-19 wire 07-12-19 FrequentlyUsedProjNumbers 07-18-19 EEA retro payroll summary 07-15-19 payroll benefit 07-15-19 Packet Pg. 27 vchlist 07/18/2019 8:48:36AM Voucher List City of Edmonds Bank code : Voucher usbank Date Vendor Invoice PO # Description/Account 237745 7/16/2019 075773 RUTHERFORD, BONNIE 9/16 REFUND 9/16 REFUND ACTIVITY CANCELLA 9/16 REFUND ACTIVITY CANCELLA 001.000.239.200 Total 237746 7/18/2019 070322 A&A LANGUAGE SERVICES INC 15-70933 INTERPRETER - SPANISH- INTERPRETER - SPANISH- 001.000.23.512.50.41.01 15-70942 INTERPRETER - KOREAN- INTERPRETER - KOREAN- 001.000.23.512.50.41.01 Tota I : 237747 7/18/2019 065052 AARD PEST CONTROL 22875 WWTP: 7/5/19 PEST CONTROL SEF Pest Control Service 423.000.76.535.80.41.00 10.4% Sales Tax 423.000.76.535.80.41.00 Total 237748 7/18/2019 061029 ABSOLUTE GRAPHIX 619431 ESCC T-SHIRTS ESCC t-shirts 138.100.21.557.21.31.00 10.4% Sales Tax 138.100.21.557.21.31.00 Total 237749 7/18/2019 000850 ALDERWOOD WATER DISTRICT 10472 MONTHLY WHOLESALE WATER Cl- MONTHLY WHOLESALE WATER CF 421.000.74.534.80.33.00 Tota I : 237750 7/18/2019 065568 ALLWATER INC 071519032 FINANCE DEPT WATER Finance dept water 001.000.31.514.23.31.00 6.3.a Page: 1 a� L 3 c .y Amoun a m U m 86.0( 86.0( ui m 182.4f m c a� 187.1, -a 369.6( M 0 �a a 73.0( 7.5, U 80.55 0 Ta 0 a 456.3E Q 47.4 503.8, ti 0 E 203,177.8( 203,177.8( c aD E t 85.3E Q Page: 1 Packet Pg. 28 vchlist 07/18/2019 8:48:36AM Voucher List City of Edmonds 6.3.a Page: 2 Bank code : Voucher usbank Date Vendor Invoice PO # Description/Account a� L 3 c �a Amoun y 237750 7/18/2019 065568 ALLWATER INC (Continued) 0 10.4% Sales Tax 001.000.31.514.23.31.00 8.8f u 071519033 WWTP: 7/15/19 DRINK WATER SER L DRINK WATER SERVICE 423.000.76.535.80.31.00 26.8E 10.4% Sales Tax 423.000.76.535.80.31.00 2.7� v Total : 123.81, m c 237751 7/18/2019 001529 ANDERSON, DONALD F ANDERSON EX CLAIM ANDERSON EXPENSE CLAIM 07/19 PER DIEM FOR MEALS 7/7-7/9/19 001.000.41.521.40.43.00 63.7E TIPS & INCIDENTALS 7/7-7/9/19 0 001.000.41.521.40.43.00 12.5( j, Total: 76.2E a 237752 7/18/2019 069751 ARAMARK UNIFORM SERVICES 1991313416 FACILITIES DIVISION UNIFORMS FACILITIES DIVISION UNIFORMS U 001.000.66.518.30.24.00 31.4 c 10.4% Sales Tax Ta 001.000.66.518.30.24.00 3.2, p 1991323252 WWTP: UNIFORMS,TOWELS+MATc a Mats/Towels Q 423.000.76.535.80.41.00 47.8E v Uniforms r' 423.000.76.535.80.24.00 3.5( 00 10.4% Sales Tax rz. 423.000.76.535.80.41.00 4.9£ N 10.4% Sales Tax E 423.000.76.535.80.24.00 0.3E f° 1991323253 PARKS MAINT UNIFORM SERVICE U PARKS MAINT UNIFORM SERVICE 001.000.64.576.80.24.00 50.2, E 10.4% Sales Tax U 001.000.64.576.80.24.00 5.2< Q Page: 2 Packet Pg. 29 vchlist 07/18/2019 8:48:36AM Bank code : usbank Voucher Date Vendor 237752 7/18/2019 069751 ARAMARK UNIFORM SERVICES Voucher List City of Edmonds Invoice PO # Description/Account (Continued) 1991328909 PUBLIC WORKS OMC LOBBY MATE PUBLIC WORKS OMC LOBBY MATE 001.000.65.518.20.41.00 PUBLIC WORKS OMC LOBBY MATE 111.000.68.542.90.41.00 PUBLIC WORKS OMC LOBBY MATE 421.000.74.534.80.41.00 PUBLIC WORKS OMC LOBBY MATE 422.000.72.531.90.41.00 PUBLIC WORKS OMC LOBBY MATE 423.000.75.535.80.41.00 PUBLIC WORKS OMC LOBBY MATE 511.000.77.548.68.41.00 10.4% Sales Tax 001.000.65.518.20.41.00 10.4% Sales Tax 111.000.68.542.90.41.00 10.4% Sales Tax 421.000.74.534.80.41.00 10.4% Sales Tax 422.000.72.531.90.41.00 10.4% Sales Tax 423.000.75.535.80.41.00 10.4% Sales Tax 511.000.77.548.68.41.00 1991328910 FLEET DIVISION UNIFORMS & MAT FLEET DIVISION UNIFORMS 511.000.77.548.68.24.00 FLEET DIVISION MATS 511.000.77.548.68.41.00 10.4% Sales Tax 511.000.77.548.68.24.00 10.4% Sales Tax 511.000.77.548.68.41.00 6.3.a Page: 3 aD L 3 c �a Amoun N 0 a m U m 1.6" 6.1- m t 6.1- u 6.1- c 6.1- �a 6.0£ o L �a 0.1; a E 0.6, 0.6, 0 0.6, o a a 0.6z Q rn 0.6- ti 0 9.2� E M 19.1( c 0.9m, E t 1.9£ Q Page: 3 Packet Pg. 30 vchlist 07/18/2019 8:48:36AM Voucher List City of Edmonds 6.3.a Page: 4 Bank code : Voucher usbank Date Vendor Invoice PO # Description/Account a� L 3 c �a Amoun N 0 237752 7/18/2019 069751 069751 ARAMARK UNIFORM SERVICES (Continued) Total : 213.70 237753 7/18/2019 071124 ASSOCIATED PETROLEUM 1457892-IN WWTP: DIESEL FUEL ULSD #2 DYED - BULK fuel (include 423.000.76.535.80.32.00 2,237.7E 10.4% Sales Tax 423.000.76.535.80.32.00 232.7, Total : 2,470.41 237754 7/18/2019 064341 AT&T MOBILITY 287283883350 WIRELESS SERVICE FOR AlRCARE m Mobile Aircards a0i 512.000.31.518.88.42.00 46.7E Total: 46.7E 237755 7/18/2019 075217 BASLER, ANTHONY 38782 INTERPRETER - SPANISH- o INTERPRETER - SPANISH- �a 001.000.23.512.50.41.01 131.4E 38932 INTERPRETER - SPANISH- E INTERPRETER - SPANISH- fd 001.000.23.512.50.41.01 106.4E 40075 INTERPRETER - SPANISH- INTERPRETER - SPANISH- > 001.000.23.512.50.41.01 106.4E a 40147 INTERPRETER - SPANISH- a INTERPRETER - SPANISH- Q 001.000.23.512.50.41.01 181.4E rn 40453 INTERPRETER - SPANISH- ao INTERPRETER - SPANISH- 001.000.23.512.50.41.01 ti 106.4� c 41352 INTERPRETER - SPANISH- E INTERPRETER - SPANISH- 001.000.23.512.50.41.01 106.4� Total: 738.9' W 237756 7/18/2019 073041 BECK & ASSOCIATES PLLC 2019-EDM-05.06 CONSULTING -STRUCTURAL ENGR E t BLD20190529 Main St Commons (Pl- U �a Q Page: 4 Packet Pg. 31 vchlist 07/18/2019 8:48:36AM Bank code : usbank Voucher Date Vendor 237756 7/18/2019 073041 BECK & ASSOCIATES PLLC 237757 7/18/2019 069226 BHC CONSULTANTS LLC 237758 7/18/2019 074307 BLUE STAR GAS 237759 7/18/2019 076341 BRK THRU DIGITAL LLC 237760 7/18/2019 076240 CADMAN MATERIALS INC Voucher List City of Edmonds Invoice PO # Description/Account (Continued) 001.000.62.524.20.41.00 BLD20190530 Main St Commons (Pl- 001.000.62.524.20.41.00 Tota I : 0011138 PROF SVCS (4.20.19 - 6.21.19) Field Inspections & mileage 001.000.62.524.20.41.00 Total 1115367-IN FLEET FUEL 578.1 GALLONS FLEET FUEL 578.1 GALLONS 511.000.77.548.68.34.12 Total BID-3674 BID/ED! DIGITAL MARKETING JUNE BID/Ed! Digital advertising June 2019 140.000.61.558.70.41.40 Tota I : 5612898 ROADWAY - ASPHALT ROADWAY - ASPHALT 111.000.68.542.31.31.00 10.0% Sales Tax 111.000.68.542.31.31.00 5613633 ROADWAY - ASPHALT ROADWAY - ASPHALT 111.000.68.542.31.31.00 10.0% Sales Tax 111.000.68.542.31.31.00 5614001 ROADWAY - ASPHALT ROADWAY - ASPHALT 111.000.68.542.31.31.00 10.0% Sales Tax 111.000.68.542.31.31.00 6.3.a Page: 5 aD L 3 c �a Amoun N 0 a aD 2,690.0( 'D r U d 2,909.0( .L 5,599.0( y m t U 1,084.4z 1,084.4z c c �a 1,000.2- — 1,000.21 �a a E 1,350.0( 1,350.0( c Ta 0 L 238.7- a Q 23.8, c� ao 401.7- o 40.11 M c 250.2- E t 25.0, Q Page: 5 Packet Pg. 32 vchlist 07/18/2019 8:48:36AM Bank code : usbank Voucher List City of Edmonds Voucher Date Vendor Invoice PO # Description/Account 237760 7/18/2019 076240 CADMAN MATERIALS INC (Continued) 5614363 ROADWAY - ASPHALT Roadway - Asphalt 111.000.68.542.31.31.00 10.0% Sales Tax 111.000.68.542.31.31.00 5615867 ROADWAY - ASPHALT ROADWAY - ASPHALT 111.000.68.542.31.31.00 10.0% Sales Tax 111.000.68.542.31.31.00 Total : 237761 7/18/2019 003510 CENTRAL WELDING SUPPLY LY277527 WWTP: CUTOFF WHL CUTOFF WHL 423.000.76.535.80.31.00 10.4% Sales Tax 423.000.76.535.80.31.00 RN06191006 GYMNASTICS HELIUM TANK RENT) GYMNASTICS HELIUM TANK RENT) 001.000.64.571.28.45.00 10.4% Sales Tax 001.000.64.571.28.45.00 Tota I : 237762 7/18/2019 063902 CITY OF EVERETT E19002171 WATER QUALITY LAB ANALYSYS Water Quality Lab Analysys 421.000.74.534.80.41.00 Total 237763 7/18/2019 035160 CITY OF SEATTLE 9056920000 WWTP: 5/9-7/10/19 FLOWMETER 8' 5/9-7/10/19 FLOW METER #879026 , 423.000.76.535.80.47.62 Total 237764 7/18/2019 077159 CLINE, KRISTINA 2002180.009 REFUND: PLAZA ROOM RENTAL C/ 6.3.a Page: 6 Page: 6 Packet Pg. 33 vchlist 07/18/2019 8:48:36AM Voucher List City of Edmonds 6.3.a Page: 7 Bank code : usbank Voucher Date Vendor Invoice PO # Description/Account Amoun 237764 7/18/2019 077159 CLINE, KRISTINA (Continued) REFUND: PLAZA ROOM RENTAL C/ 001.000.239.200 885.0( Tota I : 885.0( 237765 7/18/2019 075269 COBURN, LINDA 07-16-19 JUDICAL CONFRENCE CLAIM FOR JUDICIAL CONFRENCE 001.000.23.512.50.43.00 447.0( Total : 447.0( 237766 7/18/2019 076013 DAVEY RESOURCE GROUP 85165 PROF SVCS: URBAN FOREST MAN Urban Forest Management Plan 001.000.62.558.60.41.00 500.0( Tota I : 500.0( 237767 7/18/2019 006626 DEPT OF ECOLOGY 2019-RS-WAR045513 ANNUAL SAM INVOICE 2019 Annual SAM Invoice 2019 422.000.72.531.90.41.50 19,297.0( Total: 19,297.0( 237768 7/18/2019 047450 DEPT OF INFORMATION SERVICES 2019060037 CUSTOMER ID# D200-0 SWV#0098 Scan Services for June 2019 512.000.31.518.88.42.00 285.0( Total : 285.0( 237769 7/18/2019 064531 DINES, JEANNIE 19-3945 7/9/2019 COUNCIL & COMMITTEE N 7/9/19 CITY COUNCIL MEETING 001.000.25.514.30.41.00 301.0( Total: 301.0( 237770 7/18/2019 076790 DUNGENESS CONSTRUCTION CORP ESFD.Pmt 6 FINAL ESFD.PMT 6 FINAL.THRU 6/30/19 ESFD.Pmt 6 FINAL.Thru 6/30/19 422.000.72.594.31.65.20 21,347.3E ESFD.Ret 6 422.000.223.400 -1,067.3, Tota I : 20.279.95 Page: 7 Packet Pg. 34 vchlist 07/18/2019 8:48:36AM Bank code : usbank Voucher Date Vendor 237771 7/18/2019 007253 DUNN LUMBER 237772 7/18/2019 008410 EDMONDS PRINTING CO 237773 7/18/2019 008705 EDMONDS WATER DIVISION Voucher List City of Edmonds Invoice 6469939 R26095 5-10351 237774 7/18/2019 031060 ELECSYS INTERNATIONAL CORP SIP -El 01211 237775 7/18/2019 070515 EMERALD CITY HARLEY-DAVIDSON 275717 237776 7/18/2019 069469 ENNIS-FLINT INC BID-236091 PO # Description/Account CITYWIDE - SUPPLIES Cltywide - Supplies 001.000.66.518.30.31.00 10.2% Sales Tax 001.000.66.518.30.31.00 Total WATER QUALITY BROCHURES - 45 Water Quality Brochures 421.000.74.534.80.49.00 10.4% Sales Tax 421.000.74.534.80.49.00 Total IRRIGATION AT HWY 99/CITY LINE IRRIGATION AT HWY 99/CITY LINE 001.000.64.576.80.47.00 INTERURBAN TRAIL INTERURBAN TRAIL 001.000.64.576.80.47.00 Total RADIX MONTHLY MAINTAGREEME Radix Monthly Maint Agreement - 421.000.74.534.80.48.00 Total UNIT 904 - PARTS UNIT 904 - PARTS 511.000.77.548.68.31.10 10.5% Sales Tax 511.000.77.548.68.31.10 Total BID/ED! PURCHASE OF CREATIVE 610-00001 BID/Ed! purchase of creative crosswe 6.3.a Page: 8 Page: 8 Packet Pg. 35 vchlist 07/18/2019 8:48:36AM Voucher List City of Edmonds 6.3.a Page: 9 Bank code : Voucher usbank Date Vendor Invoice PO # Description/Account a� L 3 c �a Amoun y 237776 7/18/2019 069469 ENNIS-FLINT INC (Continued) 0 140.000.61.558.70.41.00 as 1,176.0( -0 10.4% Sales Tax 140.000.61.558.70.41.00 m 122.3( .L Total: 1,298.3( y 237777 7/18/2019 077143 ENVIROISSUES INC 165-007-000-2 ESJB.SERVICES THRU 6/30/19 m ESJB.Services thru 6/30/19 421.000.74.594.34.65.41 1,104.0( ESJB.Services thru 6/30/19 m c 422.000.72.594.31.65.41 1,104.0( ESJB.Services thru 6/30/19 423.000.75.594.35.65.41 1,104.0( Total: 3,312.0( o 0 237778 7/18/2019 076992 ENVIRONMENTAL WORKS 00002 WATERFRONT REDEVELOPMENT ICL ca WATERFRONT REDEVELOPMENT I 125.000.64.594.76.65.41 43,679.2� •� 00004 WATERFRONT REDEVELOPMENT I WATERFRONT REDEVELOPMENT I o 125.000.64.594.76.65.41 52,672.0( 7a 00005 WATERFRONT REDEVELOPMENT I > 0 WATERFRONT REDEVELOPMENT I a 125.000.64.594.76.65.41 43,275.6, Q Total : 139,626.91 " rn 237779 7/18/2019 009350 EVERETT DAILY HERALD EDH861205 ESJB.LEGAL NOTICE ao ESJB.Legal Notice 421.000.74.594.34.65.41 28.9E ESJB.Legal Notice N E 423.000.75.594.35.65.41 28.9E 'M ESJB.Legal Notice 422.000.72.594.31.65.41 28.9E EDH864135 CITY ORDINACNE 4154 CITY ORDINANCE 4154 001.000.25.514.30.41.40 U 23.5' Q Page: 9 Packet Pg. 36 6.3.a vchlist Voucher List Page: 10 07/18/2019 8:48:36AM City of Edmonds Bank code : Voucher usbank Date Vendor Invoice PO # Description/Account a� L 3 c �a Amoun N 237779 7/18/2019 009350 009350 EVERETT DAILY HERALD (Continued) Total : 0 110.41 m 237780 7/18/2019 061759 FALK, ERIC M FALK EXP CLAIM 06/19 FALK EXPENSE CLAIM - SHELTON , PER DIEM 6/26-28 SHELTON, WA 001.000.41.521.40.43.00 98.0( TIPS/INCIDENTALS 6/26-6/28 001.000.41.521.40.43.00 12.5( KINGSTON-EDMONDS FERRY FARI 001.000.41.521.40.43.00 8.2( Total: 118.7( c 237781 7/18/2019 067042 FINALTOUCH FINISHING 7848 ETIQUETTE 7848 ETIQUETTE CLASS INSTRUC- d 7848 ETIQUETTE CLASS INSTRUC- 001.000.64.571.22.41.00 350.0( _ Total: 350.0( �a 237782 7/18/2019 076340 FIRSTTWO INC 1174 INV 1174 EDMONDS PD a 1YR 50 OFFICER AGENCY LICENSE E 001.000.41.521.21.41.00 2,400.0( 2 10.4% Sales Tax 4- 001.000.41.521.21.41.00 249.6( o Total: 2,649.6( 0 237783 7/18/2019 011900 FRONTIER 253-011-1177 PUBLIC WORKS OMC RADIO LINE a PUBLIC WORKS OMC RADIO LINE' Q 001.000.65.518.20.42.00 6.4< c) PUBLIC WORKS OMC RADIO LINE 111.000.68.542.90.42.00 24.4< PUBLIC WORKS OMC RADIO LINE' o 421.000.74.534.80.42.00 24.4< PUBLIC WORKS OMC RADIO LINE' ii 423.000.75.535.80.42.00 24.4' u PUBLIC WORKS OMC RADIO LINE 511.000.77.548.68.42.00 24.4( E PUBLIC WORKS OMC RADIO LINE 422.000.72.531.90.42.00 24.4( M Q Page: 10 Packet Pg. 37 vchlist 07/18/2019 8:48:36AM Bank code : usbank Voucher Date Vendor 237783 7/18/2019 011900 FRONTIER 237784 237785 237786 Voucher List City of Edmonds Invoice (Continued) 425-745-4313 425-775-1344 425-775-7865 7/18/2019 063137 GOODYEAR AUTO SERVICE CENTER 153524 7/18/2019 075082 GOUDA INCORPORATED 7/18/2019 012199 GRAINGER BID-000714 PO # Description/Account CLUBHOUSE ALARM LINES 6801 M CLUBHOUSE FIRE AND INTRUSION 001.000.66.518.30.42.00 425-775-1344 RANGER STATION 425-775-1344 RANGER STATION 001.000.64.571.23.42.00 UTILITY BILLING RADIO LINE UTILITY BILLING RADIO LINE TO FI' 421.000.74.534.80.42.00 Total FLEET TIRE INVENTORY - 14 103V State Tire Fee 511.000.77.548.68.34.30 FLEET TIRE INVENTORY (14) 511.000.77.548.68.34.30 10.5% Sales Tax 511.000.77.548.68.34.30 Total BID/ED! FINAL PAYMENT FOR UMBI BID/Ed! Final payment for umbrellas. 140.000.61.558.70.31.00 Total 9218921212 PS - SUPPLIES PS - SUPPLIES 001.000.66.518.30.31.00 10.1 % Sales Tax 001.000.66.518.30.31.00 9218921220 MEADOWDALE - SUPPLIES MEADOWDALE - SUPPLIES 001.000.66.518.30.31.00 10.4% Sales Tax 001.000.66.518.30.31.00 6.3.a Page: 11 a� L 3 c �a Amoun N 0 a m U m 140.3< N 73.7( v 72.0z c 414.6E c �a 0 14.0( �a a 1,890.0( 198.4E U 2,102.4E IS 7a 0 L a 4,353.0E Q 4,353.0E " rn ao ti 276.9, E 27.9; 'R c 320.3z z U 33.3( Q Page: 11 Packet Pg. 38 vchlist 07/18/2019 8:48:36AM Voucher List City of Edmonds Bank code : usbank Voucher Date Vendor Invoice PO # 237786 7/18/2019 012199 012199 GRAINGER (Continued) 237787 7/18/2019 071446 GREAT FLOORS COMMERCIAL SALES 994211 237788 7/18/2019 074722 GUARDIAN SECURITY SYSTEMS 237789 7/18/2019 012560 HACH COMPANY 237790 7/18/2019 012900 HARRIS FORD INC Description/Account Total ANDERSON CENTER - FLOORING Anderson Center - floor 001.000.66.518.30.31.00 10.4% Sales Tax 001.000.66.518.30.31.00 Total 928033 OLD PW - SECURITY OLD PW - SECURITY 001.000.66.518.30.48.00 10.4% Sales Tax 001.000.66.518.30.48.00 Total 11536825 WWTP: LAB PUMP TUBING 3/8" #4E LAB PUMP TUBING 3/8" #4600-50 423.000.76.535.80.31.00 10.4% Sales Tax 423.000.76.535.80.31.00 11540974 WWTP: LAB PUMP TUBING 3/8" #4E LAB PUMP TUBING 3/8" #4600-15 423.000.76.535.80.31.00 Freight 423.000.76.535.80.31.00 10.4% Sales Tax 423.000.76.535.80.31.00 Total 189010 UNIT 48 - PARTS UNIT 48 - PARTS 511.000.77.548.68.31.10 10.5% Sales Tax 511.000.77.548.68.31.10 Total 6.3.a Page: 12 a� L 3 c �a Amoun y 0 658.5E 0 U d L_ 3,352.5, N 348.E 1 3,701.2' m c 55.0( -a c �a 5.7< — 60.7; �a a E 359.0( 4- 37.3z 0 �a 0 a 119.0( Q 53.5( r' 0 17.9E ti 586.75 0 E M 69.8E W 7.3z t 77.2( Q Page: 12 Packet Pg. 39 vchlist 07/18/2019 8:48:36AM Bank code : usbank Voucher Date Vendor 237791 7/18/2019 076333 HASA INC Voucher List City of Edmonds Invoice 646902 237792 7/18/2019 074086 HEARING, SPEECH & DEAF CENTER 13031 237793 7/18/2019 060165 HWA GEOSCIENCES INC 237794 7/18/2019 073548 INDOFF INCORPORATED 13244 PO # Description/Account WWTP: 7/12/19 SOD. HYPOCHLORI SOD. HYPOCHLORITE 423.000.76.535.80.31.53 10.4% Sales Tax 423.000.76.535.80.31.53 Total INTERPRETER - ASL- INTERPRETER - ASL- 001.000.23.512.50.41.01 INTERPRETER - ASL- INTERPRETER - ASL- 001.000.23.512.50.41.01 Total 29427 E5JB.SERVICES THRU 6/30/19 E5JB.Services thru 6/30/19 421.000.74.594.34.65.41 E5JB.Services thru 6/30/19 423.000.75.594.35.65.41 E5JB.Services thru 6/30/19 422.000.72.594.31.65.41 Total 3259681 STAMP PAD REFILLS Stamp pad refills - Trodat 4913 - Qty 001.000.31.514.23.31.00 10.4% Sales Tax 001.000.31.514.23.31.00 3264181 SUPPLIES - PROBATION SUPPLIES - PROBATION 001.000.23.523.30.31.00 10.4% Sales Tax 001.000.23.523.30.31.00 3265924 COPY PAPER 4 reams color copy paper 6.3.a Page: 13 aD L 3 c �a Amoun y 0 a m 1,808.9, u L 188.1< 1,997.0° m v 190.0( a� 206.7( 396.7( o 0 �a a 1,213.9, •� 1,213.9' p Ta 1,213.9< p 3,641.7f a a Q rn 13.9( ao ti 1.4c o E M 37.1( c 3.8E E t U �a Q Page: 13 Packet Pg. 40 vchlist 07/18/2019 8:48:36AM Bank code : usbank Voucher Date Vendor 237794 7/18/2019 073548 INDOFF INCORPORATED 237795 7/18/2019 070250 IRON MOUNTAIN 237796 7/18/2019 017050 KW ICK'N KLEEN CAR WASH 237797 7/18/2019 067725 LES SCHWAB TIRE CENTER 237798 7/18/2019 073226 LIFE LINE SCREENING 237799 7/18/2019 071140 MAD SCIENCE OF SNO-KING Voucher List City of Edmonds Invoice PO # Description/Account (Continued) 001.000.62.524.10.31.00 Tota I : 201910887 06-19 OFF SITE DATA STORAGE SE Jun-2019 Off site data storage servic( 512.000.31.518.88.41.00 Total 06252019-01 MAY 2019 CAR WASH CHARGES 32 CAR WASHES @a $5.07 EA 001.000.41.521.22.48.00 Tota I : 80500272174 UNIT #19 - WHEEL SERVICE UNIT 19 - WHEEL SERVICE 511.000.77.548.68.48.00 10.4% Sales Tax 511.000.77.548.68.48.00 Tota I : 2002191.009 REFUND: PLAZA ROOM DAMAGE C REFUND: PLAZA ROOM DAMAGE C 001.000.239.200 Tota I : 7835 MAD SCIENCE 7835 MAD SCIENCE CAMP INSTRU 7835 CRAZY CHEMWORKS MAD S( 001.000.64.571.22.41.00 7836 MAD SCIENCE 7836 SPY ACADEMY MAD SCIENCE 7836 SPY ACADEMY MAD SCIENCE 001.000.64.571.22.41.00 7837 MAD SCIENCE 7837 MAD SCIENCE CAMP INSTRU 7837 FULL DAY CRAZY CHEMWORI 