Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
09624604DFR040725DM-welding inspection.pdf
09624604MAG040725DM- MT Report.pdf
416-017-WO 001.pdf
APPROVED BLD ENG FIR RESUB 1-BLD2022-1542+Architectural_Plan+8.5.2024_12.00.59_PM+4421234
APPROVED BLDFIR REV1 BLD2022-1542 _Building_Floor_Plan_02-18-2025_11_48_55_21-28A21-WH-A2.1_R1_250218_Revised_Interior_Floorplan.pdf
BLD2022-1542_Commercial_Building_C_of_O.pdf
BLD2022-1542_Commercial_Building_C_of_O_693382677.pdf
BLD2022-1542+Application+11.9.2022_1.09.21_PM+3211846
BLD2022-1542+Narrative+11.9.2022_1.09.05_PM+3211843
BLD2022-1542+SI for CMU Enclosure+2.19.2026_3.29.42_PM+5387405.pdf
BLD2022-1542+Special Inspection Report+1.16.2025_12.36.14_PM+4715305.pdf
BLD2022-1542+Special Inspection SOG+1.22.2025_1.27.31_PM+4723505.pdf
BLD2022-1542+Special Inspection+2.4.2025_3.42.43_PM+4745768.pdf
BLD2022-1542+Special Inspection-Footings+12.11.2024_1.01.08_PM+4664878.pdf
BLD2022-1542+Supplementals_Authorization_and_Acknowledgment_-_Building+11.9.2022_1.09.24_PM+3211847
BLD2022-1542+Supplementals_Commercial_Project_Information+11.9.2022_1.09.19_PM+3211844
BLD2022-1542+Supplementals_Critical_Area_Determination_-_Building+11.9.2022_1.09.29_PM+3211848
Building Permit
Park Impact Fee Worksheet BLD2022-1542 Glacier Enviromental SVCS New metal warehouse with office - Copy
RESPONSE TO FIRE Glacier SK75 Chambers
REV1 BLD2022-1542_DESCRIPTION 2-18-2025 (2).pdf
REVIEWED RESUB 1-BLD2022-1542+BUILDING ENVELOPE +8.5.2024_12.00.59_PM+4421223
REVIEWED RESUB 1-BLD2022-1542+LIGHTING FORM+8.5.2024_12.00.59_PM+4421225
REVIEWED RESUB 1-BLD2022-1542+Structural_Calculations+8.5.2024_12.00.59_PM+4421227
REVIEWED RESUB 1-BLD2022-1542+Structural_Calculations+8.5.2024_12.00.59_PM+4421229
Signed SI Form
Signed Soils Inspection Form
U24R0307A EWO 3.5.25 - signed.pdf
UPDATED-BLD2022-1542_Commercial_Building_C_of_O.pdf
Warehouse Phase 1 - DFR - 01-22-25- slab rebar and pour.pdf
Warehouse Phase I - BRK 12-17-24.pdf
Warehouse Phase I - BRK 02-18-25-slab break tests.pdf
Warehouse Phase I - BRK 03-03-25- cmu break test.pdf
Warehouse Phase I - DFR 04-09-25.pdf
Warehouse Phase I - DFR 12-10-24.pdf
Warehouse Phase I - DFR 12-12-24.pdf
Warehouse Phase I - DFR 02-26-25.pdf
Warehouse Phase I - DFR 03-31-25.pdf
Warehouse Phase I - DFR 03-31-25-anchor bolts.pdf
Warehouse Phase I - DFR 11-27-24.pdf
Warehouse Phase I - DFR 12-3-24.pdf