Loading...
HomeSearchMy WebLinkAbout201 MAIN C OF O.pdf2016-0506 Post Office Phase 2 Beck.pdf2016-0506 Post Office Phase 2 FINAL Letter 07-19-19.pdf2016-0506 Post Office Phase 2 Revision #3.pdf2016-0506 Post Office Phase 2 Shoring Beck.pdf2016-0506 Post Office Phase 2 Structural Beck.pdf20160921141947.pdf20161117100620.pdf20161222144339.pdf20170125091435.pdf20170125094724.pdf20170221082725.pdf20170908092338.pdf20171222091128.pdf20180730100906.pdf2018-1-24 Field Report - L1 PT Slab2018-3-30 Field Report - L2 PT Slab2018-5-23 Field Report - L3 PT Slab2037_001.pdf2085_001.pdf2091_001.pdf2222_001.pdfAE Response to Beck Review 090416.pdfAPPROVED CIVILSBLD2016-0506 - Edmonds 2020 - SHORING - Approval Ltr by DBeck (10-9-2016).docBLD2016-0506 CIVIL AND ARCHITECTURAL PlansBLD2016-0506 PERMIT.pdfBld2016-0506 Post Off PII.pdfBLD20160506 Soils report and Structural calcsBLD20160506.pdfEdmonds Mixed Use Civil Drawings 08.14.19.pdfEdmonds Mixed Use Drainage Memo 2019.08.14.pdfEPO Krazan Inspection- Structural.pdfEPO2 Canopy encroachment Agreement.pdfFINAL LETTER - Shoring 02-07-19FINAL LETTER_BLD2017-0153INSTALLED INSULATION CERTIFICATES (2).pdfINSTALLED INSULATION CERTIFICATES.pdfMichael Clugston Response.pdfPark Impact Fee Worksheet PO Phase 2.pdfPost office 2 Height Verification.pdfPost Office Phase 2 - Shoring FINAL Letter 02-07-19.pdfPost Office Phase 2 Special Inspections CombinedPost Office Phase 2.pdfPre-Con Notes.pdfRevision Comment Letter - ENG1.pdfSI form PO Phase 2 Soils.docSpecial Insp Report for Concrete.pdfSpecial Insp Report.pdfSPECIAL INSPECTIONS POST OFFICEThrust Block pic I.JPGThrust Block Pic II.JPGThrust Block Pic III.JPGThrust Block Pic IV.JPGUPDATED TEMP C OF O.pdf