001.000.64.571.22.41.00 Tota I : 6.3.a Page: 14 a� L 3 c �a Amoun y 0 a aD 57.9z -0 114.2: u m L_ N 207.E 207.E , m c d 162.2z 162.2' 0 L �a 449.9� a E 46.8( 496.75 0 7a 0 L 200.0( a 200.0( Q rn ao 1,704.0( c E 568.0( c aD 2,915.0( E 5,187.0( u Q Page: 14 Packet Pg. 41 vchlist 07/18/2019 8:48:36AM Voucher List City of Edmonds Bank code : usbank Voucher Date Vendor Invoice 237800 7/18/2019 076626 MCCANN TRUCKING AND EXCAVATING E6GC.Pmt 7 237801 7/18/2019 076984 MIHO & DIEGO DUO 237802 7/18/2019 021983 MOTOR TRUCKS INC 237803 7/18/2019 076259 MTR WESTERN LLC 237804 7/18/2019 075770 NEOFUNDS BY NEOPOST 237805 7/18/2019 073714 OLBRECHTS & ASSOC PLLC 7/16/19 CONCERT PO # Description/Account E6GC.PMT 7 THRU 1/31/19 E6GC.Pmt 7 thru 1/31/19 423.000.75.594.35.65.30 Total ; 7/16/2019 SUMMER CONCERT IN TI 7/16/2019 SUMMER CONCERT IN TI 117.100.64.573.20.41.00 Total ME150781 UNIT 66 - SENSOR UNIT 66 - sensor 511.000.77.548.68.31.10 10.4% Sales Tax 511.000.77.548.68.31.10 P/79109 P/79110 12251158 Total ; TROLLEY FOR AUGUST 3, 2019 DO Trolley for August 3, 2019 Downtown 001.000.61.558.70.41.00 TROLLEY FOR AUGUST 10, 2019 D1 Trolley for August 10, 2019 Downtowr 001.000.61.558.70.41.00 Total 7900044080303286 POSTAGE ADDE 7900044080303286 POSTAGE ADDE 001.000.25.514.30.31.00 7900044080303286 POSTAGE ADD[ 001.000.25.514.30.42.00 Total JUNE 2019 JUNE 2019 HE SERVICES June 2019 HE Services 001.000.62.558.60.41.00 MAY 2019 HEARING EXAMINER SVCS PLN20" 6.3.a Page: 15 aD L 3 c �a Amoun N 0 a m 11,057.5E u 11,057.51 N m 500.0( 500.0( m c a� 622.5E 64.7E 687.3( a E U 1,430.0( o 7a 1,430.0( a 2,860.0( Q rn ao 379.7E r` 0 4,160.0; 4,539.8E c aD 243.5, E U co Q Page: 15 Packet Pg. 42 vchlist 07/18/2019 8:48:36AM Voucher List City of Edmonds 6.3.a Page: 16 Bank code : Voucher usbank Date Vendor Invoice PO # Description/Account a� L 3 c �a Amoun y 237805 7/18/2019 073714 OLBRECHTS & ASSOC PLLC (Continued) 0 HE Services PLN20180039 Waterfror 001.000.245.967 1,460.0( u HE Svcs PLN20180039 Waterfront 125.000.64.594.76.65.41 6,729.3E N Total: 8,432.81 m 237806 7/18/2019 074648 PACIFIC NORTHWEST CATERING LLC 5337 PACIFIC NORTHWEST CATERING - v Pacific Northwest Catering - Budget 001.000.11.511.60.31.00 448.1E Total : 448.1E 237807 7/18/2019 007800 PETTY CASH Feb6-July12 PETTY CASH Mileage to training - Kernen Lien — 001.000.62.558.60.43.00 34.2, Parking - Shane Hope a 001.000.62.524.10.43.00 7.0( Parking for Finance Conference - Scc 001.000.31.514.20.49.00 14.0( U Postage for overseas mailing - Nori c 001.000.31.514.23.42.00 17.6z 7a Parking for GIS Meeting - Dave Rohd p 512.000.31.518.88.43.00 6.0( a Reference Book - Rob Chave Q 001.000.62.558.60.49.00 40.0( v mileage and parking for PS Regional 001.000.11.511.60.43.00 35.7, 00 Total : 154.5f rz. 0 237808 7/18/2019 076892 PNCWA 3032 WWTP: PRANDOLPH 2O19 PNCWA E PRANDOLPH 2O19 PNCWA CONF M 423.000.76.535.80.49.71 530.0( U 3033 WWTP: EDUENAS+RSLENKER 201 c EDUENAS+RSLENKER 2019 PNCVA E 423.000.76.535.80.49.71 1,300.0( U �a Q Page: 16 Packet Pg. 43 vchlist 07/18/2019 8:48:36AM Bank code : usbank Voucher Date Vendor 237808 7/18/2019 076892 076892 PNCWA 237809 7/18/2019 071811 PONY MAIL BOX & BUSINESS CTR 237810 7/18/2019 029117 PORT OF EDMONDS 237811 7/18/2019 071559 PUBLIC SAFETY SELECTION PC 237812 7/18/2019 074156 RAZZ CONSTRUCTION INC 237813 7/18/2019 062657 REGIONAL DISPOSAL COMPANY Voucher List City of Edmonds Invoice (Continued) 1115688 03870 4693 E4MB.Pmt 11 FINAL �PPPP1+'Y��'1 237814 7/18/2019 066786 RELIABLE SECURITY SOUND & DATA 23027 237815 7/18/2019 061540 REPUBLIC SERVICES #197 3-0197-0800897 PO # Description/Account SEWER - PUSH CAMERA Sewer - push camera 423.000.75.535.80.31.00 Total Total : PORT RIGHT-OF-WAY LEASE FOR PORT RIGHT-OF-WAY LEASE FOR 422.000.72.531.90.41.50 Total INV 4693 - EDMONDS PD - 6/30/19 PRE -HIRE EXAMS (5) ON 6/11/19 001.000.41.521.10.41.00 Total E4MB.PMT 11 FINAL.THRU 5/31/19 E4MB.Pmt 11 FINAL.thru 5/31/19 332.000.64.594.76.65.00 Total STORM STREET SWEEPING DUMP Storm Street Sweeping Dump Fees 422.000.72.531.10.49.00 Total CITY WIDE - SECURITY CAMERA SI City Wide - Securtiy Camera Install 001.000.66.518.30.31.00 10.4% Sales Tax 001.000.66.518.30.31.00 Total PUBLIC WORKS OMC 7110 210TH PUBLIC WORKS OMC 7110 210TH 001.000.65.518.20.47.00 6.3.a Page: 17 aD L 3 c �a Amoun y 0 1,830.0( 0 U d L_ 18.6< 18.6: Y m 3,345.3� 3,345.% c �a 2,000.0( o 2,000.0( a E 75,000.0( 75,000.0( 0 Ta 0 L a a 3,209.0( Q 3,209.0( c, ao r` 504.7E N E 52.4E fd 557.2' c aD E t U 34.4E Q Page: 17 Packet Pg. 44 vchlist 07/18/2019 8:48:36AM Voucher List City of Edmonds Bank code : usbank Voucher Date Vendor Invoice 237815 7/18/2019 061540 REPUBLIC SERVICES #197 (Continued) 3-0197-0801132 3-0197-0829729 237816 7/18/2019 064769 ROMAINE ELECTRIC 5-023482 237817 7/18/2019 077155 SARAH CRUMB ART BirdFest 2019 Poster 237818 7/18/2019 073752 SCIACCA, MATTHEW 7/14/19 CONCERT PO # Description/Account PUBLIC WORKS OMC 7110 210TH 111.000.68.542.90.47.00 PUBLIC WORKS OMC 7110 210TH 421.000.74.534.80.47.00 PUBLIC WORKS OMC 7110 210TH 423.000.75.535.80.47.10 PUBLIC WORKS OMC 7110 210TH 511.000.77.548.68.47.00 PUBLIC WORKS OMC 7110 210TH 422.000.72.531.90.47.00 FIRE STATION #16 8429 196TH ST FIRE STATION #16 8429 196TH ST 001.000.66.518.30.47.00 CLUBHOUSE 6801 N MEADOWDAL CLUBHOUSE 6801 N MEADOWDAL 001.000.66.518.30.47.00 Total UNITS (65, 453, 385) BATTERIES UNITS (65, 453, 385) BATTERIES - T 511.000.77.548.68.31.10 10.4% Sales Tax 511.000.77.548.68.31.10 Total BIRD FEST POSTER ART AWARD F Bird Fest poster art award for 2019 001.000.61.558.70.41.00 Total 7/14/2019 SUMMER CONCERT IN TI 7/14/2019 SUMMER CONCERT IN TI 117.100.64.573.20.41.00 Total 6.3.a Page: 18 aD L 3 c �a Amoun N 0 a m 130.9E u L 130.9E N 130.9E v 130.9E Im- (D c 130.9z m c �a 219.7' o L �a a 71.9E 980.9: U 4- 0 Ta 290.7� o a a 30.2z Q 321.W c, ao ti 200.0( N 200.0( E U c 675.0( E 675.0( �a Q Page: 18 Packet Pg. 45 vchlist 07/18/2019 8:48:36AM Voucher List City of Edmonds 6.3.a Page: 19 Bank code : Voucher usbank Date Vendor Invoice PO # Description/Account a� L 3 c �a Amoun N 0 237819 7/18/2019 066964 SEATTLE AUTOMOTIVE DIST INC S3-4571269 UNIT 48 - BRAKES m UNIT 48 - BRAKE 511.000.77.548.68.31.10 111.9E U 10.4% Sales Tax L 511.000.77.548.68.31.10 11.6z S3-4572146 UNIT 48 - PARTS UNIT 48 - PARTS 511.000.77.548.68.31.10 37.4; v 10.4% Sales Tax 511.000.77.548.68.31.10 3.8� (D S5-4557257 FLEET BRAKE SUPPLY INVENTOR) FLEET BRAKE SUPPLY INVENTOR) 511.000.77.548.68.34.40 56.2E 10.4% Sales Tax o 511.000.77.548.68.34.40 5.8E >+ Total: 227.0f m E 237820 7/18/2019 074997 SEITEL SYSTEMS, LLC 48937 ONSITE & REMOTE COMPUTER SL Remote computer support - 6/5/19 U 512.000.31.518.88.41.00 170.0E o Onsite computer support - 6/18/19 Ta 512.000.31.518.88.41.00 595.0( o Total: 765.0( a Q 237821 7/18/2019 072214 SIGMA-ALDRICH INC 548180693 WWTP: TOTAL RESIDUAL CHLORII` TOTAL RESIDUAL CHLORINE & CH r' 423.000.76.535.80.31.00 100.4( 00 Freight rz. 423.000.76.535.80.31.00 1.9E N 10.4% Sales Tax E 423.000.76.535.80.31.00 10.6E R 548205078 WWTP: PH - WP & PH - WATER U PH -WP&PH - WATER 423.000.76.535.80.31.00 97.6( E Freight U 423.000.76.535.80.31.00 13.4E Q Page: 19 Packet Pg. 46 vchlist 07/18/2019 8:48:36AM Bank code : usbank Voucher Date Vendor 237821 7/18/2019 072214 SIGMA-ALDRICH INC 237822 7/18/2019 068489 SIRENNET.COM 237823 7/18/2019 037375 SNO CO PUD NO 1 Voucher List City of Edmonds Invoice PO # Description/Account (Continued) 10.4% Sales Tax 423.000.76.535.80.31.00 Tota I : 0240677-IN UNITS E161,162EQ -163EQ UNITS E161,162EQ -163EQ 511.100.77.594.48.64.00 10.4% Sales Tax 511.100.77.594.48.64.00 Total 200202554 WWTP: 6/5-7/3/19 FLOWMETER 101 6/5-7/3/19 FLOW METER 2400 HIGI 423.000.76.535.80.47.62 200496834 LIFT STATION #10 17526 TALBOT R LIFT STATION #10 17526 TALBOT R 423.000.75.535.80.47.10 200650851 CITY PARK RESTROOMS CITY PARK RESTROOMS 001.000.64.576.80.47.00 200651644 PARK MAINTENANCE SHOP PARK MAINTENANCE SHOP 001.000.64.576.80.47.00 201184538 HICKMAN PARK HICKMAN PARK 001.000.64.576.80.47.00 201383270 CITY PARK GAZEBO CITY PARK GAZEBO 001.000.64.576.80.47.00 201431236 PEDEST CAUTION LIGHT 9110 OILY PEDEST CAUTION LIGHT 9110 OILY 111.000.68.542.64.47.00 201441755 TRAFFIC LIGHT 21531 HWY 99 / ME TRAFFIC LIGHT 21531 HWY 99 / ME 111.000.68.542.63.47.00 6.3.a Page: 20 aD L 3 c �a Amoun N 0 a m 11.5E u 235.6: •`— N m 186.8E 19.4, 206m% c �a 16.6( �a a 65.7( •E 0 17.1, 0 L a 733.4, Q rn 24.0E o ti 0 17.1, E 2 U 18.32 c a� E t U 151.4, .2 Q Page: 20 Packet Pg. 47 vchlist 07/18/2019 8:48:36AM Bank code : usbank Voucher Date Vendor 237823 7/18/2019 037375 SNO CO PUD NO 1 237824 237825 237826 7/18/2019 006630 SNOHOMISH COUNTY 7/18/2019 038300 SOUND DISPOSAL CO Voucher List City of Edmonds Invoice (Continued) 201453057 201790003 202114484 202289450 205184385 221732084 75122 104757 7/18/2019 074990 STANTEC CONSULTING SERVICES 1526886 PO # Description/Account CIVIC CENTER PLAYFIELD LIGHTS CIVIC CENTER PLAYFIELD LIGHTS 001.000.64.576.80.47.00 ALDERWOOD INTERIE 6130 168TH ALDERWOOD INTERIE 6130 168TH 421.000.74.534.80.47.00 CITY PARK S RESTROOMS & SHEL CITY PARK S RESTROOMS & SHEL 001.000.64.576.80.47.00 TRAFFIC LIGHT 21931 HWY 99 / ME TRAFFIC LIGHT 21931 HWY 99 / ME 111.000.68.542.64.47.00 LIFT STATION #5 432 3RD AVE S / fV LIFT STATION #5 432 3RD AVE S / fV 423.000.75.535.80.47.10 VETERANS PLAZA METER 1000597 VETERANS PLAZA METER 1000597 001.000.64.576.80.47.00 Total PARKS MAINT 5005 DUMP FEES PARKS MAINT DUMP FEES 001.000.64.576.80.47.00 ILLEGAL DUMP FEES 422.000.72.531.10.49.00 Total WWTP: 6/2019 ROLLOFF ASH DISF 6/2019 Ash disposal & taxes 423.000.76.535.80.47.65 Total EBJA.SERVICES THRU MAY 2019 EBJA.Services thru May 2019 421.000.74.594.34.65.41 6.3.a Page: 21 a� L 3 c �a Amoun N 0 a m U m 68.0( N 19.9" v 65.8, c a� 70.6" 0 L 40.8( a E 91.11 U 45 1,400.2i 0 0 0 L a 1,007.0( Q rn 10.0( 1,017.0( °r° ti 0 E 2,894.3" n 2,894.31 u c aD E t 4,899.6( Q Page: 21 Packet Pg. 48 vchlist 07/18/2019 8:48:36AM Voucher List City of Edmonds Bank code : usbank Voucher Date Vendor Invoice PO # 237826 7/18/2019 074990 074990 STANTEC CONSULTING SERVICES (Continued) 237827 7/18/2019 065578 SYSTEMS INTERFACE INC 23858 237828 237829 237830 237831 7/18/2019 063939 TYLER TECHNOLOGIES INC 7/18/2019 070902 ULVESTAD, KAREN Q1;% 1 045-267210 7831 PHOTOGRAPHY 7/18/2019 077070 UNITED RECYCLING & CONTAINER 79976 7/18/2019 071549 UNIVAR USA INC KT575127 Description/Account Total WATER - 5 CORNERS SERVICE 5 corners materials, Pressure 421.000.74.534.80.48.00 Engineering & Field Service 421.000.74.534.80.48.00 10.4% Sales Tax 421.000.74.534.80.48.00 SEWER - LS TROUBLESHOOTING Install rack mount UPS SmartSlot Ca 423.000.75.535.80.41.00 10.4% Sales Tax 423.000.75.535.80.41.00 Total CUSTOMIZATION OF EDEN SOFTW Customization of EDEN Software UB 421.000.74.534.80.41.00 Customization of EDEN Software UB 423.000.75.535.80.41.00 Total 7831 DIGITAL PHOTOGRAPHY CAM 7831 DIGITAL PHOTOGRAPHY CAM 001.000.64.571.22.41.00 Total STORM - DUMP FEES Storm - Dump Fees 422.000.72.531.10.49.00 WWTP: SOD. BISULFITE SOD. BISULFITE 423.000.76.535.80.31.54 Total : 6.3.a Page: 22 aD L 3 c �a Amoun y 0 4,899.6: 0 U d L_ 1,354.6, N 1,760.8( U 324.0- c d 1,898.1 £ c �a 197.4- o 5,535.0' ">, M a E 500.0( U 0 500.0( ii 1,000.0( p L Q a Q 81.0( 0) 81.0( ao ti 0 195.0( 195.0( c aD E t 1,904.4, U Q Page: 22 Packet Pg. 49 vchlist 07/18/2019 8:48:36AM Voucher List City of Edmonds 6.3.a Page: 23 Bank code : Voucher usbank Date Vendor Invoice PO # Description/Account Amoun 237831 7/18/2019 071549 UNIVAR USA INC (Continued) 10.4% Sales Tax 423.000.76.535.80.31.54 198.0E Tota I : 2,102.41 237832 7/18/2019 067865 VERIZON WIRELESS 9833161600 C/A 442201730-00001 iPad Cell Service Mayor's Office 001.000.21.513.10.42.00 35.1 , Total : 35.1: 237833 7/18/2019 047605 WA ST TREASURER Q2-2019 FORFEITURES Q2- 2019 FORFEITURES- EDMOND; 02-2019 FORFEITURES 104.000.237.100 153.9( Tota I : 153.9( 237834 7/18/2019 075155 WALKER MACY LLC P3282.04-14 CIVIC LANDSCAPE ARCHITECTURE CIVIC LANDSCAPE ARCHITECTURE 125.000.64.594.76.65.41 10,437.8E Total: 10,437.81 237835 7/18/2019 066238 WASHINGTON TRACTOR 1854869 PM SUPPLIES: PIN FASTENER, QUI PM SUPPLIES: PIN FASTENER, QUI 001.000.64.576.80.31.00 65.7' Sales Tax 001.000.64.576.80.31.00 6.0z Total: 71.7, 237836 7/18/2019 075635 WCP SOLUTIONS 11273987 FAC MAINT - SUPPLIES FAC MAINT - SUPPLIES 001.000.66.518.30.31.00 1,957.0z 10.4% Sales Tax 001.000.66.518.30.31.00 203.5' Total : 2,160.5 , 237837 7/18/2019 072627 WEST SAFETY SERVICES INC 7010484 MONTHLY 911 DATABASE MAINT Monthly 911 database maint 512.000.31.518.88.48.00 200.0( Page: 23 Packet Pg. 50 vchlist 07/18/2019 8:48:36AM Bank code : usbank Voucher List City of Edmonds Voucher Date Vendor Invoice 237837 7/18/2019 072627 072627 WEST SAFETY SERVICES INC 93 Vouchers for bank code : usbank 93 Vouchers in this report PO # Description/Account (Continued) Total Bank total Total vouchers 6.3.a Page: 24 a� L 3 c �a Amoun y 0 200.0( 0 585,341.6E u m L 585,341.6E `a N V d L V r (D C d C O L Q U 4- 0 0 L Q Q Q r r ti 0 I_ 2 V a 4) E U Y Q Page: 24 Packet Pg. 51 6.3.b vchlist 07/12/2019 8:37:39AM Bank code : usbank Voucher Date Vendor 7122019 7/12/2019 062693 US BANK Voucher List City of Edmonds Invoice PO # Description/Account 3915 DSD VISA VARIOUS: DIRECTOR (SI Snohomish County Park Garage -Eves 001.000.62.524.10.43.00 RPNW Seattle (Parking) 001.000.62.524.10.43.00 Registration: Congress for the New 001.000.62.524.10.49.00 Parking: Seattle Meter 001.000.62.524.10.43.00 4929 DSD VISA - VARIOUS Amazon: misc. kitchen supplies 001.000.62.524.10.31.00 Amazon: misc kitchen supplies 001.000.62.524.10.31.00 Amazon: misc office supplies 001.000.62.524.10.31.00 Amazon: Misc office supplies 001.000.62.524.10.31.00 Registration (BShipley): Housing ForI 001.000.62.558.60.49.00 Amazon: Misc office supplies 001.000.62.524.10.31.00 Adobe: Creative Cloud subscription 001.000.62.524.10.41.00 Amazon: office supplies 001.000.62.524.10.31.00 Land Use Case Law webinar registrai 001.000.62.558.60.49.00 AWB Registration: Housing Forum 7, 001.000.62.524.10.49.00 4929 REFUND: DSD VISA AWB Registration cancellation/refund 001.000.62.524.10.49.00 Page: 1 m L 3 c ea Amoun 00 a 0 0 4.0( m =a 26.0( Y m 125.0( u 2.7E a� 13.2( 79.2E �a 0_ 16.5E E .ii 19.82 U 0 95.0( 0 L 27.3E 0- Q 58.5( rn 99.9( CD 35.0( L 3 95.0(; c E -95.0( �a a Page: 1 Packet Pg. 52 vchlist 07/12/2019 8:37:39AM Bank code: usbank Voucher Date Vendor 7122019 7/12/2019 062693 062693 US BANK 1 Vouchers for bank code : usbank 1 Vouchers in this report Voucher List City of Edmonds Invoice PO # Description/Account (Continued) Total Bank total Total vouchers 6.3.b Page: 2 m L 3 c Amoun .y 602.3! a m 602.3° m 602.3° •L N Y V d t V w d C O C O L Q E V O O L Q a M r N O d L 3 c as E M a Page: 2 Packet Pg. 53 6.3.c PROJECT NUMBERS (By Project Title) Project Engineering Accounting Project Funding Protect Title Number Number c W STM 174th St. & 71st Ave Storm Improvements c521 EBFB E STM 183rd PI SW Storm Repairs c491 E61FE R 0. m SWR 2016 Sanitary Sewer Replacement Projects c469 ESGA 3 SWR 2017 Sanitary Sewer Replacement Project i013 E6GA WTR 2017 Waterline Replacement Projects i014 E6J13 r STM 2018 Lorian Woods Study s018 EBFA Q. am STR 2018 Minor Sidewalk Project i032 EBDA U STR 2018 Overlay Program i030 EBCB 4) SWR 2018 Sewerline Overlays i035 EBCE is ui lid SWR 2018 Sewerline Replacement Project c492 E6GC U STR 2018 Traffic Calming i027 EBAA U r WTR 2018 Waterline Overlays i034 EBCD c WTR 2018 Waterline Replacement Project c493 E6JC STR 2019 Downtown Parking Study s021 E9AC STR 2019 Guardrail Install i039 E9AB c 0 STR 2019 Overlay Program i036 E9CA STR 2019 Pedestrian Safety Program i041 E9DB SWR 2019 Sewerline Replacement Project c516 EBGA f° v STM 2019 Storm Maintenance Project c525 EBFC 0 WTR 2019 Swedish Waterline Replacement c523 EBJA > 0 STR 2019 Traffic Calming i038 E9AA a a STR 2019 Traffic Signal Upgrades i045 E9AD Q UTILITIES 2019 Utility Rate & GFC Update s020 EBJB WTR 2019 Waterline Overlay i043 E9Cl3 WTR 2019 Waterline Replacement c498 E7JA ti c N STR 2020 Overlay Program i042 EOCA L STR 220th Adaptive i028 EBAB E STM 224th & 98th Drainage Improvements c486 E6FB z o L STR 228th St. SW Corridor Improvements i005 E7AC IL STR 236th St. SW Walkway (Edmonds Way to Madrona School) c425 E3DD d 0 D STR 238th St. Island & Misc. Ramps i037 EBDC c STR 238th St. SW Walkway (100th Ave to 104th Ave) c423 E3DB STR 238th St. SW Walkway (Edmonds Way to Hwy 99) c485 E6DA Li STR 76th Ave W & 220th St. SW Intersection Improvements i029 EBCA STR 76th Ave W at 212th St SW Intersection Improvements c368 E1CA CD E t STR 84th Ave W Overlay from 220th to 212th i031 EBCC U STR 89th PI W Retaining Wall i025 E7CD r r Q STR ADA Curb Ramps i033 EBDB STR ADA Transition Plan s016 E6DB Revised 7/18/2019 Packet Pg. 54 6.3.c PROJECT NUMBERS (By Project Title) Project Engineering Accounting Project Fundinq Project Title Number Number STR Admiral Way Pedestrian Crossing i040 E9DA STR Audible Pedestrian Signals i024 E7AB STR Bikelink Project c474 E5DA SWR Citywide CIPP Sewer Rehab Phase I c456 E4GB SWR Citywide CIPP Sewer Rehab Phase II c488 E6GB STR Citywide Pedestrian Crossing Enhancements i026 E7DC STR Citywide Protected/Permissive Traffic Signal Conversion i015 E6AB WTR Dayton St. Utility Replacement Project (3rd Ave to 9th Ave) c482 E5J13 STM Dayton Street Stormwater Pump Station c455 E4FE FAC Edmonds Fishing Pier Rehab c443 E4MB STM Edmonds Marsh Feasibility Study c380 E2FC STR Edmonds Street Waterfront Connector c478 E5DB WTR Five Corners Reservoir Re -coating c473 E51KA PM Fourth Avenue Cultural Corridor c282 E8MA STR Hwy 99 Enhancements (Phase III) c405 E2AD STR Hwy 99 Gateway Revitalization s014 E6AA STM Lake Ballinger Associated Projects c436 