Loading...
HomeSearchMy WebLinkAbout1533298-L-Rev0-Hyundai Building Addendum-021819.pdf1533298-Rev0-Final Inspection Report-0924201574_00118-4004-bldg elevation statement hyundai-2007202019-0120 Doug's Hyundai Addition.pdf2019-0120 Doug's Hyundai Revision #1 review #2.pdf2019-0120 Doug's Hyundai Revision #1.pdfApproved Hyundai Traffic Study.pdfARW - 18252 - Hyundai Sales Addition_Supplemental Structural Calculations_Owner Revisions_20200318BACKFLOW CERTIFICATION HYUNDAI DOMESTIC WATERBECK APPROVED PLANS Hyundai Arch Struc 05.15.19BLD19-00120 - Doug's Hyundai - Approval Ltr by DBeck (5-15-2019).docBLD19-00120 - Doug's Hyundai - NS Corr. (Rvw-2, beck, 4-27-2019).docBLD2019-0120BLD2019-0120 PLANSDHyu A21 fp1.pdfDougs Hyundai - Final Letter 10-14-20ENG ASBUILTSENG-PRECON FOLLOWUP-MAZDA SERVICE CTR-HYUNDAIFire Lane Standards EDM 2018.pdfHeight SurveyHyundai C of OHYUNDAI C OF O - TEMPHYUNDAI ENG COMPACTION REPORTHyundai Temp C of OHyundai Traffic Impact Form and Report.pdfHyundai_Building Revision #3 Response 08.23.19.pdfHyundai_Building Revision Summary 04.24.19.pdfHyundai_Planning Revision Summary 04.24.19.pdfLANDSCAPE BID.pdfRE BLD 2019-0120 Hyundai review items.pdfREV 2 ARW - Hyundai Sales Addition Edmonds WA - 2020.03.18REV 2 BLD - APPLICANT RESPONSEREV 2 C50-A-CRT-Xpress II-5x Safety Load Test-EngREV 2 DHyu A60-int elevREV 2 DHyu Rev 5 drawings 3.18.20REV 2 Express II Certificate of ComplianceREV 2 Express II Overspeed Governor Test CertificateREV 2 Express II Tech DataREV 2 Garaventa-Inclined-Wheelchair-Lift-brochure_web-2REV 2 Hyundai_Building Revision #5 Revision summary 3.19.20REV 2 Staircase QuestionnaireREV 3 2020-05-14 Hyundai Water RevisionREV 3 ENG APPROVED C5.00-3 -2020-05-12_BLD20190120 - HyundaiREV 4 APPROVED ENG RESUB1 A1.0 6.24.20REV 4 APPROVED ENG RESUB1 C2.02.3 REV4 6.24.20REV 4 APPROVED ENG RESUB1 C5.00.3 6.24.20REV 4 APPROVED ENG RESUB1 C5.01.3 REV4 6.24.20REV 4 APPROVED ENG RESUB1 L1.0 6.24.20REV 4 APPROVED_ARW - 18252 - Hyundai Sales Addition_Supplemental Structural Calculations_20200518REV 4 APPROVED_DHyu_ Drawing Set 5.14.20REV 4 APPROVED_Stormwater Memo_BLD20190120REV 4 ARW - Hyundai Sales Addition Edmonds WA - 2020.05.15_Revised Sheets OnlyREV 4 Hyundai_Building Revision summary addendum 5.19.20REV 5 2020-06-19_Hyundai Fire Service Field Conflict LetterREV 5 C5.00-3 UTILITY PLANREV 5 C5.01-3 WATER PROFILEREVISION #1 - APP LETTER DETAIL.pdfSIGNED SPECIAL INSP AGREEMENT SOILS.pdfSIGNED SPECIAL INSP AGREEMENT STRUCTURAL.pdfSPECIAL INSPECTIONS COMBINEDSTRENGTH TESTTCofO #2 Hyundai