04.04.19 - Engineering Final Insp Correction Notice.pdf
1.2.19 - Eng. Correction Notice.pdf
10.15.2018 Email from Owner-DCDA-No objection from neighbor.pdf
12.19.18 Correction Notice.pdf
12.20.18 - NRC - Vault Drain Line.pdf
18. Wastewater Plan Review Response.doc
19. Glu-lam Alternate Methods Letter.pdf
2.25.19 - Eng. Correction notice.pdf
2018-0447 Edmonds Recovery Beck non struc.pdf
2018-0447 Edmonds Recovery Beck struc.pdf
20180731-16029 Northpoint Recovery Architecture_Permit Revision #2.pdf
7. Fire Marshal Response.pdf
ABKJ Calcs--Northpoint TI-Rev 2_.pdf
Applicant revision request.pdf
APPROVED CIVIL PLANS-BLD20180447-NORTHPOINT RECOVERY CENTER.pdf
approved Northpoint_RFI-045 Wall connection to floor Detail_10-30-2018_.pdf
BLD18-0447 - Northpoint Recover (NonStruct; 8-5-2018) - APPROVED.pdf
BLD18-0447 - Northpoint Recover (Struct; 8-5-2018) - APPROVED.pdf
BLD18-0447 - Northpoint Recovery - (Struct Rvw-2, dbeck, 7-23-2018).doc
BLD18-0447 - Northpoint Recovery - Approval Ltr by DBeck (8-5-2018).doc
BLD18-0447 - Northpoint Recovery - (NS Rvw-2, dbeck, 7-23-2018).doc
BLD20180447
BLD20180447 ARCH PLANS
BLD20180447 Edmonds Recovery Center.pdf
BLD20180447_CANOD.pdf
C OF O.pdf
Clynn Wilkinson_DOH_email_May 15, 2015_.pdf
Critical Notice on Title.pdf
Deflection Track_EJ No. ERCNR-001_ Engineering Judgment Based on HW-D-0550-8.5x11_.pdf
Design Review Decision.pdf
DOH Approval 60847860_5-23-2018_.docx
DRAFT Stormwater Covenant.pdf
Edmonds Recovery Center 2.docx
Edmonds Recovery Center.pdf
Electric#2_Northpoint Ltg Summary-02_.pdf
FDC Storz Connection.docx
FIELD CHANGE RE_ Northpoint - Revised Parapet detail RFI-036.pdf
Final Letter BLD20180447.pdf
Fire Lane Standards EDM 2018.pdf
IMG_2028.JPG
IMG_2029.JPG
landscape revision.pdf
Memo to City of Edmonds Responses_7-2-2018_.docx
Northpoint - REVISED_RFI-063 SW-4 Drag Straps at Level 2_rev_SA.pdf
Northpoint - RFI 056 L2 Stair Opening HSS Connection Details_sa.pdf
Northpoint - RFI 063 - SW-4 Drag Straps at Level 2_SA.pdf
Northpoint - RFI-046 Storefront Openings 101 & 122 Hardware_SA.pdf
Northpoint - RFI-64_Elevator Guiderail Support Post & Beam Connection_SA.pdf
Northpoint Engineering Judgement Firestop_NS14918024_.pdf
Northpoint_Request to Eliminate Parking Stall_12-13-2018.pdf
Northpoint_RFI-081 H12 Fire Partitions in Patinet Rooms.pdf
Northpoint_Storefront Submittal_12-12-2018.pdf
NORTHPOINT-BLD20180447-CIVIL ASBUILTS.pdf
Planning Final Inspection Corrections #1.pdf
Property Owners Tree Removal Agreement_Executed_03-25-19.pdf
RE NRC - Rain Garden OSM.msg
Recorded Indemnity Covenant (2).pdf
RECORDED INDEMNITY COVENANT.pdf
Recorded Utility Easement - AFN 201904220009.pdf
revision #4 letter.pdf
REVISIONS - MULTI SHEETS NOV 2018.pdf
RFI 038 - Bolted Connections for Roof Screen_11-09-2018_signed.pdf
SIGNED SPECIAL INSP AGREEMENT SOILS.pdf
SIGNED SPECIAL INSP AGREEMENT STRUCTURAL.pdf
Stormwater Covenant_Recorded_04-09-19.pdf
Tree Removal Request.pdf
USG Design Studio STC 49_UL U419 or MEA 81-9...Fire Rated Assembly, Fire Rated Detail_.pdf
USG Test Reports _Floor-Ceiling Intertek test reports on I joist N25 attched 9 27 11_.pdf