E4FD SWR Lake Ballinger Trunk Sewer Study s011 E5GB SWR Lift Station #1 Basin & Flow Study c461 E4GC STR Minor Sidewalk Program i017 E6DD STM Northstream Culvert Repair Under Puget Drive i011 E6FA STM Northstream Pipe Abandonment on Puget Drive c410 EYE STM NPDES (Students Saving Salmon) m013 E7FG STM OVD Slope Repair & Stabilization m105 E7FA STM Seaview Park Infiltration Facility c479 E5FD WWTP Sewer Outfall Groundwater Monitoring c446 E4HA UTILITIES Standard Details Updates solo E5NA STM Storm Drain Improvements @ 9510 232nd St. SW c495 E7FB STM Stormwater Comp Plan Update s017 E6FD STR Sunset Walkway Improvements c354 ElDA STR Trackside Warning System c470 E5AA UTILITIES Utility Rate Update s013 E6JA PRK Veteran's Plaza c480 E6MA PRK Waterfront Restoration m103 E7MA STM Willow Creek Daylighting/Edmonds Marsh Restoration c435 E4FC WWTP WWTP Outfall Pipe Modifications c481 E5HA Revised 7/18/2019 Packet Pg. 55 6.3.c PROJECT NUMBERS (By Engineering Number) Engineering Protect Project Accounting Funding Number Number Protect Title STR EOCA i042 2020 Overlay Program STIR E1CA c368 76th Ave W at 212th St SW Intersection Improvements c354 Sunset Walkway Improvements STIR E2AD c405 Hwy 99 Enhancements (Phase III) E2FC Edmonds Marsh Feasibility Study STIR E3DB c423 238th St. SW Walkway (100th Ave to 104th Ave) ■ STIR E3DD c425 236th St. SW Walkway (Edmonds Way to Madrona School) STM E3FE c410 Northstream Pipe Abandonment on Puget Drive E4FC M" �illow Creek Daylighting/Edmonds Marsh Restoration STM E4FD c436 Lake Ballinger Associated Projects FEB Dayton Street Stormwater Pump Station SWR E4GB c456 Citvwide CIPP Sewer Rehab Phase I c461 Lift Station #1 Basin & Flow Study WWTP E4HA c446 Sewer Outfall Groundwater Monitoring E4MB Edmonds Fishing Pier Rehab STIR ESAA c470 Trackside Warning System iSTIR ESDA Bikelink Project STIR ESDB c478 Edmonds Street Waterfront Connector STM c479 Seaview Park Infiltration Facility SWR ESGA c469 2016 Sanitary Sewer Replacement Projects SWR s011 Lake Ballinger Trunk Sewer Study WWTP ESHA c481 WWTP Outfall Pipe Modifications Dayton St. Utility Replacement Project (3rd Ave to 9th Ave) WTR ESKA c473 Five Corners Reservoir Re -coating andard Details Upda STIR E6AA s014 Hwv 99 Gatewav Revitalization Citywide Protected/Permissive Traffic Signal Conversion STIR E6DA c485 238th St. SW Walkway (Edmonds Way to Hwy 99) s016 ADA Transition Plan STIR E6DD i017 Minor Sidewalk Program 1 Northstream Culvert Repair Under Puget Drive STM E6FB c486 224th & 98th Drainage Improvements STM E61FE c491 183rd PI SW Storm Repairs SWR i013 2017 Sanitary Sewer Replacement Project SWR E6GB c488 Citywide CIPP Sewer Rehab Phase II SWR c492 2018 Sewerline Replacement Project UTILITIES E6JA s013 Utility Rate Update WTR E6JB i014 2017 Waterline Replacement Projects Revised 7/18/2019 Packet Pg. 56 6.3.c PROJECT NUMBERS (By Engineering Number) Engineering Protect Project Accounting Funding Number Number Protect Title WTR E6JC c493 2018 Waterline Replacement Project PRK �MA c480 Veteran's Plaza STR E7AB i024 Audible Pedestrian Signals STR i005 228th St. SW Corridor Improvements STR E7CD i025 89th PI W Retaining Wall STR i026 Citywide Pedestrian Crossing Enhancements STM E7FA m 105 OVD Slope Repair & Stabilization STM caft provements @ 9510 232nd St. SW STM E7FG m013 NPDES (Students Saving Salmon) 2019 Waterline Replacement PRK E7MA m103 Waterfront Restoration 2018 Traffic Calming STR E8AB i028 220th Adaptive i029 76th Ave W & 220th St. SW Intersection Improvements STR E8CB i030 2018 Overlay Program CC i031 84th Ave W Overlay from 220th to 212th WTR E8CD i034 2018 Waterline Overlays i035 2018 Sewerline Overlays STR E8DA i032 2018 Minor Sidewalk Project i033 ADA Curb Ramps STR E8DC i037 238th St. Island & Misc. Ramps 018 oods Study STM E8FB c521 174th St. & 71 st Ave Storm Improvements 525 2019 Storm Maintenance Project SWR E8GA c516 2019 Sewerline Replacement Project 3 2019 Swedish Waterline Replacement UTILITIES E8JB s020 2019 Utility Rate & GFC Update c282 Fourth Avenue Cultural Corridor STR E9AA i038 2019 Traffic Calming i039 2019 Guardrail Install STR E9AC s021 2019 Downtown Parking Study 2019 Traffic Signal Upgrades STR E9CA i036 2019 Overlay Program WTR E9CB i043 2019 Waterline Overlay STR E9DA i040 Admiral Way Pedestrian Crossing STR E9DB i041 2019 Pedestrian Safety Progr Revised 7/18/2019 Packet Pg. 57 6.3.c PROJECT NUMBERS (By New Project Accounting Number) Engineering Protect Project Accounting Funding Number Number Protect Title PM E8MA c282 Fourth Avenue Cultural Corridor STR E1DA c354 Sunset Walkway Improvements STR E1 CA c368 76th Ave W at 212th St SW Intersection Improvements STM E2FC c380 Edmonds Marsh Feasibility Study STR E2AD c405 Hwy 99 Enhancements (Phase III) STM EYE c410 Northstream Pipe Abandonment on Puget Drive STR E3DB c423 238th St. SW Walkway (100th Ave to 104th Ave) STR E3DD c425 236th St. SW Walkway (Edmonds Way to Madrona School) STM E4FC c435 Willow Creek Daylighting/Edmonds Marsh Restoration STM E4FD c436 Lake Ballinger Associated Projects FAC E4MB c443 Edmonds Fishing Pier Rehab WWTP E4HA c446 Sewer Outfall Groundwater Monitoring STM E4FE c455 Dayton Street Stormwater Pump Station SWR E4GB c456 Citywide CIPP Sewer Rehab Phase I SWR E4GC c461 Lift Station #1 Basin & Flow Study SWR E5GA c469 2016 Sanitary Sewer Replacement Projects STR E5AA c470 Trackside Warning System WTR E51KA c473 Five Corners Reservoir Re -coating STR E5DA c474 Bikelink Project STR E5DB c478 Edmonds Street Waterfront Connector STM E5FD c479 Seaview Park Infiltration Facility PRK E6MA c480 Veteran's Plaza WWTP E5HA c481 WWTP Outfall Pipe Modifications WTR E5J13 c482 Dayton St. Utility Replacement Project (3rd Ave to 9th Ave) STR E6DA c485 238th St. SW Walkway (Edmonds Way to Hwy 99) STM E6FB c486 224th & 98th Drainage Improvements SWR E6GB c488 Citywide CIPP Sewer Rehab Phase 11 STM E6FE c491 183rd PI SW Storm Repairs SWR E6GC c492 2018 Sewerline Replacement Project WTR E6JC c493 2018 Waterline Replacement Project STM E7FB c495 Storm Drain Improvements @ 9510 232nd St. SW WTR E7JA c498 2019 Waterline Replacement SWR E8GA c516 2019 Sewerline Replacement Project STM E8FB c521 174th St. & 71st Ave Storm Improvements WTR E8JA c523 2019 Swedish Waterline Replacement STM E8FC c525 2019 Storm Maintenance Project STR E7AC i005 228th St. SW Corridor Improvements STM E6FA i011 Northstream Culvert Repair Under Puget Drive SWR E6GA i013 2017 Sanitary Sewer Replacement Project Revised 7/18/2019 Packet Pg. 58 6.3.c PROJECT NUMBERS (By New Project Accounting Number) Engineering Protect Project Accounting Funding Number Number Protect Title WTR E6JB i014 2017 Waterline Replacement Projects STR E6AB i015 Citywide Protected/Permissive Traffic Signal Conversion STR E6DD i017 Minor Sidewalk Program STR E7AB i024 Audible Pedestrian Signals STR E7CD i025 89th PI W Retaining Wall STR E7DC i026 Citywide Pedestrian Crossing Enhancements STR EBAA i027 2018 Traffic Calming STR EBAB i028 220th Adaptive STR EBCA i029 76th Ave W & 220th St. SW Intersection Improvements STR EBCB i030 2018 Overlay Program STR EBCC i031 84th Ave W Overlay from 220th to 212th STR EBDA i032 2018 Minor Sidewalk Project STR EBDB i033 ADA Curb Ramps WTR EBCD i034 2018 Waterline Overlays SWR EBCE i035 2018 Sewerline Overlays STR E9CA i036 2019 Overlay Program STR EBDC i037 238th St. Island & Misc. Ramps STR E9AA i038 2019 Traffic Calming STR E9AB i039 2019 Guardrail Install STR E9DA i040 Admiral Way Pedestrian Crossing STR E9DB i041 2019 Pedestrian Safety Program STR EOCA i042 2020 Overlay Program WTR E9CB i043 2019 Waterline Overlay STR E9AD i045 2019 Traffic Signal Upgrades STM E7FG m013 NPDES (Students Saving Salmon) PRK E7MA m103 Waterfront Restoration STM E7FA m105 OVD Slope Repair & Stabilization UTILITIES ESNA solo Standard Details Updates SWR ESGB s0l l Lake Ballinger Trunk Sewer Study UTILITIES E6JA s013 Utility Rate Update STR E6AA s014 Hwy 99 Gateway Revitalization STR E6DB s016 ADA Transition Plan STM E6FD s017 Stormwater Comp Plan Update STM EBFA s018 2018 Lorian Woods Study UTILITIES EBJB s020 2019 Utility Rate & GFC Update STR E9AC s021 2019 Downtown Parking Study Revised 7/18/2019 Packet Pg. 59 6.3.c PROJECT NUMBERS (By Funding) Project Engineering Accounting Project Funding Project Title Number Number FAC Edmonds Fishing Pier Rehab c443 E4MB PM Fourth Avenue Cultural Corridor c282 EBMA PRK Veteran's Plaza c480 E6MA PRK Waterfront Restoration m103 E7MA STM 174th St. & 71 st Ave Storm Improvements c521 EBFB STM 183rd PI SW Storm Repairs c491 E61FE STM 2018 Lorian Woods Study s018 EBFA STM 2019 Storm Maintenance Project c525 EBFC STM 224th & 98th Drainage Improvements c486 E6FB STM Dayton Street Stormwater Pump Station c455 E41FE STM Edmonds Marsh Feasibility Study c380 E2FC STM Lake Ballinger Associated Projects c436 E4FD STM Northstream Culvert Repair Under Puget Drive i011 E61FA STM Northstream Pipe Abandonment on Puget Drive c410 EYE STM NPDES (Students Saving Salmon) m013 E7FG STM OVD Slope Repair & Stabilization m105 E71FA STM Seaview Park Infiltration Facility c479 ESFD STM Storm Drain Improvements @ 9510 232nd St. SW c495 E7FB STM Stormwater Comp Plan Update s017 E6FD STM Willow Creek Daylighting/Edmonds Marsh Restoration c435 E4FC STIR 2018 Minor Sidewalk Project i032 EBDA STIR 2018 Overlay Program i030 EBCB STIR 2018 Traffic Calming i027 EBAA STIR 2019 Downtown Parking Study s021 E9AC STIR 2019 Guardrail Install i039 E9AB STIR 2019 Overlay Program i036 E9CA STIR 2019 Pedestrian Safety Program i041 E9DB STIR 2019 Traffic Calming i038 E9AA STIR 2019 Traffic Signal Upgrades i045 E9AD STIR 2020 Overlay Program i042 EOCA STIR 228th St. SW Corridor Improvements i005 E7AC STIR 236th St. SW Walkway (Edmonds Way to Madrona School) c425 E3DD STIR 238th St. Island & Misc. Ramps i037 EBDC STIR 238th St. SW Walkway (100th Ave to 104th Ave) c423 E3DB STIR 238th St. SW Walkway (Edmonds Way to Hwy 99) c485 E6DA STIR 76th Ave W & 220th St. SW Intersection Improvements i029 EBCA STIR 76th Ave W at 212th St SW Intersection Improvements c368 E1CA STIR 84th Ave W Overlay from 220th to 212th i031 EBCC STIR 89th PI W Retaining Wall i025 E7CD Revised 7/18/2019 Packet Pg. 60 6.3.c PROJECT NUMBERS (By Funding) Project Engineering Accounting Project Funding Project Title Number Number STIR ADA Curb Ramps i033 E8DB STIR ADA Transition Plan s016 E6DB STIR Admiral Way Pedestrian Crossing iO4o E9DA STIR Audible Pedestrian Signals i024 E7AB STIR Bikelink Project c474 E5DA STIR Citywide Pedestrian Crossing Enhancements i026 E7DC STIR Citywide Protected/Permissive Traffic Signal Conversion i015 E6AB STIR Edmonds Street Waterfront Connector c478 E5DB STIR Hwy 99 Enhancements (Phase III) c405 E2AD STIR Hwy 99 Gateway Revitalization s014 E6AA STIR Minor Sidewalk Program i017 E6DD STIR Sunset Walkway Improvements c354 E1 DA STIR Trackside Warning System c470 E5AA STIR 220th Adaptive i028 E8AB SWR 2016 Sanitary Sewer Replacement Projects c469 E5GA SWR 2017 Sanitary Sewer Replacement Project i013 E6GA SWR 2018 Sewerline Overlays i035 E8CE SWR 2018 Sewerline Replacement Project c492 E6GC SWR 2019 Sewerline Replacement Project c516 E8GA SWR Citywide CIPP Sewer Rehab Phase I c456 E4GB SWR Citywide CIPP Sewer Rehab Phase II c488 E6GB SWR Lake Ballinger Trunk Sewer Study sol l E5GB SWR Lift Station #1 Basin & Flow Study c461 E4GC UTILITIES 2019 Utility Rate & GFC Update s02o E8JB UTILITIES Standard Details Updates solo E5NA UTILITIES Utility Rate Update s013 E6JA WTR 2017 Waterline Replacement Projects i014 E6JB WTR 2018 Waterline Overlays i034 E8CD WTR 2018 Waterline Replacement Project c493 E6JC WTR 2019 Swedish Waterline Replacement c523 E8JA WTR 2019 Waterline Overlay i043 E9CB WTR 2019 Waterline Replacement c498 E7JA WTR Dayton St. Utility Replacement Project (3rd Ave to 9th Ave) c482 E5J13 WTR Five Corners Reservoir Re -coating c473 E51KA WWTP Sewer Outfall Groundwater Monitoring c446 E4HA WWTP WWTP Outfall Pipe Modifications c481 E5HA Revised 7/18/2019 Packet Pg. 61 6.3.d Payroll Earnings Summary Report City of Edmonds Pay Period: 959 (07/10/2019 to 07/12/2019) Hour Type Hour Class Description Hours 400 MISCELLANEOUS MISC PAY 0.00 600 RETROACTIVE PAY RETROACTIVE PAY 0.00 M IO Total Net Pay: Amount 1,228.51 159,559.40 $160,787.91 $119,798.54 07/18/2019 Packet Pg. 62 6.3.e Payroll Earnings Summary Report City of Edmonds Pay Period: 925 (07/01/2019 to 07/15/2019) c Hour Type Hour Class Description Hours Amount -ed2 REGULAR HOURS Educational Pav Correction 0.00 -156.28 111 ABSENT NO PAY LEAVE 80.00 0.00 112 ABSENT NO PAY NON HIRED 79.00 0.00 121 SICK SICK LEAVE 552.50 20,580.57 122 VACATION VACATION 1,786.50 75,306.76 123 HOLIDAY HOLIDAY HOURS 216.00 8,847.14 124 HOLIDAY FLOATER HOLIDAY 49.00 1,519.75 125 COMP HOURS COMPENSATORY TIME 217.00 8,367.14 130 COMP HOURS Holidav Compensation Used 17.00 650.08 150 REGULAR HOURS Kelly Dav Used 84.00 3,413.75 152 COMP HOURS COMPTIME BUY BACK 51.75 1,900.61 155 COMP HOURS COMPTIME AUTO PAY 183.67 8,605.68 157 SICK SICK LEAVE PAYOFF 60.32 2,276.41 158 VACATION VACATION PAYOFF 200.84 7,579.64 160 VACATION MANAGEMENT LEAVE 35.00 2,194.55 190 REGULAR HOURS REGULAR HOURS 15,557.25 593,878.07 196 REGULAR HOURS LIGHT DUTY 88.00 4,021.50 205 OVERTIME HOURS OVERTIME .5 55.00 987.50 210 OVERTIME HOURS OVERTIME -STRAIGHT 147.25 6,779.94 215 OVERTIME HOURS WATER WATCH STANDBY 48.00 2,660.28 216 MISCELLANEOUS STANDBY TREATMENT PLANT 15.00 1,313.17 220 OVERTIME HOURS OVERTIME 1.5 368.33 24,500.10 225 OVERTIME HOURS OVERTIME -DOUBLE 27.00 1,908.82 410 MISCELLANEOUS WORKING OUT OF CLASS 0.00 201.05 411 SHIFT DIFFERENTIAL SHIFT DIFFERENTIAL 0.00 1,327.63 600 RETROACTIVE PAY RETROACTIVE PAY 0.00 347.18 601 COMP HOURS ACCRUED COMP .5 1.50 0.00 602 COMP HOURS ACCRUED COMP 1.0 207.13 0.00 603 COMP HOURS Holidav Comp 1.0 9.00 0.00 604 COMP HOURS ACCRUED COMP TIME 1.5 137.25 0.00 606 COMP HOURS ACCRUED COMP 2.0 15.75 0.00 901 SICK ACCRUED SICK LEAVE -19.78 0.00 acc MISCELLANEOUS ACCREDITATION PAY 0.00 78.66 07/18/2019 Packet Pg. 63 6.3.e Payroll Earnings Summary Report City of Edmonds Pay Period: 925 (07/01/2019 to 07/15/2019) c Hour Type Hour Class Description Hours Amount acp MISCELLANEOUS Accreditation 1 % Part Time 0.00 9.67 acs MISCELLANEOUS ACCRED/POLICE SUPPORT 0.00 172.00 boc MISCELLANEOUS BOC II Certification 0.00 91.74 colre MISCELLANEOUS Collision Reconstruction ist 0.00 74.14 cpl MISCELLANEOUS TRAINING CORPORAL 0.00 160.86 crt MISCELLANEOUS CERTIFICATION III PAY 0.00 564.90 det MISCELLANEOUS DETECTIVE PAY 0.00 111.20 det4 MISCELLANEOUS Detective 4% 0.00 914.78 ed1 EDUCATION PAY EDUCATION PAY 2% 0.00 649.78 ed2 EDUCATION PAY EDUCATION PAY 4% 0.00 837.62 ed3 EDUCATION PAY EDUCATION PAY 6% 0.00 4,829.25 fmla ABSENT FAMILY MEDICAL/NON PAID 8.00 0.00 hol HOLIDAY HOLIDAY 1,265.70 48,942.37 k9 MISCELLANEOUS K-9 PAY 0.00 217.06 Iq1 LONGEVITY LONGEVITY PAY 2% 0.00 830.64 Ig10 LONGEVITY LONGEVITY 5.5% 0.00 148.17 Ig11 LONGEVITY LONGEVITY PAY 2.5% 0.00 967.31 Ig12 LONGEVITY Lonqevitv 9% 0.00 5,360.94 Ig13 LONGEVITY Lonqevitv 7% 0.00 1,747.35 Ig14 LONGEVITY Lonqevitv 5% 0.00 1,121.25 Ig15 LONGEVITY LONGEVITY 7.5% 0.00 381.68 I0 LONGEVITY Lonqevitv 1 % 0.00 376.59 Iq5 LONGEVITY Lonqevitv 3% 0.00 444.80 Ici6 LONGEVITY Lonqevitv .5% 0.00 290.37 Iq7 LONGEVITY Lonqevitv 1.5% 0.00 518.30 Iq9 LONGEVITY Lonqevitv 3.5% 0.00 104.93 mels SICK Medical Leave Sick 80.00 2,887.19 mtc MISCELLANEOUS MOTORCYCLE PAY 0.00 222.40 pols SICK Preqnancv Disablitv Sick 21.62 711.86 poly VACATION Preqnancv Disablitv Vacation 18.38 605.18 nds MISCELLANEOUS Public Disclosure Specialist 0.00 101.78 phv MISCELLANEOUS PHYSICAL FITNESS PAY 0.00 2,081.80 prof MISCELLANEOUS PROFESSIONAL STANDARDS ; 0.00 173.48 07/18/2019 Packet Pg. 64 6.3.e Hour Type Hour Class sdp MISCELLANEOUS sqt MISCELLANEOUS sro MISCELLANEOUS str MISCELLANEOUS traf MISCELLANEOUS Payroll Earnings Summary Report City of Edmonds Pay Period: 925 (07/01/2019 to 07/15/2019) Description Hours Amount SPECIAL DUTY PAY 0.00 620.67 ADMINISTRATIVE SERGEANT 0.00 173.48 School Resource Officer 0.00 111.20 STREET CRIMES 0.00 462.88 TRAFFIC 0.00 111.20 21,662.96 $857,220.52 Total Net Pay: $578,299.65 07/18/2019 Packet Pg. 65 6.3.f Benefit Checks Summary Report City of Edmonds Pay Period: 925 - 07/01/2019 to 07/15/2019 Bank: usbank - US Bank Check # Date Payee # Name Check Amt Direct Deposit 63871 07/19/2019 epoa2 EPOA-POLICE 5,439.00 0.00 63872 07/19/2019 epoa3 EPOA-POLICE SUPPORT 681.64 0.00 63873 07/19/2019 flex NAVIA BENEFIT SOLUTIONS 2,003.74 0.00 63874 07/19/2019 teams TEAMSTERS LOCAL 763 4,811.50 0.00 63875 07/19/2019 icma VANTAGE TRANSFER AGENTS 304884 4,589.56 0.00 17,525.44 0.00 Bank: wire - US BANK Check # Date Payee # Name Check Amt Direct Deposit 2904 07/19/2019 us US BANK 127,871.89 0.00 2905 07/19/2019 mebt WTRISC FBO #N3177B1 125,156.31 0.00 2907 07/19/2019 awc AWC 314,514.44 0.00 2911 07/19/2019 wadc WASHINGTON STATE TREASURER 27,657.62 0.00 2913 07/19/2019 pb NATIONWIDE RETIREMENT SOLUTION 6,372.32 0.00 2914 07/19/2019 oe OFFICE OF SUPPORT ENFORCEMENT 1,138.50 0.00 602,711.08 0.00 Grand Totals: 620,236.52 0.00 rn Lh r; 0 a� c m 0 L CD E V Q 7/18/2019 Packet Pg. 66 6.4 City Council Agenda Item Meeting Date: 07/23/2019 Acknowledgment of Claim for Damages Staff Lead: WCIA Claims Department: City Clerk's Office Preparer: Nicholas Falk Background/History n/a Staff Recommendation Acknowledge receipt of Claims for Damages by minute entry. Narrative Mark & Joan Foltz submitted a claim for damages in the amount of $495.45. Attachments: CFD - Mark Joan Foltz Packet Pg. 67 6.4.a CITY OF EDMONDS RECEIVED CLAIM FOR DAMAGES FORM Daft Claim F Please take note that Mark- ( 3-0o_n T.te' T-_O 1+-z- , who currently resides at mailing address g I 14 "° !S-r 'SW Gl L7210 home phone #41 2:5- 0-1- work phone # N beli , and who at the time of the occurrence and whose date of birth is is claiming damages against i Ui>1ia U S in the sum of $ 44 9 5- L4 S arising out of the following circumstances listed below. DATE OF OCCURRENCE' L.D - ZC71 a1 TIME. 0-. a},- `� �7 O ,� try a� LOCATION OF OCCURRENCE: g % k 5 1 '� 2_QJR 157_W _ E DESCRIPTION: 1. Describe the copduct and circumstance that brought about the ►.a o-t• L1- U�M U 4 r ,, l-OLA + 4 RAJ. -Cr O v ae'� -k fa0 J .