Loading...
HomeSearchMy WebLinkAbout12-13-18 HearingPresentation - Ex 2.pdf17038 Preliminary Engineering 2018-04-30.pdf17-038 Select (ED17) 10-lot Drainage Report 2018-04-30.pdfApplicant response Oct 5.pdfapplicant's response to corrections.pdfApplication + Cover Letter.pdfApproved Civil Plans-PLN20180034Approved Cost EstimateApproved Stormwater ReportApproved Stormwater Report.pdfCivil Review 1 - Draft Civil Plans recd 3-14-19.pdfCivil Review 1 - Geotech Report.pdfCIVIL REVIEW 1 - STORMWATER REPORT RECD 3-14-19.pdfCIVIL REVIEW 2 - COVER LETTER RECD 5-2-19 (2).pdfCIVIL REVIEW 2 - GEOTECH ADDENDUM RECD 5-2-19.pdfCIVIL REVIEW 2 - VAULT STRUCTURAL CALCS RECD 5-2-19.pdfCIVIL REVIEW 2 - VAULT STRUCTURAL DRWGS RECD 5-2-19.pdfCIVIL REVIEW 2- DRAFT CIVIL PLANS RECD 5-2-19.pdfConsultant Review 1 Letter 2019.05.16.pdfENG ASBUILTEngineering Comments-1.pdf.pdfEngineering Preliminary Approval.pdfEngineering Requirements.pdfEngineering-Request for Info.pdfEUC Form.pdfExhibit 1 - PLN20180034 staff report and attachments reduced.pdfFire Comments PLN20180034.pdfFire Lane Standards EDM 2018-1.pdfHE Decision Westhaven Preliminary Plat (PLN20180034).pdflot size exhibit.pdfOrd 3459-215th Vacation.pdfPLN20180034 Complete app.pdfPLN20180034 corrections.pdfPLN20180034 Eng-Plan final plat comments 1.pdfPLN2018-0034.pdfPrelim devt plans revised Oct 5 (2).pdfPrelim devt plans revised Oct 5.pdfPrelim plat revised Oct 5.pdfRecorded Westhaven plan AFN201910075001.pdfRecorded Westhaven plat AFN201910075001revised preliminary engineering plans.pdfrevised preliminary plat.pdfSpecial Inspections and Testing Agreement.pdfStaff Comments Request Form.pdfSTORM1_PLN20180034_21511 98th Ave W_Civil.pdfSTORM1_PLN20180034_21511 98th Ave W_Prelim.pdfupdated stormwater report w geotech.pdfVault Consultant Task Order.pdfwesthaven 17038 Preliminary Plat 2018-04-30 signed.pdfWesthaven Approved Civil Plans-PLN20180034.pdfWESTHAVEN PLAT ADDRESSES.pdf