Loading...
HomeSearchMy WebLinkAboutAPPROVED ENG RESUB 3-BLD2022-0989+Civil_Plan+8.15.2023_5.35.49_PM+3727873APPROVED ENG Transportation_Impact_Form+11.8.2022_2.01.54_PM+3209802APPROVED PLN BLD FIR Architectural_Plans+11.8.2022_2.07.58_PM+3209847APPROVED PLN RESUB 1-BLD2022-0989+Site_Plan+3.14.2023_3.00.34_PM+3421095APPROVED STM BLD2022-0989+Storm_Drainage_Report+8.15.2023_5.35.49_PM+3727874APPROVED TRE RESUB 1-BLD2022-0989+Tree_Retention_Plan+3.14.2023_3.00.33_PM+3421094BLD2022-0989+Application+7.25.2022_2.33.11_PM+3010462BLD2022-0989+Critical_Area_Study+7.14.2022_1.57.36_PM+2990248BLD2022-0989+Supplementals_Authorization_and_Acknowledgment_-_Building+7.25.2022_2.33.09_PM+3010461BLD2022-0989+Supplementals_Critical_Area_Determination_-_Building+7.25.2022_2.33.14_PM+3010464BLD2022-0989+Supplementals_Mechanical_Equipment_-_Residential_Building_Permits+7.25.2022_2.33.04_PM+3010458Building PermitDNS Arborist_Report+11.8.2022_2.07.58_PM+3209846ENG CORRECTION NOTICE 9.26.2024ENG PROJECT ASBUILTENG RECORDED STORMWATER COVENANTENG STORMWATER COVENANTFor Reference-BLD022-0989-Storm_Drainage_Plan+7.14.2022_1.56.58_PM+2990245RESUB 1-BLD2022-0989+OVWSD+3.14.2023_3.00.33_PM+3421092RESUB 2-BLD2022-0989+Geotechnical_Report+7.6.2023_5.44.14_PM+3651884RESUB 2-BLD2022-0989+Utility Deviation Request-7.6.2023_5.44.14_PM+3651882REVIEWED 2018 CITY NOTES REV.3.18.21REVIEWED BLD2022-0989+Energy_Calculations+7.25.2022_2.32.30_PM+3010451REVIEWED BLD2022-0989+Structural_Calculations+7.25.2022_2.31.59_PM+3010446REVIEWED PRE CON for Residential - 2021REVIEWED STORMWATER COVENANT BLD2022-0989 NOT SIGNEDSWPPP+11.8.2022_2.07.58_PM+3209838