— C�� aCt�L Yla , SLLcA n A S � j<_rLn_rw t +�'L]•c.V�C�aI Cf--� iNA� ajv,,.�A on t1Li1d e! �- Yi,esf ilv s L[ J "ry, C_ %f'� 'S. c� L 0 or damage. Also describe the injury or dam ag E c 1 C N "'T a al attach an a sheet far ad itional info ation, if needed �w� Q K&AL., UA 3 l names, addresses, and phone numbm. 0 c ' a N O LL 3. Attach copies of ail documentaWn relating t0 expenses, injuries, losses, and/or estimates For repair. c� 0 4. Have you submitted a claim for damages to your insurance company? Yes No Y L If so, please provide the name of the insurance company: and the policy #: ' License Plate # Type Auto: * * ADDITIONAL I N FORMATION REQUIRED FOR AUTOMOBILE CLAIMS ONLY * * Driver License # (year) (make) (model) DRIVER: OVMER: Address: Address_ Phone#: PhorEe#: Passengers: Name: Name: Address: Address: U Form Revised 051W14 Page I [rf 2 Packet Pg. 68 6.4.a ` " NOTE: THIS FORM MUST BE SIGNED AND NOTARIZED * * being first duly swam, depose and say that I am the claimant for the above described; that I have read the above claim, know the contents thereof and believe the same to be true. I further acknowledge that any information I provide as part of this claim may be considered a public record and may be ubjeet to disdiosure pursuant to RCW 42.56. y�/ y x �r� x 5igna re of Claimant(s) State of Washington County of : "1 i certify that I know or have satisfactory evidence that �0� J-7Z is the person who appeared before me. and said person acknowledged that (helshe) signed this instrument and acknowledged it to be (his/her) free and voluntary act for the uses and purposes mentioned in the instrument. n ture1r- �77650''trjo �'f,����► 00 �1 Title r U . ...►.w -� i My appointment expires: L �• 0� N 0� 2 PliBV% C,` OF WA�'�� ►■LAA Please present the completed claim form to: Form Revised 05/W14 City Clerk's Office City of Edmonds 121 5"' Avenue North Edmonds, WA, 98020 8:00 a.m. to 4.30 p.m. Page 2 of 2 a� a� `0 E .2 U 0 a� a� a� 0 a N 0 u_ c c� 0 Packet Pg. 69 6.5 City Council Agenda Item Meeting Date: 07/23/2019 May 2019 Monthly Financial Report Staff Lead: Dave Turley Department: Administrative Services Preparer: Dave Turley Background/History N/A Staff Recommendation N/A Narrative May 2019 Monthly Financial Report Attachments: May 2019 Monthly Financial Report Packet Pg. 70 I 6.5.a I OF EDP � d 1)7 C. 1 $9v CITY OF EDMONDS MONTHLY BUDGETARY FINANCIAL REPORT MAY 2019 Packet Pg. 71 1 I 6.5.a I Page 1 of 1 C ITY O F IDMO NDS REVENUES BY FUND - SUMMARY Fund 2019 Amended 5/31/2018 5/31/2019 Amount No. Title Budget Revenues Revenues Remaining %Receives 001 GENERAL FUND $ 40,866,194 $18,167,955 $ 18,888,974 $21,977,220 46 009 LEOFF-MEDICAL INS. RESERVE 437,980 3,622 - 437,980 0 011 RISK MANAGEMENT FUND 012 CONTINGENCY RESERVE FUND 014 HISTORIC PRESERVATION GIFT FUND 017 MARSH RESTORATION & PRESERVATION FUND 018 EDMONDS HOMELESSNESS RESPONSE FUND 019 EDMONDS OPIOID RESPONSE FUND 104 DRUG ENFORCEMENT FUND 111 STREET FUND 112 COMBINED STREET CONST/IMPROVE 1 117 MUNICIPAL ARTS ACQUIS. FUND 118 MEMORIAL STREET TREE 120 HOTEL/MOTEL TAX REVENUE FUND 121 EMPLOYEE PARKING PERMIT FUND 122 YOUTH SCHOLARSHIP FUND 123 TOURISM PROMOTIONAL FUND/ARTS 125 REAL ESTATE EXCISE TAX 2 2 126 REAL ESTATE EXCISE TAXI, PARKS ACQ FUND 2 127 GIFTS CATALOG FUND 130 CEMETERY MAINTENANCE/IMPROVEMT 136 PARKSTRUST FUND 137 CEMETERY MAINTENANCE TRUST FD 138 SISTER CITY COMMISSION 140 BUSINESS IMPROVEMENT DISTRICT 211 L.LD. FUND CONTROL 231 2012 LT GO DEBT SERVICE FUND 332 PARKS CAPITAL CONSTRUCTION FUND 411 COMBINED UTILITY OPERATION 421 WATER UTILITY FUND 3 422 STORM UTILITY FUND 3 423 SEWER/WWTP UTILITY FUND 4 424 BOND RESERVE FUND 511 EQUIPMENT RENTAL FUND 512 TECHNOLOGY RENTAL FUND 617 FIREMEN'S PENSION FUND 28,210 9,662 - 28,210 0 182,400 58,255 - 182,400 0 5,230 79 - 5,230 0 556,800 6,850 5,187 551,613 1 - - 0 r- O - - 0 G. 165,430 40,268 6,552 158,878 4 N 1,859,270 642,922 583,040 1,276,230 C 7,139,933 2,021,818 852,686 6,287,247 12 C 150,910 14,811 21,841 129,069 14 11 21 580 193 284 296 49 s 94,730 28,843 34,220 60,510 36 = O 26,170 10,408 11,580 14,590 44 2 1,680 254 222 1,458 13 p N 31,250 15,501 10,875 20,375 35 O 1,597,600 784,759 531,700 1,065,900 33 1,604,020 789,919 538,228 1,065,792 34 O 88,100 46,144 87,605 495 99 d 182,560 55,856 69,554 113,006 38 4,870 1,669 2,387 2,483 49 t� 44,500 15,871 22,277 22,223 50 m C 10,240 80 3,627 6,613 35 IL - 53,849 54,735 (54,735) 0 z 12,400 - 18,732 (6,332) 151 r O 716,420 37,096 33,796 682,624 5 2,885,649 116,298 55,104 2,830,545 2 r O - 63,325 61,876 (61,876) 0 N 10,473,626 3,547,449 3,697,457 6,776,169 35 5,461,148 2,087,253 2,420,017 3,041,131 44 14,386,296 4,812,749 5,673,816 8,712,480 39 d 1,995,280 3 6 1,995,274 0 s 1,763,760 713,120 757,757 1,006,003 43 r Q 1,101,798 530,370 460,609 641,189 42 72,040 47,982 51,283 20,757 71 $ 93,947,074 $ 34,725,230 $ 34,956,027 $ 58,991,047 37' 9 Differences primarily due to prior year Grant Billings 2 Differences primarily due to a $418,216 deposit in total for Real Estate Excise Taxin March 2018 from the State. 3 Differences primarily due to a 9%increase in water, a 10%increase in storm, and a 1.45%decrease in water tax. 4 Differences due to contributed capital billings to WWTP partnersin 2019, as well as 9.5%increase in sewer. 1 Packet Pg. 72 1 I 6.5.a I Page 1 of 1 CITY OF EDMO NDS EXPENDITURES BY FUND - SUMMARY Fund 2019 Amended 5/31/2018 5/31/2019 Amount No. Title Budget Expenditures Expenditures Remaining %Spent 001 GENERAL FUND $ 45,296,523 $ 16,471,112 $ 17,357,697 $ 27,938,826 380/ 009 LEOFF-MEDICAL INS. RESERVE 466,920 179,808 194,831 272,089 420/ 014 HISTORIC PRESERVATION GIFT FUND 5,400 - 5,533 (133) 1020/ 018 EDMONDS HOMELESSNESS RESPONSE FUND - 1,862 (1,862) 00/ 019 EDMONDS OPIOID RESPONSE FUND 200,000 - - 200,000 00/ 104 DRUG ENFORCEMENT FUND 45,800 52,464 - 45,800 00/ 111 STREET FUND 2,252,028 775,400 885,710 1,366,318 390/ O 112 COMBINED STREET CONST/IMPROVE 6,892,395 1,093,086 357,857 6,534,538 501 117 MUNICIPAL ARTS ACQUIS. FUND 181,880 15,346 12,377 169,503 70/ 120 HOTEL/MOTEL TAX REVENUE FUND 100,400 15,215 32,655 67,745 330/ 'V C 121 EMPLOYEE PARKING PERMIT FUND 26,880 - - 26,880 00/ 122 YOUTH SCHOLARSHIP FUND 3,000 731 1,452 1,548 480/ LL 123 TOURISM PROMOTIONAL FUND/ARTS 32,000 4,070 4,991 27,009 160/ z 125 REAL ESTATE EXCISE TAX 2 126 REAL ESTATE EXCISE TAX 1, PARKS ACQ FUND 127 GIFT S CATALOG FUND 130 CEMETERY MAINTENANCE/IMPROVEMT 136 PARKS TRUST FUND 138 SISTER CITY COMMISSION 140 BUSINESS IMPROVEMENT DISTRICT 5 211 L.I.D. FUND CONTROL 231 2012 LT GO DEBT SERVICE FUND 332 PARKS CAPITAL CONSTRUCTION FUND 421 WATER UTILITY FUND 422 STORM UTILITY FUND 423 SEWER/WWTP UTILITY FUND 424 BOND RESERVE FUND 511 EQUIPMENT RENTAL FUND 512 TECHNOLOGY RENTAL FUND 617 FIREMEN'S PENSION FUND 3,373,286 247,565 443,339 2,929,947 130/ p 3,872,301 253,992 464,648 3,407,653 120/ CD 99,754 425 26,732 73,022 270/ N 194,707 85,932 76,974 117,733 400/ 5,000 - 4,935 65 990/ ? 10,500 385 513 9,987 501 - 34,142 28,557 (28,557) 00/ 0 12,400 - - 12,400 00/ 716,410 - - 716,410 00/ 3,997,428 51,123 26,992 3,970,436 10/ 12,938,995 3,003,200 3,638,901 9,300,094 280/ L+ 10,018,035 1,222,424 1,558,015 8,460,020 16°/ r C 17,721,484 3,100,053 3,525,760 14,195,724 200/ 0 1,991,210 - - 1,991,210 00/ CD 2,933,431 537,615 768,157 2,165,274 260/ N 1,179,911 487,412 415,102 764,809 35'/ 78,627 33,124 33,524 45,103 430/ w $ 114,646,705 $ 27,664,623 $ 29,867,115 $ 84,779,590 260/ N E t t� O r r Q 5 Business Improvement District is not included in the City Budget; activity is here for reporting purposes only. 2 Packet Pg. 73 6.5.a Page 1 of 3 CITY OF EDMO NDS REVENUES - GENERAL FUND 2019 Amended 5/31/2018 5/31/2019 Amount Title Budget Revenues Revenues Remaining % Received TAXIES: 1 REAL PERSONAL / PROPERTY TAX $ 10,548,203 $ 5,545,470 $ 5,585,317 $ 4,962,886 530/( 2 EMSPROPERTYTAX 4,044,220 2,125,346 2,159,562 1,884,658 530/( 3 VOTED PROPERTY TAX 500 3,138 (218) 718 -440/( 4 LOCAL RETAIL SALESiUSE TAX 6 7,825,000 3,194,085 3,384,424 4,440,576 430/( 5 NATURAL GAS USE TAX 8,100 1,573 5,730 2,370 710/c 6 1/10 SALES TAX LOCAL CRIM JUST 779,500 308,359 320,521 458,979 410/( 7 ELECTRIC UTILITY TAX 1,691,300 864,247 864,392 826,908 510/c 8 GASUTILITYTAX 626,600 383,162 350,940 275,660 560/( 9 SOLID WASTE UTILITY TAX 350,900 147,901 142,358 208,542 410/( 10 WAT ER UT ILIT Y T AX 1,211,800 449,414 436,942 774,858 360/( 11 SEWERUTILITYTAX 840,900 325,481 353,288 487,612 420/( 12 STORMWATER UTILITY TAX 446,300 174,490 192,449 253,851 430/( 13 T.V. CABLE UTILITY TAX 862,100 341,932 331,695 530,405 380/( 14 TELEPHONE UTILITY TAX 967,200 430,977 358,213 608,987 370/( 15 PULLTABSTAX 53,500 26,597 29,282 24,219 5501( 16 AMUSEMENT GAMES 40 - - 40 00/( 17 LEASEHOLD EXCISE TAX 251,900 68,005 76,543 175,357 300/( 30,508,063 14,390,175 14,591,439 15,916,624 480/( LIC INS ES AND PERMITS: 18 FIRE PERMITS -SPECIAL USE 250 155 60 190 240/( 19 POLICE - FINGERPRINTING 450 340 250 200 560/( 20 AMUSEMENTS 6,330 5,950 4,675 1,655 740/( 21 VENDING MACHINE/CONCESSION 50,000 1,379 1,689 48,311 3°/ 22 FRANCHISE AGREEMENT-COMCAST 713,500 345,926 336,861 376,639 470/( 23 FRANCHISE FEE-EDUCATION/GOVERNMENT 41,200 17,409 17,350 23,850 420/( 24 FRANCHISE AGREEMENT -VERIZON/FRONT IER 106,900 54,471 49,632 57,268 460/( 25 FRANCHISE AGREEMENT -BLACKROCK 14,000 7,220 - 14,000 00/( 26 OLYMPIC VIEW WATER DISTRICT FRANCHISE 325,100 165,070 77,912 247,188 240/( 27 GENERAL BUSINESS LICENSE 122,200 70,309 60,930 61,270 5001( 28 DEV SERV PERMIT SURCHARGE 63,400 33,890 27,955 35,445 440/( 29 NON-RESIDENT BUS LICENSE 75,900 39,300 38,150 37,750 5001( 30 RIGHT OF WAY FRANCHISE FEE 15,000 50,816 13,460 1,540 900/( 31 BUILDING ST RUCT URE PERMITS 703,600 280,003 202,649 500,951 290/( 32 ANIMAL LICENSES 27,500 9,416 7,361 20,139 270/( 33 STREET AND CURB PERMIT 50,000 24,521 20,248 29,752 400/( 34 OTR NON -BUS LIC/PERMITS 18,500 8,698 9,094 9,406 490/( 2,333,830 1,114,873 868,276 1,465,554 370/( INTERGOVERNMENTAL: 35 DOI 15-0404-0-1-754 - BULLET PROOF VEST 6,006 - 3,470 2,536 580/( 36 NCHIP GRANT 14,616 - - 14,616 00/( 37 WA ASSOC OF SHERIFF'S TRAFFIC GRANT 2,285 - 2,285 - 1000/( 38 TARGET ZERO TEAMS GRANT 4,000 1,760 1,436 2,564 360/( 39 HIGH VISIBILITY ENFORCEMENT 7,100 4,050 - 7,100 00/c 40 STATE GRANTS- BUDGET ONLY 18,000 - - 18,000 00/( 41 PUD PRIVILEDGE TAX 199,500 - - 199,500 00/( 42 DOCKSIDE DRILLS GRANT REIMBURSE - 1,455 2,805 (2,805) 00/( 43 WA STATE TRAFFIC COMM GRANT - 3,623 - - 00/( 44 SHORELINE MASTER PROGRAM DOE - - 6,453 (6,453) 00/c 45 MVET/SPECIAL DISTRIBUTION 13,800 5,847 6,100 7,700 440/( 46 TRIAL COURT IMPROVEMENT 16,716 8,861 8,594 8,122 5101( 47 CRIMINAL JUSTICE -SPECIAL PROGRAMS 45,600 21,184 22,004 23,596 48% 48 MARIJUANA EXCISE TAX DISTRIBUTION 45,000 30,559 15,049 29,951 330/( 49 DUI - CITIES 6,000 3,050 3,041 2,959 5101( 50 LIQUOR EXCISE TAX 215,000 104,405 114,594 100,406 530/( 51 LIQUOR BOARD PROFITS 342,000 85,480 85,246 256,754 250/c 52 INTERLOCAL GRANTS - 25,000 - - 00/( 53 VERDANT INTERLOCAL GRANTS - 5,810 - - 00/( 54 FIRST RESPONDERS FLEX FUND - 524 705 (705) 00/( 935,623 301,609 271,781 663,842 290/( w Q 6 2019 Local Retail Sales/Use Tax revenues are $190,339 higher than 2018 revenues. Please also seepages pages 18 & 19. 3 Packet Pg. 74 1 Title CHARGES FOR GOODS AND SERVICES: 1 RECORD/LEGAL INSTRUMENTS 2 ATM SURCHARGE FEES 3 CREDIT CARD FEES 4 COURT RECORD SERVICES 5 D/M COURT REC SER 6 WARRANT PREPARATION FEE 7 IT TIME PAY FEE 8 MUNIC.-DIST. COURT CURR EXPEN 9 SALE MAPS & BOOKS 10 CLERKS TIME FOR SALE OF PARKING PERMITS 11 BID SUPPLIES REIMBURSEMENT 12 PHOTOCOPIES 13 POLICE DISCLOSURE REQUESTS 14 ENGINEERING FEES AND CHARGES 15 ELECTION CANDIDATE FILINGFEES 16 SNO-ISLE 17 PASSPORTS AND NATURALIZATION FEES 18 POLICE SERVICES SPECIAL EVENTS 19 CAMPUS SAFETY-EDM. SCH. DIST. 20 WOODWAY-LAW PROTECTION 21 MISCELLANEOUS POLICE SERVICES 22 FIRE DISTRICT #1 STATION BILLINGS 23 LEGAL SERVICES 24 FIRE PROTECTION & EMS FOR DUI 25 ADULT PROBATION SERVICE CHARGE 26 BOOKING FEES 27 FIRE CONSTRUCTION INSPECTION FEES 28 EMERGENCY SERVICE FEES 29 EMS TRANSPORT USER FEE 30 FLEX FUEL PAYMENTS FROM STATIONS 31 ANIMAL CONTROL SHELTER 32 ZONING/SUBDIVISION FEE 33 PLAN CHECKING FEES 34 FIRE PLAN CHECK FEES 35 PLANNING 1% INSPECTION FEE 36 S.E.P.A. REVIEW 37 CRITICAL AREA STUDY 38 DV COORDINATOR SERVICES 39 GYM AND WEIGHTROOM FEES 40 PROGRAM FEES 41 TAXABLE RECREATION ACTIVITIES 42 WINTER MARKET REGISTRATION FEES 43 BIRD FEST REGISTRATION FEES 44 INTERFUND REIMBURSEMENT -CONTRACT SVCS 6.5.a Page 2 of 3 CITY OF EDMO NDS REVENUES - GENERAL FUND 2019 Amended 5/31/2018 5/31/2019 Amount Budget Revenues Revenues Remaining %Received 3,000 3,015 676 2,324 230/( 400 88 62 339 150 10,000 5,656 5,729 4,271 570/( - 33 72 (72) 00/( 300 70 30 270 100/( 5,500 2,226 5,445 55 990 1,000 422 591 409 590/( 100 34 86 15 860/( 100 14 32 68 320/( 25,100 - - 25,100 0°/ 600 - - 600 00/c 1,000 274 349 651 350 500 69 - 500 00/c 200,000 71,702 72,032 127,968 360 - 1,486 - - 00/c 78,000 46,854 46,479 31,521 600 21,000 9,565 11,405 9,595 540/( 30,000 - - 30,000 0°/ 125,550 - 36,562 88,988 290/( 193,067 24,488 115,333 77,734 600/( 1,500 - 2 1,498 00/( 50,000 30,336 30,727 19,273 610/( - 181 997 (997) 00/( - - 117 (117) 0°/ 54,000 23,137 18,327 35,673 340/( 400 642 1,404 (1,004) 3510/( 12,560 7,415 7,860 4,700 630/( 3,000 1,036 3,047 (47) 1020/( 852,100 503,256 246,163 605,937 290/( 2,500 1,421 629 1,871 250/( 50 - 100 (50) 2000/( 102,300 76,692 52,705 49,595 520/( 425,900 154,726 282,160 143,740 660/( 6,500 4,480 4,265 2,235 660/( 1,000 420 - 1,000 00/( 5,000 4,690 3,850 1,150 770/( 14,000 8,750 7,675 6,325 5501( 2,046 5,051 4,707 (2,661) 2300/( 13,000 6,821 5,610 7,390 430/( 910,740 472,220 453,779 456,961 5001( 1,300 235 552 748 420/( 5,000 - - 5,000 0°/ 1,000 - - 1,000 00/( 2,624,792 403,646 1,190,266 1,434,526 450/( 5,783,905 1,871,150 2,609,823 3,174,082 450/( r Q 4 Packet Pg. 75 1 6.5.a Page 3 of 3 CITY OF EDMO NDS REVENUES - GENERAL FUND 2019 Amended 5/31/2018 5/31/2019 Amount Title Budget Revenues Revenues Remaining %Received FINES AND PENALTIES: 1 PROOF OF VEHICLE INS PENALTY 2 TRAFFIC INFRACTION PENALTIES 3 NC TRAFFIC INFRACTION 4 CRT COST FEE CODE LEG ASSESSMENT (LGA) 5 NON -TRAFFIC INFRACTION PENALTIES 6 OTHERINFRACTIONS'04 7 PARKING INFRACTION PENALTIES 8 PARK/INDDISZONE 9 DWI PENALTIES 10 DUI - DP ACCT 11 CRIM CNV FEE DUI 12 DUI - DP FEE 13 OTHER CRIMINAL TRAF MISDEM PEN 14 CRIMINAL TRAFFIC MISDEMEANOR 8/03 15 CRIMINAL CONVICTION FEE CT 16 CRIM CONV FEE CT 17 OTHER NON-T RAF MISDEMEANOR PEN 18 OTHER NON TRAFFIC MISD. 8/03 19 COURT DV PENALTY ASSESSMENT 20 CRIMINAL CONVICTION FEE CN 21 CRIM CONV FEE CN 22 PUBLIC DEFENSE RECOUPMENT 23 BANK CHARGE FOR CONY. DEFENDANT 24 COURT COST RECOUPMENT 25 BUS. LICENSE PERMIT PENALTY 26 MISC FINES AND PENALTIES MISCELLANEOUS: 27 INVESTMENT INTEREST 28 INTEREST ON COUNTY TAXES 29 INTEREST - COURT COLLECTIONS 30 PARKING 31 SPACE/FACILITIESRENTALS 32 BRACKET ROOM RENTAL 33 LEASESLONG-TERM 34 DONATION/CONTRIBUTION 35 PARKSDONATIONS 36 BIRD FEST CONTRIBUTIONS 37 POLICE CONTRIBUTIONS FROM PRIV SOURCES 38 SALE OF JUNK/SALVAGE 39 SALES OF UNCLAIM PROPERTY 40 CONFISCATED AND FORFEITED PROPERTY 41 OTHER JUDGEMENT/SETTLEMENT 42 POLICE JUDGMENT SIRESTITUTION 43 CASHIERS OVERAGES/S'HORTAGES 44 OTHER MISC REVENUES 45 SMALL OVERPAYMENT 46 NSF FEES - PARKS & REC 47 NSF FEES - MUNICIPAL COURT 48 NSF FEES -POLICE 49 US BANK REBATE TRANSFERS -IN: 50 TRANSFER FROM FUND 127 TOTAL GENERAL FUND REVENUE 7,500 3,525 1,599 5,901 210/( 290,000 120,119 103,678 186,322 360/c 31,000 14,376 8,538 22,462 280/( 38,000 16,074 7,952 30,048 210/( 1,000 3,300 1,371 (371) 1370/( 800 350 512 288 640/( 159,000 65,100 62,659 96,341 390/( 800 418 1,358 (558) 1700/( 6,000 2,958 3,455 2,545 580/( 1,000 408 232 768 230/( 200 38 44 156 220/( 1,500 464 924 576 620/( 135 96 - 135 00/( 30,000 11,883 14,841 15,159 490/( 3,600 1,431 1,263 2,337 350/( 1,000 431 300 700 300/( 100 - (2,792) 2,892 -27920/( 13,000 5,312 6,004 6,996 460/( 600 316 133 467 220/( 1,600 786 397 1,203 250/( 500 219 187 313 370/( 18,500 8,389 5,595 12,905 300/( 12,000 5,024 6,273 5,727 520/( 7,000 3,274 2,077 4,923 300/( 10,000 9,610 5,150 4,850 520/( 300 - 995 (695) 3320/( 635,135 273,900 232,745 402,390 370% 248,160 58,911 153,002 95,158 620/( 9,210 7,107 12,319 (3,109) 1340/( 3,000 4,124 3,832 (832) 1280/( 3,949 - - 00/c 153,000 43,046 34,625 118,375 230/( 5,000 1,220 1,210 3,790 240/( 185,000 82,578 85,148 99,852 460/( 7,000 1,281 3,473 3,527 500/( 4,350 2,880 350 4,000 80/( 1,500 1,230 750 750 5001( 9,768 - 7,618 2,150 780/( 300 58 68 232 230/( 3,000 1,613 1,361 1,639 450/( 2,000 180 - 2,000 0°/ 2,000 - 3 1,997 00/( 200 50 379 (179) 1900/( - (60) (152) 152 0°/ 2,000 2,345 7,310 (5,310) 3650/( 30 35 40 (10) 1350/( 20 - - 20 00/( 300 86 83 217 280/( - 30 - - 00/( 7,500 5,585 3,491 4,009 470/( 643,338 216,248 314,909 328,429 495% 26,300 - - 26,300 0°/ 26,300 - - 26,300 007, $ 40,866,194 $ 18,167,955 $ 18,888,974 $ 21,977,220 460% 5 Packet Pg. 76 6.5.a Page 1 of 6 CITY OF EDMONDS EXPENDITURES BY FUND - DETAIL 2019 Amended 5/31/2018 5/31/2019 Amount Title Budget Expenditures Expenditures Remaining %Spent GENERAL FUND EXPENDITURES (001) 1 SALARIES AND WAGES $ 16,416,248 $ 5,944,379 $ 6,344,568 $ 10,071,680 390i 2 OVERTIME 488,380 265,532 328,326 160,054 670/ 3 HOLIDAY BUY BACK 250,491 2,416 4,704 245,787 20/ 4 BENEFITS 6,106,801 2,341,867 2,544,410 3,562,391 420i 5 UNIFORMS 90,475 36,666 53,464 37,011 590i 6 SUPPLIES 376,780 154,409 215,134 161,646 570/ 7 SMALL EQUIPMENT 219,379 34,723 88,205 131,174 400i 8 PROFESSIONAL SERVICES 7 14,984,721 942,626 5,696,903 9,287,818 380/ 9 COMMUNICATIONS 157,435 54,413 59,743 97,692 380/ 10 TRAVEL 66,280 17,054 33,322 32,958 500/ 11 EXCISE TAXES 6,500 1,156 1,012 5,488 160i 12 RENTAL/LEASE 1,842,569 818,306 776,344 1,066,225 420/ 13 INSURANCE 431,095 437,253 436,448 (5,353) 1010i 14 UTILITIES 460,625 191,169 206,279 254,346 450i 15 REPAIRS&MAINTENANCE 584,030 129,323 272,389 311,641 470i 16 MISCELLANEOUS 561,304 194,014 218,159 343,145 390i 17 INTERGOVERNMENTAL SERVICES 7 - 4,530,231 - - 00/ 18 INTERGOVERNMENTAL PAYMENTS 75,000 305,715 75,000 - 1000i 19 INTERFUND SUBSIDIES 1,953,108 - - 1,953,108 00/ 20 MACHINERY/EQUIPMENT 27,042 59,284 - 27,042 00/ 21 GENERAL OBLIGATION BOND PRINCIPAL 183,710 - - 183,710 00/ 22 OTHER INTEREST & DEBT SERVICE COSTS 500 - - 500 00/ 23 INTEREST ON LONG TERM EXTERNAL DEBT 14,050 10,576 3,288 10,762 230i 45,296,523 16,471,112 17,357,697 27,938,826 38 LEO FF-MEDICAL INS. RESERVE (009) 24 BENEFITS $ 206,650 $ 81,536 $ 78,436 $ 128,214 380i 25 PENSION AND DISABILITY PAYMENTS 252,990 94,272 115,760 137,230 460i 26 PROFESSIONAL SERVICES 7,000 3,600 180 6,820 30/ 27 MISCELLANEOUS 280 400 455 (175) 1630/ 466,920 179,808 194,83 272,089 429 HISTORIC PRESERVATION GIFT FUND (014) 28 SUPPLIES $ 100 $ $ - $ 100 00/ 29 PROFESSIONAL SERVICES 200 - 200 00/ 30 MISCELLANEOUS 5,100 5,533 (433) 1080i 5,400 5,533 $ (133) 1029 EDMONDS HOMELESSNESS RESPONSEFUND (018) 31 PROFESSIONAL SERVICES $ - $ $ 1,862 $ (1,862) 00/ - 1,862 (1,862) 0°/ EDMONDS OPIOED RESPONSEFUND (019) 32 INTERFUND SUBSIDIES $ 200,000 $ $ - $ 200,000 0° 200,000 - 200,000 00/ DRUG INFO RC EMENT FUND (104) 33 PROFESSIONAL SERVICES $ 45,000 $ $ - $ 45,000 00/ 34 REPAIR/MAINT 800 - 800 00/ 35 INTERGOVERNMENTAL SERVICES - 52,464 - - 00/ 45,800 52,464 - 45,800 0°i r Q 7 The difference for "intergovernmental services" and "professional services" is due to a change in BARS coding. 