Loading...
HomeSearchMy WebLinkAbout04.04.19 - Engineering Final Insp Correction Notice.pdf1.2.19 - Eng. Correction Notice.pdf10.15.2018 Email from Owner-DCDA-No objection from neighbor.pdf12.19.18 Correction Notice.pdf12.20.18 - NRC - Vault Drain Line.pdf18. Wastewater Plan Review Response.doc19. Glu-lam Alternate Methods Letter.pdf2.25.19 - Eng. Correction notice.pdf2018-0447 Edmonds Recovery Beck non struc.pdf2018-0447 Edmonds Recovery Beck struc.pdf20180731-16029 Northpoint Recovery Architecture_Permit Revision #2.pdf7. Fire Marshal Response.pdfABKJ Calcs--Northpoint TI-Rev 2_.pdfApplicant revision request.pdfAPPROVED CIVIL PLANS-BLD20180447-NORTHPOINT RECOVERY CENTER.pdfapproved Northpoint_RFI-045 Wall connection to floor Detail_10-30-2018_.pdfBLD18-0447 - Northpoint Recover (NonStruct; 8-5-2018) - APPROVED.pdfBLD18-0447 - Northpoint Recover (Struct; 8-5-2018) - APPROVED.pdfBLD18-0447 - Northpoint Recovery - (Struct Rvw-2, dbeck, 7-23-2018).docBLD18-0447 - Northpoint Recovery - Approval Ltr by DBeck (8-5-2018).docBLD18-0447 - Northpoint Recovery - (NS Rvw-2, dbeck, 7-23-2018).docBLD20180447BLD20180447 ARCH PLANSBLD20180447 Edmonds Recovery Center.pdfBLD20180447_CANOD.pdfC OF O.pdfClynn Wilkinson_DOH_email_May 15, 2015_.pdfCritical Notice on Title.pdfDeflection Track_EJ No. ERCNR-001_ Engineering Judgment Based on HW-D-0550-8.5x11_.pdfDesign Review Decision.pdfDOH Approval 60847860_5-23-2018_.docxDRAFT Stormwater Covenant.pdfEdmonds Recovery Center 2.docxEdmonds Recovery Center.pdfElectric#2_Northpoint Ltg Summary-02_.pdfFDC Storz Connection.docxFIELD CHANGE RE_ Northpoint - Revised Parapet detail RFI-036.pdfFinal Letter BLD20180447.pdfFire Lane Standards EDM 2018.pdfIMG_2028.JPGIMG_2029.JPGlandscape revision.pdfMemo to City of Edmonds Responses_7-2-2018_.docxNorthpoint - REVISED_RFI-063 SW-4 Drag Straps at Level 2_rev_SA.pdfNorthpoint - RFI 056 L2 Stair Opening HSS Connection Details_sa.pdfNorthpoint - RFI 063 - SW-4 Drag Straps at Level 2_SA.pdfNorthpoint - RFI-046 Storefront Openings 101 & 122 Hardware_SA.pdfNorthpoint - RFI-64_Elevator Guiderail Support Post & Beam Connection_SA.pdfNorthpoint Engineering Judgement Firestop_NS14918024_.pdfNorthpoint_Request to Eliminate Parking Stall_12-13-2018.pdfNorthpoint_RFI-081 H12 Fire Partitions in Patinet Rooms.pdfNorthpoint_Storefront Submittal_12-12-2018.pdfNORTHPOINT-BLD20180447-CIVIL ASBUILTS.pdfPlanning Final Inspection Corrections #1.pdfProperty Owners Tree Removal Agreement_Executed_03-25-19.pdfRE NRC - Rain Garden OSM.msgRecorded Indemnity Covenant (2).pdfRECORDED INDEMNITY COVENANT.pdfRecorded Utility Easement - AFN 201904220009.pdfrevision #4 letter.pdfREVISIONS - MULTI SHEETS NOV 2018.pdfRFI 038 - Bolted Connections for Roof Screen_11-09-2018_signed.pdfSIGNED SPECIAL INSP AGREEMENT SOILS.pdfSIGNED SPECIAL INSP AGREEMENT STRUCTURAL.pdfStormwater Covenant_Recorded_04-09-19.pdfTree Removal Request.pdfUSG Design Studio STC 49_UL U419 or MEA 81-9...Fire Rated Assembly, Fire Rated Detail_.pdfUSG Test Reports _Floor-Ceiling Intertek test reports on I joist N25 attched 9 27 11_.pdf