Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
01-EWC Non-Structural Comment Response Letter 2019-04-06 - Copy.pdf
04-EWC Structural Response Letter.pdf
06-EWC Geotechnical Plan Review Letter - Copy - Copy.pdf
07-EWC Fire Prevention Comment Response Letter 2019-04-06 - Copy.pdf
201016 EWC Special Inspections Letter by Reid Middleton
2018-1658 Waterfront Center Building Non Struc 1 Beck.pdf
2018-1658 Waterfront Center Building Struc 1 Beck.pdf
2020-12-01 Edmonds Waterfront Center ABT Report
Approved Traffic Impact Report.pdf
BLD18-1658 - EWC - Approval Ltr by DBeck (5-6-2019).doc
BLD2018-1658
BLD2018-1658 PLANS
CANOD BLD20181653 through BLD20181659.pdf
Edmonds Senior Center 220 Railroad Ave.pdf
EWC FINAL CONSTRUCTION Elevation Certificate Signed
EWC Permit Set (Rvw-2, dbeck, 5-6-2019) - NOT FULLY APPROVED
FF086033_ElevCert_FormOnly_RE_1Mar2018.pdf
Flood Elev Cert-2019.06.25
M7191427.0018A
M7191427_FINAL_LETTER_L_BLD2018-1658
M7191427_FLRev1_BLD2018-1658
PIF worksheet for WFC.docx
Plan review comments for Edmonds Waterfont Senior Center 5-3-2019.doc
Planning Review Comments #1.pdf
PROJECT ASBUILTS
Ridge Height Report
SIGNED SPECIAL INSP AGREEMENT SOILS.pdf
SIGNED SPECIAL INSP AGREEMENT STRUCTURAL.pdf
SPECIAL INSPECTION REPORTS
WFC C of Occ
WFC Floor Area Email.docx