6 Packet Pg. 77 I 6.5.a I Page 2 of 6 C ITY O F EDMO NDS EXPENDITURES BY FUND - DETAIL 2019 Amended 5/31/2018 5/31/2019 Amount Title Budget Expenditures Expenditures Remaining %Spent S TREET FUND (111) 1 SALARIES AND WAGES $ 795,977 $ 206,492 $ 223,075 $ 572,902 280/ 2 OVERTIME 35,900 11,427 28,666 7,234 800/ 3 BENEFITS 264,125 106,460 108,608 155,517 410/ 4 UNIFORMS 6,000 3,136 3,278 2,722 5501 5 SUPPLIES 335,000 97,653 129,247 205,753 390/ 6 SMALL EQUIPMENT 20,000 375 1,008 18,992 501 7 PROFESSIONAL SERVICES 26,140 4,649 6,081 20,059 230/ 8 COMMUNICATIONS 4,500 2,616 3,033 1,467 670/ 9 TRAVEL 1,000 - - 1,000 00/ 10 RENTAL/LEASE 268,280 77,344 111,091 157,189 410/ 11 INSURANCE 153,881 156,645 156,514 (2,633) 1020/ 12 UTILITIES 276,605 96,412 99,686 176,919 360/ 13 REPAIRS&MAINTENANCE 52,000 11,038 14,444 37,556 280/ 14 MISCELLANEOUS 8,000 829 979 7,021 120/ 15 GENERAL OBLIGATION BOND PRINCIPAL 4,040 - - 4,040 00/ 16INTEREST 580 322 - 580 00/ $ 2,252,028 $ 775,400 $ 885,710 $ 1,366,318 390/ COMBINED STREETC0NST/IMPROVE(112) 17 SALARIES AND WAGES 18 BENEFITS 19 PROFESSIONAL SERVICES 20 REPAIRS & MAINTENANCE 21 INTERFUND SUBSIDIES 22 LAND 23 CONSTRUCTION PROJECTS 24 INTERGOVERNMENTAL LOANS 25 INTEREST MUNICIPAL ARTS ACQUIS. FUND (117) 26 SUPPLIES 27 SMALL EQUIPMENT 28 PROFESSIONAL SERVICES 29 TRAVEL 30 RENTAL/LEASE 31 REPAIRS & MAINTENANCE 32 MISCELLANEOUS HOTEL/MOTEL, TAX REVENUE FUND (120) 33 PROFESSIONAL SERVICES 34 MISCELLANEOUS 35 INTERFUND SUBSIDIES EMPLOYEE PARKING PERMIT FUND (121) 36 SUPPLIES 37 PROFESSIONAL SERVICES YOUTH SCHOLARSHIP FUND (122) 38 MISCELLANEOUS TOURISM PROMOTIONAL FUND/ARTS (123) 39 PROFESSIONAL SERVICES 40 MISCELLANEOUS $ - $ 2,577 $ - $ - 00/ 961 2,100 - 961 00/ 3,893,563 4,024 156,782 3,736,781 40/ 1,138,238 - 6,405 1,131,833 10/ 47,710 - 47,710 00/ 38,500 - - 38,500 00/ 1,698,873 1,009,510 120,155 1,578,718 70/ 72,220 72,201 72,201 19 1000/ 2,330 2,674 2,313 17 990/ $ 6,892,395 $ 1,093,086 $ 357,857 $ 6,534,538 50/ $ 4,700 $ 56 $ 521 $ 4,179 110/ 1,700 - - 1,700 00/ 166,500 13,553 9,159 157,341 60/ 80 9 6 74 80/ 2,000 - - 2,000 00/ 300 - - 300 00/ 6,600 1,728 2,691 3,909 410/ $ 181,880 $ 15,346 $ 12,377 $ 169,503 70/ $ 95,400 $ 15,215 $ 32,072 $ 63,328 340/ 1,000 - 583 417 580/ 4,000 - - 4,000 00/ $ 100,400 $ 15,215 $ 32,655 $ 67,745 33°/ $ 1,790 $ $ - $ 1,790 00/ 25,090 - 25,090 00/ $ 26,880 $ $ - $ 26,880 00/ $ 3,000 $ 731 $ 1,452 $ 1,548 480/ $ 3,000 $ 731 $ 1,452 $ 1,548 480/ $ 28,500 $ 4,070 $ 4,715 $ 23,785 170/ 3,500 - 276 3,224 80/ $ 32,000 $ 4,070 $ 4,991 $ 27,009 160/ Q 7 Packet Pg. 78 I 6.5.a I Page 3 of 6 C ITY O F EDMO NDS EXPENDITURES BY FUND - DETAIL 2019 Amended 5/31/2018 5/31/2019 Amount Title Budget Expenditures Expenditures Remaining %Spent REAL ES TATE EXC IS E TAX 2 (125) 1 SUPPLIES $ 21,000 $ 29,777 $ 37,189 $ (16,189) 1770i 2 PROFESSIONAL SERVICES 586,505 26,981 93,279 493,226 160i 3 RENTAL/LEASE - - 381 (381) 00/ 4 REPAIRS &MAINTENANCE 591,156 15,834 575,322 30i 5 LAND 100,000 - - 100,000 00/ 6 CONSTRUCTION PROJECTS 2,074,625 190,806 296,657 1,777,968 140/ $ 3,373,286 $ 247,565 $ 443,339 $ 2,929,947 130/ REAL ESTATE EXCISE TAX I, PARKS ACQ (126) 7 PROFESSIONAL SERVICES 8 REPAIRS & MAINTENANCE 9 MISCELLANEOUS 10 INTERFUND SUBSIDIES 11 LAND 12 CONSTRUCTION PROJECTS 13 GENERAL OBLIGATION BONDS 14 INTEREST GIFTS CATALOG FUND (127) 15 SUPPLIES 16 SMALL EQUIPMENT 17 PROFESSIONAL SERVICES 18 REPAIRS & MAINTENANCE 19 MISCELLANEOUS 20 INTERFUND SUBSIDIES C EVIEIERY MAINTINANC F/IMPRO VEMEVT (130) 21 SALARIES AND WAGES 22 OVERTIME 23 BENEFITS 24 UNIFORMS 25 SUPPLIES 26 SUPPLIES PURCHASED FOR INVENTORY/RESALE 27 SMALL EQUIPMENT 28 PROFESSIONAL SERVICES 29 COMMUNICATIONS 30 TRAVEL 31 RENTAL/LEASE 32 UTILITIES 33 REPAIRS & MAINTENANCE 34 MISCELLANEOUS PARKS TRUSTFUND (136) 35 SMALL EQUIPMENT 36 INTERFUND SUBSIDIES SISTER CITY COMMISSION (138) 37 SUPPLIES 38 TRAVEL 39 MISCELLANEOUS BUSINESS IMPROVEM NTDISTRICTFUND (140) 40 SUPPLIES 41 PROFESSIONAL SERVICES 42 MISCELLANEOUS LID FUND CONTROL (211) 43 INTERFUND SUBSIDIES 2012 LTGO DEBT SERVIC FUND (231) 44 GENERAL OBLIGATION BOND 45 INTEREST $ 204,650 $ 32,198 $ 57,751 146,899 280/ 658,879 - 23,409 635,470 40i .-. - 216,720 - - 00/ t 133,030 - - 133,030 00/ Q 100,000 - - 100,000 00/ a) 2,749,902 3,201 383,488 2,365,415 140i 23,480 - - 23,480 00/ to 3,360 1,873 - 3,360 00/ $ 3,872,301 $ 253,992 $ 464,648 $ 3,407,653 12°i $ 39,779 $ 270 $ 24,301 $ 15,478 LL 610i 15,325 - 574 14,751 40i t 6,500 - 6,500 00/ _ 11,250 - 1,858 9,392 170/ O 600 154 - 600 00/ 26,300 - - 26,300 00/ $ 99,754 $ 425 $ 26,732 $ 73,022 270/ N A $ 93,593 $ 32,259 $ 35,846 $ 57,747 380i 3,500 1,692 2,360 1,140 670/ 38,909 14,537 16,789 22,120 430/ t 1,000 225 775 230i Q 7,000 14,975 597 6,403 90/ 20,000 12,802 7,085 12,915 350� - 1,246 (1,246) 00/ 2 4,200 852 566 3,634 130i 1,410 652 790 620 560/ 500 - 500 0°/ LL 6,260 4,850 2,608 3,652 420/ A 3,835 1,663 1,619 2,216 420i z 500 - 500 00/ C 14,000 1,649 7,242 6,758 520/ O $ 194,707 $ 85,932 $ 76,974 $ 117,733 407/ $ 5,000 $ $ 4,935 $ 65 990/ N 0°/ $ 5,000 $ $ 4,935 $ 65 990/ w $ 1,500 $ 27 $ - $ 1,500 00/ 4,500 - 4,500 00/ E 4,500 357 513 3,987 110i v $ 10,500 $ 385 $ 513 $ 9,987 5 r w Q $ - $ 1,001 $ 4,748 $ (4,748) 00/ 29,400 22,859 (22,859) 00/ 3,741 950 (950) 00/ 34,142 28,557 (28,557) 00/ $ 12,400 $ $ - $ 12,400 00/ $ 12,400 $ $ - $ 12,400 00/ $ 609,630 $ $ - $ 609,630 00/ 106,780 - 106,780 00/ $ 716,410 $ $ - $ 716,410 00/ 8 Packet Pg. 79 6.5.a Page 4 of 6 CITY OF EDMO NDS EXPENDITURES BY FUND - DETAIL 2019 Amended 5/31/2018 5/31/2019 Amount Title Budget Expenditures Expenditures Remaining %Spent PARKS CONSTRUCTION FUND (332) 1 PROFESSIONAL SERVICES $ 4,760 $ - $ 10,365 $ (5,605) 2180 2 CONSTRUCTION PROJECTS 3,992,668 51,123 16,627 3,976,041 04 $ 3,997,428 $ 51,123 $ 26,992 $ 3,970,436 10 WATER FUND (421) 3 SALARIES AND WAGES $ 845,003 $ 300,831 $ 324,895 $ 520,108 380 4 OVERTIME 24,000 8,903 10,345 13,655 430 5 BENEFITS 371,025 147,439 152,680 218,345 410 6 UNIFORMS 4,000 2,703 1,678 2,322 420 7 SUPPLIES 150,000 35,413 26,658 123,342 180 8 FUEL CONSUMED - 70 - - 00 9 WATER PURCHASED FOR RESALE 1,950,000 566,259 585,365 1,364,635 300 10 SUPPLIES PURCHASED FOR INVENTORY/RESALE 170,000 35,430 32,277 137,723 190 11 SMALL EQUIPMENT 11,000 1,473 4,856 6,144 440 12 PROFESSIONAL SERVICES 878,372 134,669 356,114 522,258 410 13 COMMUNICATIONS 30,000 10,443 10,826 19,174 360 14 TRAVEL 200 - - 200 00 15 EXCISE TAXES 8 1,649,700 161,462 608,494 1,041,206 370 16 RENTAL/LEASE 155,532 59,701 63,837 91,695 410 17 INSURANCE 54,423 56,738 55,096 (673) 1010 18 UTILITIES 35,310 11,007 12,220 23,090 350 19 REPAIRS& MAINTENANCE 1,603,100 14,571 14,364 1,588,736 14 20 MISCELLANEOUS 121,400 50,336 52,011 69,389 430 21 INTERGOVERNMENTAL SERVICES - 10,960 - - 04 22 INTERFUND TAXES 8 - 449,414 - 00 23 INTERFUND SUBSIDIES 646,370 - 646,370 04 24 MACHINERY/EQUIPMENT 15,000 - - 15,000 04 25 CONSTRUCTION PROJECTS 3,614,690 918,419 1,300,570 2,314,120 360 26 GENERAL OBLIGATION BONDS 2,710 - - 2,710 00 27 REVENUE BONDS 355,740 - - 355,740 00 28 INTERGOVERNMENTAL LOANS 25,840 25,839 25,839 1 1000 29 INTEREST 225,580 1,120 775 224,805 04 $ 12,938,995 $ 3,003,200 $ 3,638,901 $ 9,300,094 280 STORM FUND (422) 30 SALARIES AND WAGES $ 702,584 $ 272,018 $ 291,497 $ 411,087 410 31 OVERTIME 29,000 3,472 27,971 1,029 960 32 BENEFITS 360,829 138,442 152,606 208,223 420 33 UNIFORMS 6,500 4,629 4,844 1,656 750 34 SUPPLIES 46,000 14,660 16,095 29,905 350 35 SMALL EQUIPMENT 4,000 74 3,653 347 910 36 PROFESSIONAL SERVICES 1,711,075 101,379 446,476 1,264,599 260 37 COMMUNICATIONS 3,200 1,691 2,303 897 720 38 TRAVEL 4,300 840 - 4,300 00 39 EXCISE TAXES 8 470,100 27,886 223,079 247,021 470 40 RENTAL/LEASE 246,404 102,595 101,678 144,726 410 41 INSURANCE 125,390 178,798 127,548 (2,158) 1020 42 UTILITES 10,710 4,560 5,211 5,499 490 43 REPAIR & MAINTENANCE 439,568 9,703 10,053 429,515 24 44 MISCELLANEOUS 113,100 43,764 71,333 41,767 630 45 INTERGOVERNMENTAL SERVICES - 49,898 - - 00 46 INTERFUND TAXES AND OPERATING ASSESSMENT 8 - 174,490 - 04 47 INTERFUND SUBSIDIES 297,750 - - 297,750 00 48 CONSTRUCTION PROJECTS 4,987,891 52,451 40,642 4,947,249 14 49 GENERAL OBLIGATION BONDS 98,900 - - 98,900 04 50 REVENUE BONDS 173,940 - - 173,940 04 51 INTERGOVERNMENTAL LOANS 55,639 32,063 32,063 23,577 580 52 INTEREST 131,155 9,012 962 130,193 14 $ 10,018,035 $ 1,222,424 $ 1,558,015 $ 8,460,020 160 Q 8 The difference for "interfund taxes" and "excise taxes" is due to a change in BARS coding. 9 Packet Pg. 80 1 I 6.5.a I Page 5 of 6 CITY O F EDMO NDS EXPENDITURES BY FUND - DETAIL 2019 Amended 5/31/2018 5/31/2019 Amount Title Budget Expenditures Expenditures Remaining %Spent SEWER FUND (423) 1 SALARIES AND WAGES $ 1,850,763 $ 688,728 $ 739,698 $ 1,111,065 400 2 OVERTIME 95,000 37,554 43,632 51,368 460 3 BENEFITS 815,177 311,245 316,750 498,427 390 4 UNIFORMS 9,500 5,271 4,924 4,576 520 5 SUPPLIES 417,200 95,379 120,816 296,384 290 6 FUEL CONSUMED 80,000 22,852 8,382 71,618 100 7 SUPPLIES PURCHASED FOR INV OR RESALE 4,000 - - 4,000 00 8 SMALL EQUIPMENT 50,000 18,003 8,005 41,995 160 9 PROFESSIONAL SERVICES 1,599,670 303,030 504,223 1,095,447 320 10 COMMUNICATIONS 43,000 16,566 16,499 26,501 380 11 TRAVEL 5,000 2,122 - 5,000 09 12 EXCISE TAXES 9 973,000 93,489 455,956 517,044 470 13 RENTAL/LEASE 313,469 128,241 144,084 169,385 460 14 INSURANCE 184,261 117,717 184,604 (343) 1000 15 UTILITIES 1,231,310 265,830 579,682 651,628 470 16 REPAIR & MAINTENANCE 695,000 146,160 103,982 591,018 150 17 MISCELLANEOUS 125,650 41,698 39,415 86,235 310 18 INTERGOVERNMENTAL SERVICES - 39,804 - - 00 19 INTERFUND TAXESAND OPERATING ASSESSMENT 9 20 INTERFUND SUBSIDIES 21 MACHINERY/EQUIPMENT 22 CONSTRUCTION PROJECTS 23 GENERAL OBLIGATION BONDS 24 REVENUE BONDS 25 INTERGOVERNMENTAL LOANS 26 INTEREST 27 OTHER INTEREST & DEBT SERVICE COSTS BOND RESERVE FUND (424) 28 REVENUE BONDS 29 INTEREST - 325,481 - 04 2,420,671 - 2,420,671 09 30,000 47,057 - 30,000 04 6,300,393 215,698 87,246 6,213,147 14 150,050 - - 150,050 00 80,340 - - 80,340 00 172,540 157,665 157,991 14,549 920 75,490 17,779 7,328 68,162 100 - 2,683 2,543 (2,543) 00 $ 17,721,484 $ 3,100,053 $ 3,525,760 $ 14,195,724 - $ 740,010 $ $ $ 740,010 04 1,251,200 1,251,200 00 $ 1,991,210 $ $ $ 1,991,210 05 r Q 9 The difference for "interfund taxes" and "excise taxes" is due to a change in BARS coding. 10 Packet Pg. 81 I 6.5.a I Page 6 of 6 C ITY O F EDMO NDS EXPENDITURES BY FUND - DETAIL 2019 Amended 5/31/2018 5/31/2019 Amount Title Budget Expenditures Expenditures Remaining %Spent E:Q UIPMENT RENTAL FUND (511) 1 SALARIES AND WAGES $ 259,309 $ 103,530 $ 108,683 $ 150,626 424 2 OVERTIME 2,000 - 8,081 (6,081) 4044 3 BENEFITS 113,207 44,650 47,835 65,372 424 4 UNIFORMS 1,000 749 1,029 (29) 1030 5 SUPPLIES 110,000 28,864 54,851 55,149 504 6 FUEL CONSUMED 1,000 - - 1,000 04 7 SUPPLIES PURCHASED FOR INVENTORY/RESALE 273,000 61,228 63,764 209,236 230 8 SMALL EQUIPMENT 58,000 1,416 1,689 56,311 34 9 PROFESSIONAL SERVICES 46,580 2,296 617 45,963 14 10 COMMUNICATIONS 3,000 865 968 2,032 320 11 TRAVEL 1,000 233 162 838 164 12 RENTAL/LEASE 14,120 3,934 5,713 8,407 404 13 INSURANCE 32,015 29,464 30,167 1,848 940 14 UTILITIES 14,200 6,537 7,333 6,867 524 15 REPAIRS & MAINTENANCE 60,000 13,600 9,494 50,506 164 16 MISCELLANEOUS 12,000 4,975 4,916 7,084 410 17 MACHINERY/EQUIPMENT 1,933,000 235,274 422,855 1,510,145 224 $ 2,933,431 $ 537,615 $ 768,157 $ 2,165,274 264 TECHNOLOGY RENTAL FUND (512) 18 SALARIES AND WAGES $ 292,502 $ 116,387 $ 117,996 $ 174,506 404 19 OVERTIME 2,000 1,148 60 1,940 34 20 BENEFITS 97,499 38,910 40,451 57,048 414 21 SUPPLIES 5,000 1,609 1,556 3,444 314 22 SMALL EQUIPMENT 38,000 84,389 28,343 9,657 754 23 PROFESSIONAL SERVICES 210,000 72,838 5,647 204,353 34 24 COMMUNICATIONS 58,770 17,238 18,486 40,284 314 25 TRAVEL 1,500 412 353 1,147 244 26 RENTAL/LEASE 7,200 1,907 2,069 5,131 294 27 REPAIRS& MAINTENANCE 387,690 119,772 141,611 246,079 374 28 MISCELLANEOUS 5,000 7,772 959 4,041 194 29 MACHINERY/EQUIPMENT 74,750 25,030 57,571 17,179 774 $ 1,179,911 $ 487,412 $ 415,102 $ 764,809 354 FIRIMEN'S PENSION FUND (617) 30 BENEFITS $ 23,000 $ 11,130 $ 9,933 $ 13,067 434 31 PENSION AND DISABILITY PAYMENTS 54,427 21,454 23,591 30,836 434 32 PROFESSIONAL SERVICES 1,200 540 - 1,200 04 $ 78,627 $ 33,124 $ 33,524 $ 45,103 434 TOTAL EXPENDITURE ALL FUNDS $ 114,646,705 $ 27,664,623 $ 29,867,115 $ 84,779,590 264 r Q 11 Packet Pg. 82 6.5.a Page 1 of 1 C ITY O F EDMO NDS EXPENDITURES - GENERAL FUND - BY DEPARTMENT IN SUMMARY 2019 Amended 5/31/2018 5/31/2019 Amount Title Budget Expenditures Expenditures Remaining %Spent CITY COUNCIL OFFICE OF MAYOR HUMAN RESOURCES MUNICIPAL COURT CITY CLERK FINANCE CITY ATTORNEY NON -DEPARTMENTAL POLICE SERVICES COMMUNITY SERVICESIECONOMIC DEV DEVELOPMENT SERVICES PARKS& RECREATION PUBLIC WORKS FACILITIES MAINTENANCE Title $ 602,387 $ 148,289 $ 158,489 $ 443,898 26% 296,155 120,989 123,018 173,137 42% 590,331 175,117 194,001 396,330 33% 1,143,210 413,053 410,401 732,809 36% 685,420 277,663 291,090 394,330 42% 1,244,805 467,718 515,266 729,539 41% C 889,560 342,708 366,531 523,029 41% y 13,556,979 5,479,175 5,383,743 8,173,236 40% 11,728,919 4,507,241 4,729,460 6,999,459 40% R 618,232 227,250 232,851 385,381 38% LL 3,426,322 1,046,070 1,154,831 2,271,491 34% 2' s 4,303,374 1,462,933 1,554,647 2,748,727 36% C 3,296,100 1,097,973 1,288,664 2,007,436 39% 0) 2,914,729 704,933 954,705 1,960,024 33% o N $ 45,296,523 $ 16,471,112 $ 17,357,697 $ 27,938,826 38% O C. O CITY OF EDMO NDS EXPENDITURES - UTILITY- BY FUND IN SUMMARY C 2019 Amended 5/31/2018 5/31/2019 Amount LL Budget Expenditures Expenditures Remaining %Spent s WATER UTILITY FUND $ 12,938,995 $ 3,003,200 $ 3,638,901 $ 9,300,094 28% r STORM UTILITY FUND 10,018,035 1,222,424 1,558,015 8,460,020 O n 16% C) SEWER/WWTP UTILITY FUND 17,721,484 3,100,053 3,525,760 14,195,724 N 20% BOND RESERVE FUND 1,991,210 - - 1,991,210 0% A $ 42,669,724 $ 7,325,676 $ 8,722,677 $ 33,947,047 20% C N E t t� O r r Q 12 Packet Pg. 83 Page 1 of 4 C ITY O F EDMO NDS EXPENDITURES - GENERAL FUND - BY DEPARTMENT IN DEr'AIL Title 2019 Amended Budget 5/31/2018 Expenditures 5/31/2019 Expenditures Amount Remaining %Spent CITY COUNCIL SALARIES $ 171,950 $ 66,384 $ 74,024 $ 97,926 43% OVERTIME 1,000 - - 1,000 0% BENEFITS 92,751 38,339 40,418 52,333 44% SUPPLIES 2,000 765 679 1,321 34% SMALL EQUIPMENT - 15,089 342 (342) 0% PROFESSIONAL SERVICES 194,160 16,139 29,041 165,119 15% COMMUNICATIONS 3,000 1,200 2,764 236 92% TRAVEL 6,700 325 1,353 5,347 20% RENTAL/LEASE 11,586 6,790 5,108 6,478 44% REPAIRS/MAINTENANCE 500 - 121 379 24% MISCELLANEOUS 118,740 3,257 4,637 114,103 4% $ 602,387 $ 148,289 $ 158,489 $ 443,898 26% OFFICEOFMAYOR SALARIES $ 215,076 $ 87,463 $ 89,971 $ 125,105 42% BENEFITS 53,257 20,820 22,403 30,854 42% SUPPLIES 1,500 167 357 1,143 24% PROFESSIONAL SERVICES 3,000 165 1,600 1,400 53% COMMUNICATION 1,400 836 456 944 33% TRAVEL 3,000 260 1,862 1,138 62% RENTAL/LEASE 13,472 8,740 5,224 8,248 39% MISCELLANEOUS 5,450 2,538 1,144 4,306 21% $ 296,155 $ 120,989 $ 123,018 $ 173,137 42% HUMAN RESOURCES SALARIES $ 327,939 $ 95,540 $ 104,815 $ 223,124 32% BENEFITS 118,229 36,346 40,518 77,711 34% SUPPLIES 12,300 606 2,058 10,242 17% SMALL EQUIPMENT 300 - - 300 0% PROFESSIONAL SERVICES 81,886 20,319 14,603 67,283 18% COMMUNICATIONS 700 409 507 193 72% TRAVEL 1,000 899 309 691 31% RENTAL/LEASE 22,947 11,247 10,345 12,602 45% REPAIR/MAINTENANCE 7,850 7,326 