Loading...
HomeSearchMy WebLinkAbout09625345DFR080825ALmr.pdf09625345DFR081925HA.pdf09625345DFR090825GM.pdf09625345DFR101325GM.pdfAPPORVED BLD RESUB1 REV2 BLD2025-0570_PLANS 09-23-2025_11_17_31_Sele_Belanger_Structural_Drawings_09.16.25 (2).pdfAPPROVED BLD REV1 BLD2025-0570_STRUCTURAL PLAN B 08-21-2025_10_11_30_Sele_Belanger_SS-1.1_&_SS-3_08.19.25 (1).pdfAPPROVED BLD ENG PLN RESUB1 BLD2025-0570+SITE & ARCH PLANS+6.18.2025_6.52.29_PM+4982287.pdfAPPROVED BLD2025-0570_SIGNED SI FORM 07-01-2025_09_26_20_Special_Inspection_and_Testing_Agreement_BLD2025-0570_Signed (1).pdfBLD2025-0570_Building_Permit_380716539.pdfBLD2025-0570+Application+4.26.2025_9.27.48_AM+4887188.pdfBLD2025-0570+Supplementals_Authorization_and_Acknowledgment_-_Building+4.26.2025_9.27.55_AM+4887191.pdfBLD2025-0570+Supplementals_Critical_Area_Determination_-_Building+4.26.2025_9.27.59_AM+4887192.pdfBLD2025-0570+Supplementals_Demolition_-_Asbestos+4.26.2025_9.27.45_AM+4887186.pdfBLD2025-0570+Supplementals_Mechanical_Equipment_-_Residential_Building_Permits+4.26.2025_9.27.52_AM+4887190.pdfBLD2025-0570+Supplementals_Residential_Addition_Project_Information+4.26.2025_9.27.48_AM+4887189.pdfENG CORRECTION NOTICE 3.18.2026.pdfREV2 BLD2025-0570_DESCRIPTION 9-8-2025 (1).pdfREVIEWED BLD2025-0570+Structural_Calculations+4.26.2025_9.20.10_AM+4887181.pdfSele Belanger Memo 01.07.26.pdfSele Belanger SS-4 01.12.26.pdfSele-Belanger Strapping RFI 10.16.25.pdf