Loading...
HomeSearchMy WebLinkAboutApproved Bond Worksheet.pdfApproved Parking Lot Autoturn Drawings.pdfApproved Traffic Control Plans.pdfApproved Traffic Impact Worksheet.pdfAttachment-A (1-12-2018).pdfBLD2017-0899 12.31.19 Revision Structural CommentsBLd2017-0899 FIRE COMMENTSBLD20170899 -Stormwater Review.pdfBLD20170899_8509 244th St SW_Stormwater Review2.docBLD20170899_Gursli Multi-ENG 1.pdfBLD20170899_Gursli Multi-ENG 2.pdfBLD20170899_Gursli Multi-ENG 3 with Attachments.pdfBuilding Comment Response 1 Non Structural.pdfBuilding Comment Response 2 - Drawing set.pdfBuilding Comment Response 2 - Signed.pdfBuilding Comment Response 2 - Structural Letter and Calcs.pdfBuilding Comments 1 - non-structural - consultant.pdfBuilding Comments 1 - structural - consultant.pdfBuilding Comments 2 - consolidated.pdfBuilding Comments 2 - Non-struct - consultant.docBuilding Comments 2 - Struct - Consultant.docBuilding Comments 3 - consolidated.pdfBuilding Comments 3 - non-struct - consultant.docCover Letter BLD20170899 and BLD20170900.pdfDUPLICATE Nyland Apts. 244th.docxEmail Sent Including BLD Comments 3.pdfEmail Sent Including Eng and Fire Remaining Comments.pdfENGINEERING AND FIRE RESPONSE TO COMMENTS.pdfEngineering Comments 4.pdfFW Nyland Apartments civil review status.msgGeotech plan approval letter.pdfGeotech Response.pdfPlanning Comment Response (1).pdfPlanning Review Comments #1 BLD20170899-0900.pdfRE 244th Water Main Extension.msgResponse to BLDG Comments 3.pdfResponse to Comments for ENG and Fire.pdfResponse to ENG Comments 2.pdfSale Prohibition Covenant.pdfSigned Agreement between Sunrise Condo and Gursli (2).pdfSigned Agreement between Sunrise Condo and Gursli.pdfSigned Special Inspection Form.pdfSTORM3_BLD20170899-8509 244th St.pdfStructural Review Response to Comments 1.pdfTrash enclosure comments