7,571 279 96% MISCELLANEOUS 17,180 2,426 13,274 3,906 77% $ 590,331 $ 175,117 $ 194,001 $ 396,330 33% MUNIC IPAL C O URT SALARIES $ 628,961 $ 236,774 $ 247,215 $ 381,746 39% OVERTIME 800 - 367 433 46% BENEFITS 244,601 94,177 81,139 163,462 33% SUPPLIES 10,600 4,676 1,471 9,129 14% SMALL EQUIPMENT 1,000 - 2,125 (1,125) 213% PROFESSIONAL SERVICES 124,925 32,296 36,792 88,133 29% COMMUNICATIONS 3,550 923 1,195 2,355 34% TRAVEL 6,500 1,806 1,432 5,068 22% RENTAL/LEASE 65,251 30,172 26,823 38,428 41% REPAIR/MAINTENANCE 4,880 - 277 4,603 6% MISCELLANEOUS 25,100 12,229 11,564 13,536 46% MACHINERY/EQUIPMENT 27,042 - - 27,042 0% $ 1,143,210 $ 413,053 $ 410,401 $ 732,809 36% t O CL 2 C R C LL 21 s C O 2 CD 6 N R O C. d <0 C O C iL s r C O O N A C N t c� O r r Q 13 Packet Pg. 84 1 I 6.5.a I Page 2 of 4 C ITY O F EDMO NDS EXPENDITURES - GENERAL FUND - BY DEPARTMENT IN DETAIL 2019 Amended 5/31/2018 5/31/2019 Amount Title Budget Expenditures Expenditures Remaining %Spent CITY C LERK SALARIES AND WAGES $ 358,349 $ 142,226 $ 146,118 $ 212,231 41% BENEFITS 151,468 62,813 64,736 86,732 43% SUPPLIES 10,240 1,819 1,090 9,150 11% PROFESSIONAL SERVICES 32,310 9,109 9,680 22,630 30% COMMUNICATIONS 40,000 12,328 11,824 28,176 30% TRAVEL 2,000 437 465 1,535 23% RENTAL/LEASE 50,973 26,106 21,018 29,955 41% REPAIRS & MAINTENANCE 32,080 19,851 31,619 461 99% MISCELLANEOUS 8,000 2,976 4,539 3,461 57% $ 685,420 $ 277,663 $ 291,090 $ 394,330 42% FINANCE SALARIES $ 844,384 $ 300,563 $ 332,732 $ 511,652 39% OVERTIME 4,500 146 - 4,500 0% BENEFITS 268,345 96,431 112,492 155,853 42% SUPPLIES 7,350 1,261 2,449 4,901 33% SMALL EQUIPMENT 5,400 3,831 579 4,821 11% PROFESSIONAL SERVICES 14,650 5 29 14,621 0% COMMUNICATIONS 2,000 449 557 1,443 28% TRAVEL 3,100 1,469 814 2,286 26% RENTAL/LEASE 48,226 20,451 20,696 27,530 43% REPAIRIMAINTENANCE 38,500 41,121 42,499 (3,999) 110% MISCELLANEOUS 8,350 1,992 2,420 5,930 29% $ 1,244,805 $ 467,718 $ 515,266 $ 729,539 41% CITY ATTORNEY PROFESSIONAL SERVICES $ 889,560 $ 342,708 $ 366,531 $ 523,029 41% $ 889,560 $ 342,708 $ 366,531 $ 523,029 41% NON -DEPARTMENTAL SALARIES $ 101,750 $ - $ - $ 101,750 0% BENEFITS -UNEMPLOYMENT 40,000 8,709 22,812 17,188 57% SUPPLIES 5,000 712 2,209 2,791 44% PROFESSIONAL SERVICES 10,666,114 175,436 4,787,981 5,878,133 45% EXCISE TAXES 6,500 1,156 1,012 5,488 16% RENTAL/LEASE 10,538 4,650 5,397 5,141 51% INSURANCE 431,095 437,253 436,448 (5,353) 101% MISCELLANEOUS 69,614 48,610 49,596 20,018 71% INTERGOVT SERVICES - 4,486,359 - - 0% ECA LOAN PAYMENT 75,000 305,715 75,000 - 100% INTERFUND SUBSIDIES 1,953,108 - - 1,953,108 0% GENERAL OBLIGATION BOND 183,710 - - 183,710 0% INTEREST ON LONG-TERM DEBT 14,050 10,576 3,288 10,762 23% FISCAL AGENT FEES 500 500 0% $ 13,556,979 $ 5,479,175 $ 5,383,743 $ 8,173,236 40% r Q 14 Packet Pg. 85 Page 3 of 4 C ITY O F EDMO NDS EXPENDITURES - GENERAL FUND - BY DEPARTMENT IN DETAIL 2019 Amended 5/31/2018 5/31/2019 Amount Title Budget Expenditures Expenditures Remaining %Spent PO LIC E S ERVIC FS SALARIES $ 6,916,238 $ 2,574,815 $ 2,655,092 $ 4,261,146 38% OVERTIME 454,780 245,894 306,167 148,613 67% HOLIDAY BUYBACK 250,491 2,416 4,704 245,787 2% BENEFITS 2,549,180 1,025,789 1,085,351 1,463,829 43% UNIFORMS 80,250 31,593 45,543 34,707 57% SUPPLIES 86,500 36,185 55,807 30,694 65% SMALL EQUIPMENT 191,079 11,934 78,721 112,358 41% PROFESSIONAL SERVICES 141,770 46,366 56,500 85,270 40% COMMUNICATIONS 32,000 13,996 18,404 13,596 58% TRAVEL 29,310 8,325 15,257 14,053 52% RENTAL/LEASE 920,851 408,587 381,835 539,016 41% REPAIR/MAINTENANCE 15,120 4,873 3,512 11,608 23% MISCELLANEOUS 61,350 37,184 22,567 38,783 37% MACHINERY/EQUIPMENT 59,284 0% $ 11,728,919 $ 4,507,241 $ 4,729,460 $ 6,999,459 40% COMMUNITY S ERVIC ES /EC 0 N DEV. SALARIES $ 245,505 $ 98,228 $ 103,929 $ 141,576 42% BENEFITS 76,033 30,906 32,840 43,193 43% SUPPLIES 7,000 5,934 5,886 1,114 84% SMALL EQUIPMENT 800 - - 800 0% PROFESSIONAL SERVICES 262,400 82,786 81,358 181,042 31% COMMUNICATIONS 1,490 425 634 856 43% TRAVEL 2,000 746 - 2,000 0% RENTAL/LEASE 13,004 5,087 4,758 8,247 37% REPAIR/MAINTENANCE 500 - - 500 0% MISCELLANEOUS 9,500 3,138 3,446 6,054 36% $ 618,232 $ 227,250 $ 232,851 $ 385,381 38% DEVELO PMIIVT SERVIC ES/PLANNING SALARIES $ 1,665,849 $ 604,950 $ 655,887 $ 1,009,962 39% OVERTIME 1,300 10,020 4,877 (3,577) 375% BENEFITS 609,831 229,333 253,746 356,085 42% UNIFORMS 500 - - 500 0% SUPPLIES 17,100 3,890 3,817 13,283 22% SMALL EQUIPMENT 6,100 1,051 624 5,476 10% PROFESSIONAL SERVICES 907,046 114,436 147,164 759,882 16% COMMUNICATIONS 9,000 2,827 3,888 5,112 43% TRAVEL 5,500 2,543 7,274 (1,774) 132% RENTAL/LEASE 143,236 64,835 59,412 83,824 41% REPAIRS & MAINTENANCE 6,800 - 596 6,204 9% MISCELLANEOUS 54,060 12,186 17,545 36,515 32% $ 3,426,322 $ 1,046,070 $ 1,154,831 $ 2,271,491 34% ENGINEERING SALARIES $ 1,720,176 $ 558,332 $ 691,852 $ 1,028,324 40% OVERTIME 8,300 3,872 2,550 5,750 31% BENEFITS 678,356 232,325 288,665 389,691 43% UNIFORMS 450 - - 450 0% SMALL EQUIPMENT 2,200 - - 2,200 0% PROFESSIONAL SERVICES 53,840 9,181 1,104 52,736 2% COMMUNICATIONS 16,625 4,431 6,832 9,793 41% TRAVEL 600 89 585 15 98% RENTAL/LEASE 123,023 48,930 50,709 72,314 41% REPAIR/MAINTENANCE 2,600 - - 2,600 0% MISCELLANEOUS 79,450 30,449 42,753 36,697 54% $ 2,685,620 $ 887,608 $ 1,085,050 $ 1,600,570 40% w Q 15 Packet Pg. 86 Page 4 of 4 C ITY O F EDMO NDS EXPENDITURES - GENERAL FUND - BY DEPARINNffiVT IN DETAIL, 2019 Amended 5/31/2018 5/31/2019 Amount Title Budget Expenditures Expenditures Remaining %Spent PARKS & REC REATIO N SALARIES $ 2,096,118 $ 758,188 $ 807,159 $ 1,288,959 39% OVERTIME 10,000 3,098 10,084 (84) 101% BENEFITS 785,394 294,800 314,929 470,466 40% UNIFORMS 6,275 1,643 4,297 1,978 68% SUPPLIES 121,590 56,976 54,145 67,445 45% SMALL EQUIPMENT 8,500 1,569 2,298 6,202 27% PROFESSIONAL SERVICES 671,920 91,034 102,586 569,334 15% COMMUNICATIONS 30,320 9,756 3,656 26,664 12% TRAVEL 5,070 156 2,836 2,234 56% RENTAL/LEASE 268,539 105,019 124,748 143,791 46% PUBLIC UTILITY 175,338 58,958 68,358 106,980 39% REPAIR/MAINTENANCE 29,700 882 17,084 12,616 58% MISCELLANEOUS 94,610 36,982 42,468 52,142 45% INTERGOVERNMENTAL SERVICES 43,872 0% $ 4,303,374 $ 1,462,933 $ 1,554,647 $ 2,748,727 36% PUBLIC WORKS SALARIES $ 369,334 $ 114,989 $ 117,567 $ 251,767 32% OVERTIME 200 - 144 56 72% BENEFITS 129,196 42,160 42,500 86,696 33% SUPPLIES 8,600 1,229 2,220 6,380 26% SMALL EQUIPMENT 1,000 - 857 143 86% PROFESSIONAL SERVICES 200 38 36 164 18% COMMUNICATIONS 1,350 246 318 1,032 24% TRAVEL 500 - 1,133 (633) 227% RENTAL/LEASE 91,193 50,486 37,467 53,726 41% PUBLIC UTILITY 3,007 1,200 1,371 1,636 46% REPAIR/MAINTENANCE 1,000 - - 1,000 0% MISCELLANEOUS 4,900 17 4,900 0% $ 610,480 $ 210,364 $ 203,614 $ 406,866 33% FACILITIES MAINTENANCE SALARIES 754,619 305,928 318,207 436,412 42% OVERTIME 7,500 2,502 4,137 3,363 55% BENEFITS 310,160 128,919 141,860 168,300 46% UNIFORMS 3,000 3,431 3,624 (624) 121% SUPPLIES 87,000 40,189 82,945 4,055 95% SMALL EQUIPMENT 3,000 1,249 2,658 342 89% PROFESSIONAL SERVICES 940,940 2,608 61,896 879,044 7% COMMUNICATIONS 16,000 6,589 8,708 7,292 54% TRAVEL 1,000 - - 1,000 0% RENTAL/LEASE 59,730 27,208 22,804 36,926 38% PUBLIC UTILITY 282,280 131,011 136,550 145,730 48% REPAIR/MAINTENANCE 444,500 55,269 169,110 275,390 38% MISCELLANEOUS 5,000 30 2,206 2,794 44% $ 2,914,729 $ 704,933 $ 954,705 $ 1,960,024 33% TOTAL GENERAL FUND EXPENDITURES $ 45,296,523 $ 16,471,112 $ 17,357,697 $ 27,938,826 38% r Q 16 Packet Pg. 87 I 6.5.a I City of Edmonds, WA Monthly Revenue Summary -General Fund 2019 General Fund Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance % January $ 2,054,678 $ 2,054,678 $ 2,397,678 16.69% February 4,942,857 2,888,179 4,685,465 -5.21% March 7,411,396 2,468,539 7,046,230 -4.93% April 10,819,777 3,408,381 10,236,291 -5.39% May 18,632,994 7,813,217 18,888,974 1.37% June 20,936,841 2,303,847 July 23,072,511 2,135,670 August 25,590,721 2,518,210 September 27,737,323 2,146,602 October 30,605,048 2,867,725 November 38,576,248 7,971,200 December 40,866,194 2,289,946 City of Edmonds, WA Monthly Revenue Summary -Real Estate Excise Tax 2019 Real Estate Excise Tax 1 & 2 Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January $ 239,174 $ 239,174 $ 206,702 -13.58% February 426,584 187,410 316,468 -25.81% March 648,598 222,013 530,155 -18.26% April 866,924 218,326 723,280 -16.57% May 1,118,366 251,442 997,047 -10.85% June 1,392,391 274,025 July 1,790,060 397,669 August 2,111,970 321,910 September 2,410,481 298,511 October 2,651,152 240,672 November 2,897,726 246,573 December 3,080,000 182,274 *The monthly budget forecast columns are based on a five-year average. 17 Packet Pg. 88 1 SALES TAX SUMMARY I 6.5.a I Accornmodation, $14,766 Clothing and Accessories, $114,037 Communications, $91,450 Sales Tax Analysis By Category Current Period: May 2019 Year -to -Date Total $3,384,424 Health &Personal Care, Automotive Repair, $g3,267 $108,934 Amusement & Construction Trade, Recreation, $36,966 $597,572 Business Services, $325,729 Gasoline, $13,935 Retail Food Stores, $126,857 Wholesale Trade,—/ -1% $80,877 Misc Retail, $530,959 10,000,000 8,000,000 $5,840,764 6,000,000 4,000,000 2,000, 000 0 2014 Others, $56,580 Eating & Drinking, $415,798 Annual Sales Tax Revenue L Retail Automotive, $749,110 Manufacturing, $37,587 $8,406,296 2015 2016 2017 2018 YTD 2019 0 0. LL 0 c z c 0 2 CD 0 N 0 0 a m c c ii 21 z c 0 a� r O N fC E c� Q 18 Packet Pg. 89 I 6.5.a I City of Edmonds, WA Monthly Revenue Summary -Sales and Use Tax 2019 Sales and Use Tax Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance % January $ 583,740 $ 583,740 $ 665,493 14.01% February 1,326,812 743,072 1,464,443 10.37% March 1,890,823 564,012 2,088,425 10.45% April 2,418,442 527,618 2,636,953 9.04% May 3,087,512 669,070 3,384,424 9.62% June 3,695,140 607,628 July 4,344,323 649,183 August 5,056,215 711,892 September 5,734,922 678,707 October 6,438,793 703,871 November 7,175,252 736,459 December 7,825,000 649,748 Gas Utility Tax Sales and Use Tax 9,000,000 8,000,000 7,000,000 6,000,000 5,000,000 4,000,000 3,000,000 2,000,000 1,000,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC -*--Current Year Budget � Prior Year City ofEdmonds, WA Monthly Revenue Summary -Gas Utility Tax 2019 Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance % January $ 92,468 $ 92,468 $ 67,644 -26.85% February 188,382 95,914 140,257 -25.55% March 270,480 82,098 229,186 -15.27% April 338,414 67,935 300,757 -11.13% May 391,853 53,439 350,940 -10.44% June 429,417 37,564 July 458,287 28,870 August 482,130 23,843 September 504,337 22,207 October 530,073 25,736 November 567,790 37,717 December 626,600 58,810 Gas Utility Tax 700,000 600,000 500,000 400,000 300,000 200,000 100,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Current Year Budget Prior Year *The monthly budget forecast columns are based on a five-year average. r Q 19 Packet Pg. 90 I 6.5.a I City of Edmonds, WA Monthly Revenue Summary -Telephone Utility Tax 2019 Telephone Utility Tax Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance % January $ 90,093 $ 90,093 $ 83,102 -7.76% February 180,099 90,007 153,757 -14.63% March 261,769 81,670 220,849 -15.63% April 347,309 85,539 292,121 -15.89% May 425,673 78,364 358,213 -15.85% June 504,828 79,155 July 580,361 7S,533 August 657,995 77,634 September 738,345 80,350 October 815,639 77,294 November 889,278 73,638 December 967,200 77,922 Electric Utility Tax Telephone Utility Tax 1,000,000 800,000 600,000 400,000 200,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC � Current Yeaz Budget � Prior Year City of Edmonds, WA Monthly Revenue Summary -Electric Utility Tax 2019 Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January $ 180,392 $ 180,392 $ 171,454 -4.96% February 374,176 193,784 364,048 -2.71% March 542,795 168,619 526,085 -3.08% April 717,960 175,165 720,176 0.31% May 863,822 145,862 864,392 0.07% June 985,603 121,781 July 1,101,208 11S,604 August 1,212,283 111,075 September 1,323,362 111,080 October 1,439,932 116,570 November 1,562,550 122,618 December 1,691,300 128,750 Electric Utility Tax 1,800,000 1,600,000 1,400,000 1,200,000 1,000,000 800,000 600,000 400,000 200,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC -0-- Current Year Budget - Prior Year *The monthly budget forecast columns are based on a five-year average. ZD Packet Pg. 91 City of Edmonds, WA Monthly Revenue Summary -Meter Water Sales 2019 Meter Water Sales Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance % January $ 742,059 $ 742,059 $ 725,472 -2.24% February 1,256,325 514,266 1,233,174 -1.84% March 1,990,166 733,842 1,973,669 -0.83% April 2,476,952 486,786 2,430,513 -1.87% May 3,203,262 726,310 3,109,907 -2.91% June 3,766,233 562,971 July 4,657,894 891,661 August 5,440,698 782,804 September 6,513,015 1,072,317 October 7,251,320 738,305 November 8,101,309 849,989 December 8,624,564 523,255 City of Edmonds, WA Monthly Revenue Summary -Storm Water Sales 2019 Storm Water Sales Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance % January $ 322,033 $ 322,033 $ 317,727 -4.96% February 1,017,422 695,389 1,006,134 -2.71% March 1,338,925 321,503 1,323,366 -3.08% April 1,623,949 285,024 1,605,082 0.31% May 1,945,558 321,609 1,923,272 0.07% June 2,231,420 285,862 July 2,553,731 322,311 August 3,249,585 695,854 September 3,570,469 320,884 October 3,855,506 285,037 November 4,177,408 321,902 December 4,462,767 285,359 Storm Water Sales 4,500,000 4,000,000 3,000,000 2,500,000 1,500,000 1,000,000 500,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC —*-- Current Yeaz Budget � Prior Year *The monthly budget forecast columns are based on a five-year average. r Q 21 Packet Pg. 92 I 6.5.a I City ofEdmonds, WA Monthly Revenue Summary-Unmeter Sewer Sales 2019 Unmeter Sewer Sales Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance January $ 764,057 $ 764,057 $ 766,027 0.26% February 1,382,019 617,962 1,384,500 0.18% March 2,141,223 759,204 2,149,907 0.41% April 2,762,974 621,752 2,770,969 0.29% May 3,530,212 767,237 3,534,965 0.13% June 4,158,923 628,711 July 4,943,476 784,553 August 5,570,113 626,637 September 6,371,750 801,637 October 7,005,968 634,218 November 7,783,039 777,071 December 8,408,534 625,495 Umneter Sewer Sales 9,000,000 8,000,000 7,000,000 6,000,000 5,000,000 4,000,000 3,000,000 2,000,000 1,000,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC --P-- Current Year Budget - Prior Year *The monthly budget forecast columns are based on a five-year average. O N M C R C_ LL t y+ C O 2 O O tV R O C. O C M C IL z r C O O r O N M C N E t t) M r r Q 22 Packet Pg. 93 I 6.5.a I City of Edmonds, WA Monthly Expenditure Report -General Fund 2019 General Fund Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals January $ 5,293,482 $ 5,293,482 $4,237,264 -19.95% February 8,082,732 2,789,249 7,405,291 -8.38% March 11,556,438 3,473,706 10,663,247 -7.73% April 15,859,874 4,303,435 13,957,552 -11.99% May 18,488,610 2,628,737 17,357,697 -6.12% June 22,666,736 4,178,126 July 26,203,273 3,536,537 August 30,356,366 4,153,093 September 33,754,374 3,398,008 October 36,897,998 3,143,625 November 41,212,357 4,314,359 December 45,296,523 4,084,166 Non -Departmental General Fund 45,000,000 40,000,000 35,000,000 30,000,000 25,000,000 20,000,000 15,000,000 10,000,000 5,000,000 p l JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Current Yeaz Budget �Prior Year City ofEdmonds, WA Monthly Expenditure Report -Non -Departmental 2019 Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance January $ 2,586,468 $ 2,586,468 $ 1,939,971 -25.00% February 3,013,532 427,064 2,801,406 -7.04% March 4,041,004 1,027,471 3,658,670 -9.46% April 5,661,728 1,620,724 4,478,257 -20.90% May 5,936,842 275,114 5,383,743 -9.32% June 7,529,862 1,593,020 July 8,430,518 900,656 August 9,710,604 1,280,086 September 10,511,285 800,681 October 11,101,008 589,723 November 12,475,676 1,374,668 December 13,556,979 1,081,303 Non -Departmental 14,000,000 12,000,000 10,000,000 8,000,000 6,000,000 4,000,000 2,000,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC �*— Current Year Budget —Rh— Prior Year *The monthly budget forecast columns are based on a five-year average. O C. N M C R C_ LL t y+ C O 2 O O N R O C. <v C M C LL t C O O r O N M C N E t t� O r r Q 23 Packet Pg. 94 I 6.5.a I City of Edmonds, WA Monthly Expenditure Report -City Council 2019 City Council Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals January $ 39,368 $ 39,368 $ 22,406 -43.09% February 80,151 40,783 46,519 -41.96% March 128,249 48,098 82,908 -35.35% April 174,054 45,804 112,983 -35.09% May 228,252 54,198 158,489 -30.56% June 295,688 67,436 July 344,770 49,081 August 407,512 62,743 September 462,156 54,644 October 497,566 35,410 November 550,379 52,813 December 602,387 52,008 City of Edmonds, WA Monthly Expenditure Report -Office of Mayor 2019 Office of Mayor Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals January $ 24,108 $ 24,108 $ 24,303 0.81% February 49,562 25,454 47,727 -3.70% March 73,857 24,295 72,221 -2.21% April 98,624 24,767 97,904 -0.73% May 122,830 24,206 123,018 0.15% June 146,929 24,099 July 171,908 24,979 August 197,139 25,231 September 221,850 24,711 October 246,137 24,287 November 270,260 24,123 December 296,155 25,895 Office of Mayor 300,000.00 250,000.00 200,000.00 150,000.00 100,000.00 50,000.00 0.00 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC --0-CurrentYeaz Budget •PriorYeaz *The monthly budget forecast columns are based on a five-year average. O i. N C R C LL t y+ C O 2 O O N R O CL aD C c LL t r C O O r O N fC C N E t C� r Q 24 Packet Pg. 95 I 6.5.a I City of Edmonds, WA Monthly Expenditure Report -Human Resources 2019 Human