Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
#1_LAI Sharma Residence Site Stabilization Field Report 06-5-2020_SMG
1516_001
15712 72nd AVE W-SITE PLAN
2018-1101 Sharma SFR (Underbrink) - 181127.pdf
2018-1101 Sharma SFR (Underbrink) Special Inspection form
2018-1101 Sharma SFR (Underbrink) Special Inspection form.docx
2018-1101 Sharma SFR (Underbrink)#2.pdf
2020-0023 Footing approval 10-12-2020
9.6.19 Notice of Civil Violation
9.6.19 Notice of Civil Violation (2)
9.6.19 Notice of Civil Violation.pdf
9.6.19 Stop Work Notice
9.6.19 Stop Work Notice.DOC
Amit Sharma LB.docx
Applicant respone to Planning 1.pdf
Applicant response to Bld 1.pdf
Applicant response to BLD 2.0.pdf
Applicant response to BLD 2.pdf
Applicant response to Building 3.pdf
Applicant response to Eng 1.pdf
Applicant response to Storm 1.pdf
Approved Architectural Plans
Approved Structural Plans
BLD2018-1101
BLD20181101_Geotech_Services
Both SI agreements for bsmt revision and temp shoring
Building Permit (3)
CANOD
Certificate of Occupancy sharma
Correction Notice 8.15.19.pdf
Correction Notice 9.3.19.pdf
Correction Notice 9.9.19.pdf
CRITICAL AREA NOTICE ON TITILE
Email-auth to continue restricted work
EMAIL-RE Sharma Retaining Wall - 15712 72nd Ave W
ENG. Comments 1.pdf
EOR Authorization
LANDAU-Sharma Residence Site Stabilization Field Report 06-5-2020_SMG
Plan_Review_Comment_Cover_Letter-BLD20181101.pdf
Planning Review Comments BLD20181101.pdf
RE 15712 72ND AVE W SHARMA.msg
REV 2 Bsmt Shoring Sharrma 04-15-2020[1][3]
REV 2 Sharma - alt bsmt wall calcs 04-15-2020[1][2]
REV 2 SIGNED-Both SI agreements for bsmt revision and temp shoring
REV 2 Temporary Wall3
REV 2 Updated Geo Letter 4.29.20
REV 3 Sharma geo tech ret. wall-SITE REPORT
REV 3 Sharma Site Ret Wall struct dwgs 06-09-2020 UPDATED NEW[1]
REV 5 APPROVED BLD REVISED PLANS-FULL SET
REV 5 List of changes
REV 5 REVIEWED BLD CALCULATION REPORT
REV 6 APPROVED Structural Plans #6
Sharma Civil Drawings 03.30.20[3]
SHARMA HEIGHT CERT
SI Report Sharma revision basment wall and foundation
SI Report Sharma temporary shoring for Basement wall only- Copy
SIGNED SOILS STRUCTURAL INSPECTION FORM
SIGNED-Both SI agreements for bsmt revision and temp shoring
STORM1_BLD20181101_15712 72nd Ave.pdf
Temp Shoring Geotech Letter
Updated Geo Letter 4.29.20
Updated Geo Letter[3]
Updated Geo Letter331