Loading...
HomeSearchMy WebLinkAbout01-EWC Non-Structural Comment Response Letter 2019-04-06 - Copy.pdf04-EWC Structural Response Letter.pdf06-EWC Geotechnical Plan Review Letter - Copy - Copy.pdf07-EWC Fire Prevention Comment Response Letter 2019-04-06 - Copy.pdf201016 EWC Special Inspections Letter by Reid Middleton2018-1658 Waterfront Center Building Non Struc 1 Beck.pdf2018-1658 Waterfront Center Building Struc 1 Beck.pdf2020-12-01 Edmonds Waterfront Center ABT ReportApproved Traffic Impact Report.pdfBLD18-1658 - EWC - Approval Ltr by DBeck (5-6-2019).docBLD2018-1658BLD2018-1658 PLANSCANOD BLD20181653 through BLD20181659.pdfEdmonds Senior Center 220 Railroad Ave.pdfEWC FINAL CONSTRUCTION Elevation Certificate SignedEWC Permit Set (Rvw-2, dbeck, 5-6-2019) - NOT FULLY APPROVEDFF086033_ElevCert_FormOnly_RE_1Mar2018.pdfFlood Elev Cert-2019.06.25M7191427.0018AM7191427_FINAL_LETTER_L_BLD2018-1658M7191427_FLRev1_BLD2018-1658PIF worksheet for WFC.docxPlan review comments for Edmonds Waterfont Senior Center 5-3-2019.docPlanning Review Comments #1.pdfPROJECT ASBUILTSRidge Height ReportSIGNED SPECIAL INSP AGREEMENT SOILS.pdfSIGNED SPECIAL INSP AGREEMENT STRUCTURAL.pdfSPECIAL INSPECTION REPORTSWFC C of OccWFC Floor Area Email.docx