Resources Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance % January $ 46,632 $ 46,632 $ 48,901 4.87% February 97,790 51,158 81,030 -17.14% March 148,537 50,747 116,157 -21.80% April 189,740 41,203 156,727 -17.40% May 236,212 46,472 194,001 -17.87% June 282,909 46,697 July 332,296 49,387 August 380,431 48,135 September 426,855 46,424 October 471,872 45,017 November 519,709 47,838 December 590,331 70,622 Municipal Court Human Resources 600,000 500,000 400,000 300,000 200,000 100,000 0 JAN FEB MAR APR MAX JUN JUL AUG SEP OCT NOV DEC --W-Current Yeaz Budget Prior Year City of Edmonds, WA Monthly Expenditure Report -Municipal Court 2019 Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance % January $ 87,580 $ 87,580 $ 70,858 -19.09% February 182,357 94,777 140,956 -22.70% March 280,184 97,826 219,779 -21.56% April 371,181 90,997 305,139 -17.79% May 465,663 94,482 410,401 -11.87% June 556,434 90,771 July 647,960 91,526 August 746,132 98,173 September 839,518 93,386 October 939,927 100,409 November 1,035,295 95,368 December 1,143,210 107,915 Municipal Court 800,000 600,000 400,000 200,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC --0--Current Year Budget �PriorYear *The monthly budget forecast columns are based on a five-year average. r Q 25 Packet Pg. 96 I 6.5.a I City of Edmonds, WA Monthly Expenditure Report -Community Services/Economic Development 2019 Community Services/Economic Development Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals January $ 38,544 $ 38,544 $ 39,270 1.88% February 82,051 43,507 92,749 13.04% March 130,166 48,114 132,003 1.41% April 191,996 61,831 181,514 -5.46% May 233,127 41,130 232,851 -0.12% June 277,966 44,839 July 323,762 45,796 August 379,014 55,252 September 428,169 49,155 October 483,157 54,989 November 542,833 59,676 December 618,232 75,399 City Clerk Community Services/Economic Development 700,000 600,000 500,000 400,000 300,000 200,000 100,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Current Year Budget -0-- Prior Year City of Edmonds, WA Monthly Expenditure Report -City Clerk 2019 Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance January $ 64,593 $ 64,593 $ 70,355 8.92% February 120,556 55,963 128,177 6.32% March 176,231 55,674 178,301 1.17% April 234,202 57,971 243,367 3.91% May 289,750 55,548 291,090 0.46% June 341,414 51,664 July 396,840 55,427 August 457,532 60,692 September 509,418 51,886 October 566,970 57,551 November 625,898 58,928 December 685,420 59,522 City Clerk 700,000 600,000 500,000 400,000 300,000 200,000 100,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Current Year Budget � Prior Year *The monthly budget forecast columns are based on a five-year average. Q 26 Packet Pg. 97 I 6.5.a I City of Edmonds, WA Monthly Expenditure Report -Technology Rental Fund 2019 Technology Rental Fund Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance % January $ 119,026 $ 119,026 $ 157,010 31.91% February 251,357 132,331 215,707 -14.18% March 324,740 73,383 320,177 -1.41% April 392,021 67,281 370,014 -5.61% May 467,013 74,992 415,102 -11.12% June 544,834 77,821 July 636,126 91,293 August 741,673 105,546 September 844,676 103,003 October 920,609 75,933 November 998,506 77,896 December 1,179,911 181,405 Finance Technology Rental Fund 1,200,000 1,000,000 800,000 600,000 400,000 200,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC � Current Yeaz Budget � Prior Year City of Edmonds, WA Monthly Expenditure Report -Finance 2019 Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance % January $ 137,055 $ 137,055 $ 128,270 -6.41% February 232,763 95,708 224,119 -3.71% March 329,813 97,051 319,388 -3.16% April 427,554 97,741 418,398 -2.14% May 526,278 98,724 515,266 -2.09% June 622,509 96,231 July 720,263 97,754 August 819,641 99,378 September 931,887 112,246 October 1,040,480 108,592 November 1,141,414 100,935 December 1,244,805 103,391 Finance 1,400,000 1,200,000 1,000,000 - 800,000 600,000 400,000 200,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC +Current Yeaz Budget --&- Prior Year *The monthly budget forecast columns are based on a five-year average. r Q 27 Packet Pg. 98 I 6.5.a I City of Edmonds, WA Monthly Expenditure Report -City Attorney 2019 City Attorney Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance January $ 74,130 $ 74,130 $ 47,964 -35.30% February 148,260 74,130 126,678 -14.56% March 222,390 74,130 222,683 0.13% April 296,520 74,130 294,517 -0.68% May 370,650 74,130 366,531 -1.11% June 444,780 74,130 July 518,910 74,130 August 593,040 74,130 September 667,170 74,130 October 741,300 74,130 November 815,430 74,130 December 889,560 74,130 Police City Attorney 900,000 800,000 700,000 600,000 500,000 400,000 300,000 200,000 100,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC -*-- Current Year Budget � Prior Year City of*Edmonds, WA Monthly Expenditure Report -Police 2019 Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance January $ 920,277 $ 920,277 $ 927,983 0.84% February 1,860,808 940,531 1,815,042 -2.46% March 2,787,770 926,962 2,786,780 -0.04% April 3,724,324 936,554 3,763,317 1.05% May 4,658,355 934,031 4,729,460 1.53% June 5,621,223 962,868 July 6,560,289 939,066 August 7,489,793 929,504 September 8,432,902 943,109 October 9,480,410 1,047,508 November 10,742,210 1,261,800 December 11,728,919 986,709 Police 12,000,000 10,000,000 8,000,000 6,000,000 4,000,000 2,000,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Current Year Budget �PriorYear *The monthly budget forecast columns are based on a five-year average. r Q Z$ Packet Pg. 99 City of Edmonds, WA Monthly Expenditure Report -Development Services 2019 Development Services Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance January $ 233,684 $ 233,684 $ 212,448 -9.09% February 495,741 262,057 434,026 -12.45% March 764,561 268,821 663,134 -13.27% April 1,032,480 267,919 924,696 -10.44% May 1,323,208 290,728 1,154,831 -12.72% June 1,594,826 271,617 July 1,875,116 280,290 August 2,181,101 305,985 September 2,471,090 289,989 October 2,769,197 298,107 November 3,083,430 314,232 December 3,426,322 342,892 Parks & Recreation Development Services 3,500,000 3,000,000 2,500,000 2,000,000 1,500,000 1,000,000 500,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC --0- Current Yeaz Budget � Prior Year City ofEdmonds, WA Monthly Expenditure Report -Parks & Recreation 2019 Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance January $ 290,564 $ 290,564 $ 280,923 -3.32% February 589,424 298,861 588,578 -0.14% March 908,094 318,670 888,876 -2.12% April 1,234,622 326,528 1,209,937 -2.00% May 1,579,091 344,468 1,554,647 -1.55% June 1,921,011 341,920 July 2,365,248 444,238 August 2,891,636 526,388 September 3,284,546 392,910 October 3,627,539 342,993 November 3,925,800 298,261 December 4,303,374 377,574 Parks & Recreation 4,500,000 4,000,000 3,500,000 3,000,000 2,500,000 2,000,000 1,500,000 1,000,000 500,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC +Current Yeaz Budget -d-- Prior Yeaz *The monthly budget forecast columns are based on a five-year average. r Q 29 Packet Pg. 100 I 6.5.a I City of Edmonds, WA Monthly Expenditure Report -Public Works 2019 Public Works Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance % January $ 50,384 $ 50,384 $ 39,815 -20.98% February 102,273 51,889 80,023 -21.76% March 153,446 51,173 120,273 -21.62% April 204,598 51,153 161,804 -20.92% May 255,170 50,572 203,614 -20.20% June 306,227 51,057 July 357,744 51,517 August 407,869 50,125 September 456,744 48,874 October 506,690 49,946 November 556,681 49,991 December 610,480 53,799 Facilities Maintenance Public Works 700,000 600,000 500,000 400,000 300,000 200,000 100,000 i 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC � Current Yeaz Budget -0-- Prior Year City of Edmonds, WA Monthly Expenditure Report -Facilities Maintenance 2019 Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance % January $ 228,301 $ 228,301 $ 172,786 -24.32% February 457,666 229,364 382,230 -16.48% March 700,969 243,303 576,136 -17.81% April 931,712 230,743 768,024 -17.57% May 1,165,903 234,191 954,705 -18.11% June 1,378,275 212,372 July 1,646,299 268,024 August 1,872,892 226,592 September 2,123,872 250,981 October 2,374,954 251,082 November 2,628,848 253,894 December 2,914,729 285,881 *The monthly budget forecast columns are based on a five-year average. r Q 30 Packet Pg. 101 I 6.5.a I City ofEdmonds, WA Monthly Expenditure Report -Engineering 2019 Engineering Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance % January $ 199,012 $ 199,012 $ 211,009 6.03% February 397,302 198,290 416,031 4.71% March 613,115 215,813 625,938 2.09% April 835,389 222,274 840,970 0.67% May 1,053,506 218,118 1,085,050 2.99% June 1,284,814 231,308 July 1,508,283 223,469 August 1,747,325 239,041 September 1,974,318 226,993 October 2,206,759 232,441 November 2,431,557 224,798 December 2,685,620 254,063 Engine a ring 3,000,000 2,500,000 2,000,000 1,500,000 1,000,000 500,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC � Current Year Budget —0-- Prior Year *The monthly budget forecast columns are based on a five-year average. O N M C R C LL t y+ C O O O N R O rL O C M C M z r C O O r O N M C N E t U M r r Q 31 Packet Pg. 102 I 6.5.a I INVESTMENT PORTFOLIO SUMMARY City of Edmonds Investment Portfolio Detail As of May 31, 2019 Years Agency/ Investment Purchase to Par Market Maturity Coupon Issuer Type Price Maturity Value Value Date Rate SCIP CD 2,500,000 0.01 2,500,000 2,500,000 06/04/19 2.65% FNMA Bonds 999,750 0.04 1,000,000 999,619 06/13/19 1.40% FHLB Bonds 1,000,400 0.05 1,000,000 999,436 06/20/19 1.40% FNMA Bonds 988,720 0.33 1,000,000 996,916 09/27/19 1.50% FHLMC Bonds 995,970 0.34 1,000,000 996,074 10/02/19 1.25% FNMA Bonds 1,994,310 0.41 2,000,000 1,991,538 10/28/19 1.35% FNMA Bonds 997,300 0.83 1,000,000 990,867 03/30/20 1.38% FHLB Bonds 2,003,780 0.83 2,000,000 1,984,562 03/30/20 1.45% FNMA Bonds 2,000,000 0.83 2,000,000 1,988,882 03/30/20 1.65% FHLMC Bonds 2,003,868 0.91 2,000,000 1,980,998 04/28/20 1.35% FNMA Bonds 1,000,000 1.08 1,000,000 991,880 06/30/20 1.38% FNMA Bonds 1,000,000 1.08 1,000,000 991,880 06/30/20 1.38% FHLB Bonds 3,000,000 1.12 3,000,000 2,967,441 07/13/20 1.20% RFCS Bonds 1,999,698 1.13 2,120,000 2,067,774 07/15/20 1.60% FHLB Bonds 2,000,000 1.17 2,000,000 1,989,492 07/30/20 1.75% FNMA Bonds 1,000,000 1.25 1,000,000 989,955 08/28/20 1.40% FNMA Bonds 1,000,000 1.25 1,000,000 989,955 08/28/20 1.40% FHLMC Bonds 999,500 1.59 1,000,000 992,851 12/30/20 1.75% FNMA Bonds 2,005,474 1.64 2,000,000 1,980,610 01/19/21 1.50% FM Bonds 2,000,000 1.84 2,000,000 1,989,538 04/01/21 1.87% First Financial CD 3,000,000 1.86 3,000,000 3,000,000 04/10/21 2.86% FHLB Bonds 2,000,000 2.06 2,000,000 1,999,634 06/22/21 2.18% FFCB Bonds 968,940 2.29 1,000,000 991,417 09/13/21 1.73% FHLMC Bonds 2,000,000 2.49 2,000,000 1,995,228 11/26/21 2.13% FHLMC Bonds 999,400 2.59 1,000,000 995,506 12/30/21 2.00% FHLMC Bonds 1,000,000 2.74 1,000,000 999,331 02/25/22 2.15% First Financial CD 2,803,516 4.46 2,803,516 2,803,516 11/15/23 2.10% TOTAL SECURITIES 44,260,627 1.34 44,423,516 44,164,900 Washington State Local Gov't Investment Pool TOTAL PORTFOLIO rFM, D,_ Issuer Diversification First Financial - CD, 13% FNMA, 29% RFCS, 5% FHLMC, 18% FHLB, 23% 20,324,321 20,324,321 Demand 2.50% $ 64,747,837 $ 64,489,221 Cash and Investment Balances (in $ Millions) Checki ng, $2.1 , 3% Bonds, State LGIP, $36.1, 54% $20.3, 30% CD's, $8.3, 13% 32 Packet Pg. 103 1 I 6.5.a I INVESTMENT PORTFOLIO SUMMARY Annual Interest Income $1,000,000 917,754 $800,000 $653,690 $600,000 $486,811 $423,816 $400,000 335 926 —q $200,000 163 214 2017 2018 YTD 2019 Edmonds Rate of Return Compared to Benchmark (Rolling 12 months) - - - 6 Month Treasury Rate (Benchmark) City Blended Rate 2.8 % — 2.5% -------------------------------- 2.3 % 2.0 % 1.8 1.5 % 1.3 % 1.0 % 0.8 % 0.5 % 0.3 % 0.0 % June August October December February April Maturity Distribution and Rate of Return $12, 000,000 2.50% $10, 000,000 2.00% $8,000,000 1.50% $6,000,000 1.00% $4,000,000 $2,000,000 ■ 0.50% $- 0.00% 0-6 Mo 6-12 M o 12-18 M o 18-24 M o 24-30 M o 30-36 M o 36-42 M o 42-48 M o 48-54 M o 54-60 M o Q 33 Packet Pg. 104 6.5.a GENERAL FUND OVERVIEW FUND BALANCES CHANGE IN FUND BALANCES GENERAL FUND & SUBFUNDS ---- ACTUAL ---- ---- ACTUAL ---- 12/31 /2018 3/31 /2019 5/31 /2019 Q1 YTD 001-General Fund $ 11,233,277 $ 7,364,212 $ 12,764,554 $ (3,617,016) $ 1,531,27� 009-Leoff-Medical Ins. Reserve 333,447 214,379 138,616 (119,069) (194,83, 0 a 011-Risk Management Fund 929,908 926,477 929,908 - - 012-ContingencyReserve Fund 5,564,260 5,466,190 5,564,260 - - 014-Historic Preservation Gift Fund 12,607 7,055 7,074 (5,533) (5,53: 016-Building Maintenance 210,221 210,221 210,221 - - ii 017 - Marsh Restoration & Preservation 309,178 310,623 314,366 1,445 5,18" >+ 018 -Edmonds Homelessness Response 225,443 223,581 223,581 (1,862) (1,86. 019 - Edmonds Opioid Response 250,000 250,000 250,000 - - 0 a Total General Fund & Subfunds $ 19,068,342 $ 14,972,738 $ 20,402,580 $ (3,742,035) $ 1,334,23! Cn 0 N *$2,000,000 of the General Fund Balance has been assigned by management for the development of Civic Field. 1` 0 Q. m U c 0 General Fund & Subfunds E ii 21 2' t 18 0 0 Z 15 ■ General Fund 12 & Subfunds r N c $17.07 ■ Civic Field 9 $12.97 6 a� 3 E eta U Q Dec 2018 Mar 2019 May 2019 *Please note that these revenues and expenses occur within annual cycles. This Interim Report is not adjusted for accruals or those annual cycles. The beginning fund balances for 2019 are preliminary, these will be updated after the completion of the 2018 Financial Statements. 34 Packet Pg. 005 6.5.a GOVERNMENTAL FUNDS OVERVIEW CHANGE IN FUND FUND BALANCES BALANCES GOVERNMENTAL ---- ACTUAL ---- ---- ACTUAL ---- FUNDS 12/31 /2018 3/31 /2019 5/31 /2019 Q1 YTD General Fund & Subfunds $ 19,068,342 $ 14,972,738 $ 20,402,580 $ (3,742,035) $ 1,334,23E Special Revenue 9,524,484 10,905,058 10,015,156 852,053 490,67,' Debt Service 12 4,481 52,540 6,169 52,52E Capital Projects 2,209,541 2,232,147 2,237,653 26,906 28,11.' 0 0 Total Governmental Funds $ 30,802,378 $ 28,114,424 $ 32,707,929 $ (2,856,907) $ 1,905,55( c c� c ii , t r c 0 a Governmental Fund Balances -By Fund Group Governmental Fund Balances - rn T_ 21 18 15 c 12 0 9 6 3 Combined N ca $20.40 35 — t $32.71 0 30.80 Q- m General 30 28.11 Fund & R v Subfunds 25 tv c Special jy Revenue c 20 >, t > 10.02 0 Debt 15 V 1 Z Service r O 10 N --"Capital � Projects 5 }; >2.24 y E t $0.05 U Dec 2018 Mar 2019 May 2019 Dec 2018 Mar 2019 May 2019 Q *Please note that these revenues and expenses occur within annual cycles. This Interim Report is not adjusted for accruals or those annual cycles. The beginning fund balances for 2019 are preliminary, these will be updated after the completion of the 2018 Financial Statements. 35 Packet Pg. 106 1 SPECIAL REVENUE FUNDS OVERVIEW I 6.5.a I GOVERNMENTAL SPECIAL REVENUE 104 - Drug Enforcement Fund 111 - Street Fund 112 - Combined Street Const/Improve 117 - Municipal Arts Acquis. Fund 118 - Memorial Street Tree 120 - Hotel/Motel Tax Revenue Fund 121 -Employee Parking Permit Fund 122 - Youth Scholarship Fund 123 -Tourism Promotional Fund/Arts 125 - Real Estate Tax 2 * 126 - Real Estate Excise Tax 1 127 - Gifts Catalog Fund 130 - Cemetery Maintenance/Improvement 136 - Parks Trust Fund 137 - Cemetery Maintenance Trust Fund 138 - Sister City Commission 140 -Business Improvement Disrict Total Special Revenue FUND BALANCES ---- ACTUAL ---- CHANGE IN FUND BALANCE; $ 0 $ (9,725) $ 6,553 $ 1,343,329 1,132,176 1,040,659 859,216 2,016,382 1,354,044 570,634 576,596 580,097 18,898 18,972 19,182 89,937 90,261 91,502 77,046 86,178 88,627 15,030 13,845 13,801 70,586 76,640 76,470 2,230,820 2,326,915 2,319,181 2,562,524 2,814,360 2,636,103 295,225 352,436 356,099 212,775 208,783 205,354 160,606 158,756 158,058 985,656 993,557 1,007,934 8,102 7,779 11,215 24,099 41,149 50,277 $ 9,524,484 $ 10,905,058 $ 10,015,156 $ ACTUAL 3,262 $ (207,186) 629,977 7,932 143 1,005 9,385 (1,126) 6,389 82,132 238,332 58,183 (3,301) (1,258) 11,433 (297) 17,050 852,053 $ *$200,000 of the fund balance in Fund 125 has been reserved for Marsh Restoration Funding Special Revenue Funds 12 10 8 6 ■ Special $9 52 $10.91 $10.02 Revenue 4 2 Dec 2018 Mar 2019 May 2019 *Please note that these revenues and expenses occur within annual cycles. This Interim Report is not adjusted for accruals or those annual cycles. The beginning fund balances for 2019 are preliminary, these will be updated after the completion of the 2018 Financial Statements. 6,55, (302,67( 494,825 9,46: 28, 1,56! 0 11,58( y (1,23( 5,88, 88,36, 73,575 LL 60,87: (7,42( r (2,54t p 22,27- M Cn 3,11, c 26,17! 4, 490,67: 0 Q. m rr U c 0 c ii t c 0 2 rn r O N f� c a� E t v 2 r Q 36 Packet Pg. 107 ENTERPRISE FUNDS OVERVIEW I 6.5.a I ENTERPRISE FUNDS 421 -Water Utility Fund 422 - Storm Utility Fund 423 - Sewer/WWTP Utility Fund 424 - Bond Reserve Fund 411 -Combined Utility Operation Total Enterprise Funds FUND BALANCES ---- ACTUAL ---- $ 21,205,815 $ 17,473,798 $ 21,264,371 11,913,623 11,829,589 12,775,624 45,890,098 45,779,494 48,038,154 843,960 843,971 843,966 - 187,019 61,876 $ 79,853,496 $ 76,113,870 $ 82,983,991 CHANGE IN FUND ---- ACTUAL ---- $ 526,966 $ 932,297 1,840,287 3 39,011 $ 3,338,565 $ *$250,000 of the Storm Utility Fund Balance has been reserved for Marsh Restoration Funding 50,000,000 45,000,000 40,000,000 35,000,000 30,000,000 25,000,000 20,000,000 15,000,000 10,000,000 5,000, 000 0 Enterprise and Agency Fund Balances as of May 31, 2019 Combined Utility Water Storm Sewer/WWTP 58,55E 862,00. 