Loading...
HomeSearchMy WebLinkAboutAPPROVED BLD RESUB 2-BLD2022-1135+Structural Plan+8.24.2023_7.37.21_PM+3746841APPROVED RESUB 3 ENG BLD PLN BLD2022-1135+Architectural_Plan+10.6.2023_11.49.26_AM+3826099APPROVED RESUB 3-BLD2022-1135+Biologist Report+10.6.2023_11.49.27_AM+3826098BLD2022-1135+Application+8.22.2022_6.48.59_PM+3066155BLD2022-1135+Supplementals_Authorization_and_Acknowledgment_-_Building+8.22.2022_6.49.04_PM+3066156BLD2022-1135+Supplementals_Critical_Area_Determination_-_Building+8.22.2022_6.49.08_PM+3066157BLD2022-1135+Supplementals_Mechanical_Equipment_-_Residential_Building_Permits+8.22.2022_6.48.59_PM+3066154BLD2022-1135+Supplementals_Residential_Addition_Project_Information+8.22.2022_6.48.55_PM+3066152Building PermitEpoxy hold down Si report.RESUB 2-BLD2022-1135+Survey+8.24.2023_7.37.21_PM+3746840REVIEWED BLD2022-1135+Krazan Report+8.22.2022_6.47.07_PM+3066149REVIEWED RESUB 2-BLD2022-1135+Structural_Calculations+8.24.2023_7.37.21_PM+3746842Six Star LLLP Residence - EOR footing revisionSix Star LLLP Residence - EOR interior shear revisionSong 75 percent rule