2,148,05E f 61,87E o 3,130,49! c c� c ii , t r c 0 a rn 0 N 1` 0 d fY R v c tv c ii 21 c O 0 N Bond Reserve Firemen's Pension }; Fund O E t U is r Q *Please note that these revenues and expenses occur within annual cycles. This Interim Report is not adjusted for accruals or those annual cycles. The beginning fund balances for 2019 are preliminary, these will be updated after the completion of the 2018 Financial Statements. 37 Packet Pg. 108 SUMMARY OVERVIEW I 6.5.a I FUND BALANCES CITY-WIDE ---- ACTUAL ---- 12/31 /2018 3/31 /2019 5/31 /2019 Governmental Funds $ 30,802,379 $ 28,114,424 $ 32,707,929 $ Enterprise Funds 79,853,496 76,113,870 82,983,991 Internal Services Fund 10,175,941 9,993,633 10,211,048 Agency Funds 217,698 198,816 235,457 Total City-wide Total $121,049,514 $114,420,743 $126,138,425 $ CHANGE IN FUND BALANCES ---- ACTUAL ---- Q1 YTD (2,856,907) $ 1,905,55( 3,338,565 3,130,49,1 65,963 35,10-1 (18,882) 17,76( O 528,738 $ 5,088,91 ' .v c R c ILL Governmental Fund Balances (Excluding General Fund) as of May 31, 2019 2' z Drug Enforcement Fund Street Fund Combined Street Const/Improve Fund Municipal Arts Acquis. Fund Memorial Street Fund Hotel/Motel Tax Revenue Fund Employee Parking Permit Fund Youth Scholarship Fund Tourism Promotional Fund/Arts Real Estate Excise Tax 2 Real Estate Excise Tax 1, Parks Acq Gifts Catalog Fund Cemetery Maintenance/Improvement Parks Trust Fund Cemetery Maintenance Trust Fund Sister City Commission Business Improvement District L.I.D. Fund Control Parks Capital Construction Fund c O 2 CD T- 0 N R 1r O CL O C C IL 21 t r C O 0 N C N E t c� to r r $- $500,000 $1,000,000 $1,500,000 $2,000,000 $2,500,000 $3,000,000 $3,500,000 Q *Please note that these revenues and expenses occur within annual cycles. This Interim Report is not adjusted for accruals or those annual cycles. The beginning fund balances for 2019 are preliminary, these will be updated after the completion of the 2018 Financial Statements. 38 Packet Pg. 109 INTERNAL SERVICE FUNDS OVERVIEW I 6.5.a I I INTERNAL SERVICE FUNDS 511 -Equipment Rental Fund 512 -Technology Rental Fund Total Internal Service Funds 12,000,000 10,000,000 8,000, 000 6,000, 000 4,000, 000 2,000, 000 FUND BALANCES ---- ACTUAL ---- 12/31 /2018 3/31 /2019 5/31 /2019 $ 9,552,483 $ 9,699,333 $ 9,542,083 $ 623,458 294,300 668,966 $ 10,175,941 $ 9,993,633 $ 10,211,048 1 $ Internal Service Fund Balances $9,552,483 $9,699,333 $9,542,083 Dec 2018 Mar 2019 May 2019 CHANGE IN FUND BALANCES ---- ACTUAL ---- Q1 YTD 0 110,162 $ (10,401 a (44,199) 45,50- .� c 65,963 $ 35,10' c ii t r c 0 0 N R 0 a a� FU c �a c ■ 511-Equipment Rental Fund u_ ■ 512-Technology Rental Fund c 0 r O N M C E t v r Q *Please note that these revenues and expenses occur within annual cycles. This Interim Report is not adjusted for accruals or those annual cycles. The beginning fund balances for 2018 are preliminary, these will be updated after the completion of the 2018 Financial Statements. 39 Packet Pg. 110 1 7.1 City Council Agenda Item Meeting Date: 07/23/2019 Council Finance Subcommittee Report and Minutes Staff Lead: Council Department: City Clerk's Office Preparer: Scott Passey Background/History N/A Staff Recommendation N/A. For information only. Narrative This is an opportunity for Councilmembers to report on items discussed at the special Finance Committee meeting held on Tuesday, July 16. The minutes are attached. Attachments: FC071619 Packet Pg. 111 7.1.a FINANCE COMMITTEE MEETING July 16, 2019 Elected Officials Present Staff Present Councilmember Diane Buckshnis (Chair) Scott James, Finance Director Councilmember Tom Mesaros Phil Williams, Public Works Director Mayor Dave Earling Rob English, City Engineer The meeting was called to order at 6:00 p.m. in the Jury Meeting Room. Options for Utility Protects Mr. James explained in the past the City bonded for annual pipe replacement; that was changed with a series of rate increases six years ago to institute a pay-as-you-go model. When staff presented a rate study in June with a recommendation to use rate increases to pay for annual maintenance, questions were raised about using debt to pay for annual maintenance. A three year a pay-as-you-go pipe replacement project costs approximately $10M. There is also an $18M pyrolysis project at the WWTP (half of cost to be paid by partner cities). The packet includes several bond scenarios for funding the pyrolysis project and/or the annual pipe replacement: 1. Bond scenario to fund half of WWTP pyrolysis project with an estimated cost of $9M. 2. Bond scenario to fund half of WWTP pyrolysis project with an estimated cost of $9M, plus $10M to fund the next three years annual maintenance and replacement projects. 3. Bond scenario to fund all the cost of WWTP pyrolysis project with an estimated cost of $18M. 4. Bond scenario to fund all the cost of WWTP pyrolysis project with an estimated cost of $18M, plus $10M to fund the next three years annual maintenance and replacement projects. 5. Analysis of debt service requirement to issue $10M to fund the next three years annual maintenance and replacement projects. Mr. Williams relayed after meeting with WWTP partners (Mountlake Terrace, Ronald Wastewater District/Shoreline, Olympic View) there was little interest in the City borrowing the cost of the pyrolysis project and apportioning the cost to partner cities. The City is in the process of negotiating a 30-year agreement with the WWTP partners. The City of Edmonds' share of the pyrolysis project is $9M. In addition to the pyrolysis project, there are two other large wastewater projects, 1) replacing the Pump Station 1 on Sunset Avenue estimated to cost $15M-20M, and 2) Lake Ballinger project which is estimated to cost $10M; Mountlake Terrace will share 35-40% of the cost. E t Councilmember Buckshnis suggested a three year reprieve from rate increases via bonding for r maintenance rather than pay-as-you-go. She viewed pipe replacement a capital project and the cost Q should be shared with future ratepayers via bonding. Mr. Williams explained the goal is to replace/rehab 1 % of the City' pipes each year which will take 100 years to replace all the pipe and then start again. Thus it is not a capital project, but a really expensive maintenance project. Councilmember Mesaros compared it to the painting of the Golden Gate Bridge which is never-ending. If all the pipes were replaced in 10 years, that could be considered a capital project. Councilmember Buckshnis pointed out the increase to residents' property taxes due to Sound Transit and increasing property values. If there was interest in a three-year reprieve, Mr. Williams suggested the fairest way would be to not do pipe replacements for three years rather than artificially avoiding a rate increase followed by a spike in rates. Packet Pg. 112 7.1.a 07/16/19 Finance Committee Minutes, Page 2 Scott Bauer, NW Financial, said his rule of thumb is to borrow for large capital project and pay-as-you- go for O&M type expenses. If the City continues to borrow for O&M, its debt will increase substantially. Discussion included reducing the City's bonding capacity if the City bonded for the entire cost of the pyrolysis project and apportioned the cost to partner cities, the Pump Station 1 project, concern with borrowing to fund ongoing maintenance, the McKinstry report that found $6.51VI in deferred building maintenance and $700,000-$800,000/year in ongoing maintenance, the need to develop a debt policy, rate amount increase if the pipe replacement is funded via pay-as-you-go versus bonding, bonding for $10M for pipe replacement adds $4.51VI in interest, 5% increase in water costs proposed to be offset by a 5% increase in water rates, the City's past practice of bonding for pipe replacement and the remaining $42M debt, determining a balance between borrowing and pay-as-you-go to achieve generational equity, utility rate increases in other cities, emergency pipe repairs, whether there is a targeted rate increase amount, and concern borrowing kicks the can down the road. It was agreed staff will research bonding for: • $91VI for pyrolysis project • $91VI for pyrolysis project plus 50% of pipe replacement • $91VI for pyrolysis project and 100% for pipe replacement Action: Staff and consultant conduct additional research and present to full Council. The meeting was adjourned at 6:40 p.m. rn r ti O U U_ c m E t v a r r Q Packet Pg. 113 8.1 City Council Agenda Item Meeting Date: 07/23/2019 Report on Bids for the Dayton Street Stormwater Pump Station Project and contract Award Staff Lead: Rob English Department: Engineering Preparer: Megan Luttrell Background/History On July 9, 2019, staff presented this item to the Parks & Public Works Committee. Staff Recommendation Award the construction contract to BOSS Construction, Inc. in the amount of $1,529,420.20 and authorize a management reserve of $229,413 (15%) for unforeseen circumstances. Narrative The Dayton Street Pump Station project was designed to reduce flooding on Dayton Street, SR-104, the Edmonds Marsh, and Harbor Square. The City completed the Dayton Street and SR-104 Drainage Alternatives Study in August of 2013 which recommended the current project as one of a series of projects to address flooding in this general area. In 2016, the City initiated full construction design for this project with the intent of a 2017 installation. Significant delays in the initially intended project funding mechanism led to delayed construction. With approval of the additional funding via direct appropriation from the State Legislature, the project is now ready to move forward with construction. The project was advertised for bid on June 13, and June 20 of this year with bids due on July 9, 2019. Two bid were received and both exceeded the engineer's estimate for the project. The apparent low bidder was BOSS Construction, Inc with a bid of $1,529,420.20 which was roughly $205,000 over the engineers estimate. The project also had some increases in cost associated with the State Legislature funding and having to comply with additional historical preservation and archeological observation requirements. In order to fully fund all cost increases and maintain the management reserve, staff will need to present a third quarter budget amendment for $200,000. The additional stormwater utility funds will be programmed from the Dayton St. Utility Replacement Project (3rd Ave to 9th Ave), since the actual bid prices for the stormwater improvements were less than the estimated budget amount. The pump station project not only addresses a direct flooding concern for Dayton Street, it is a necessary predecessor for potentially removing a tide gate with the Willow Creek Daylighting Project. Currently, the Harbor Square complex floods when water levels in the Marsh reach about 12.0'. King tides can exceed 12.0' without any storm water impacts, but currently, the tide gate provides attenuation which keeps the tidal influence down several feet in the Marsh so we do not see flooding directly. However, water in the marsh still cannot push out to the Sound in these conditions and so that couple of feet between tidal elevation and water surface in the Marsh provide the necessary storage for Packet Pg. 114 8.1 the City storm system to discharge without flooding. If we remove the current restriction points for marsh inflows with the daylighting project, the influence of the tide will be much more significant and more directly related to the tide elevation. The pump station project helps mitigate this concern by providing a sub -surface overflow within the existing pipe system. The weirs are set to elevations which divert all flows from Dayton Street and Salish Crossing into the pump system rather than the Harbor Square system which outlets to the Marsh; this reduces the amount of area the City's drainage system contributes to the Marsh by roughly 4.5 acres, a majority of which comes from pollution generating impervious surfaces. Additionally, they allow backup in the Harbor Square system to overflow back to the pump station without surface ponding. This partially mitigates the impacts of increasing the Marsh inundation footprint and allowing more tidal influence in the Marsh. Without the pump station, the Willow Creek Daylight project could not proceed without either assuming additional liability and costs for impacts of increased tidal inflows (such as increased flooding of private property), install a tide gate, or wall in all sides of the marsh with levees (some levees will be needed either way but are currently proposed only along the BNSF right-of-way). The intercepting manholes with weir plates are proposed at the natural pipe crossing locations as they exist. This allows for upland flow to be diverted without significant trenching or pavement repair. While a small portion of the west storm drain outfall through Harbor Square could arguably be re-routed to the pump system, the project would require re-laying a majority of the existing system and running new piping to connect back to the pump system. The additional cost of such an amendment would be significant with the hundreds of extra feet of trenching and repair to be done. It may also require new easements from the Port of Edmonds. The east system through Harbor Square likely cannot be routed much more than the current proposal due to this system being deeper. Attachments: Exhibit Const Budget BID Summary Project Site Map Packet Pg. 115 8.1.a Dayton Street Stormwater Pump Station Proposed Construction Budget Description Amount Low Bid $ 1,529,420 Management Reserve (15%) $ 229,413 Construction Support from Design Team $ 89,913 Historic Preservation and Archeological Observation $ 24,565 Staff Project Management Time $ 80,000 PUD Permitting & Coordination $ 25,000 Construction Management, Inspection & Testing $ 140,763 Construction Funding Funding Total = $ 2,119,074 Amount Legislative Direct Appropriation (via Dept. Commerce) $ 515,000 Snohomish County PW Loan $ 545,000 Stormwater Funds (422) Remaining Budget $ 920,205 Stormwater Funds (422) Transfer from (Dayton 3rd to 9th) $ 200,000 Total = $ 2,180,205 Packet Pg. 116 8.1.b -� Is �. ��� City of Edmonds Project Name: Dayton Street Stromwater Pump Station Project No: E4FE / c455 Bid Date: 7/9/2019 T Bid Time: 2:00 prn Bid # Contractor Total Bid EST Engineer's Estimate $ 1,324,532.00 1 BOSS Construction, Inc. $ 1,529,420.20 2 Shoreline Construction Co $ 1,849,440.00 a� 0 L a 0 r U) a E 0 a L E L 0 U) Y m L //b^+ v! L 0 m Packet Pg. 117 8.1.c Puget Sound i �`/� Legend: r = Ditch/stream Proposed a w �� = Pipe < 12" a Force Main ` y u� = Pipe 12"-18" a Proposed , oJc = Pipe >_ 24" P � �� r Pump Station Qa i T r rt / O 1" Salish Ferry Toll Booths U) - • ,+ Crossing p. 0, t ��' o o • , � and Queuing Area m ` Existing Outfall mot. r low, �— p '�� •� ! Existing Dayton St 24"� Diameter Drainage SystemI -a 4 ' Harbor c Square !20 > .0 FOO 4 Ion • C 7 • ` `) c.i .O ' s d c E t 65 130 260 390 520 City of Edmonds Feet Dayton St Stormwater a Pump Station - Vicinity Map Packet Pg. 118 9.1 City Council Agenda Item Meeting Date: 07/23/2019 Budget discussion to review overarching Council and community priorities Staff Lead: Council Department: City Council Preparer: Maureen Judge Background/History On July 12, 2019 the Council, Mayor and city staff met for a Council Budget Retreat at City Hall. It was determined at that meeting that Council would meet with the Mayor within two weeks after the retreat to discuss overarching Council and community priorities. Staff Recommendation N/A Narrative The budget discussion will focus on high-level priorities, not individual priorities, the focus should be on overarching goals. Attachments: Notes from Part 2 of Budget Retreat Packet Pg. 119 9.1.a Notes from Part 2 of Budget Retreat with Jeff Taraday—July 12, 2019 During the discussion of Council/Staff/Mayor budget priorities, it was determined that the Council would meet with the Mayor within two weeks after the retreat to discuss overarching Council and community priorities. The Mayor then goes back to the staff to get feedback on these priorities. High-level priorities were requested and Jeff suggested business plan ideas that cover six to eight important items. Carrie thought focusing on macro level goals was important and that specific projects —such as Civic Field —be listed under each macro goal. Items agreed on by the retreat attendees: • A milestone calendar for 2019-2020 • A date that everyone agrees to revenue number • Budget formation or "design" • Budget policy e.g. who pays for ongoing maintenance for a new park? • Priorities and Process: o Do we recommend moving to a two-year budget? The next part of the hour focused on Community Engagement with brainstorming on how to improve outreach and begin to answer the question: How could we have tapped into community sentiment 3-4 years ago around the Waterfront Connector project? Notes from the post -it white board: • Tap into community sentiment earlier • Staff position (Director -level) for outreach including all social media; expertise and multi -cultural outreach a must. They are the trusted source of information • Strategic timing of outreach via multiple was and different times of day —internal and external communications • Community engagement for everything we do • Quarterly reporting out from each department • Strategic planning for public outreach — coordinating cross -departments • Citizens: Are you willing to pay for it? • Strategic communications = Economic Development • Specialty help : Fact vs. fiction in the community • Public information officer should not be optional for the city • Should staff comment on My Edmonds News? • Better listening — a two-way conversation Packet Pg. 120