Loading...
HomeSearchMy WebLinkAbout1921-20190611-R0-Hwy99Edmonds-22342018-1622 GRE 192 Unit Podium Building #2.pdf2018-1622 GRE 192 Unit Podium Building #3.pdf2018-1622 GRE 192 Unit Podium Building.pdf20230516_12252520230516_12253320230516_12254920230516_12255920230516_122609234_King County BQW Spreadsheet_190522_progress.pdf3621_0013622_001Alt Design 23400 Highway 99 - Fire Wall Clarification LetterAlt Design 2-Hr Firewall Clarification-Sheets G004+A804Alt Design Edmonds99-SMS-Branham-CKC Letter-Wood Frame Firewall Detailing-11-21-19Alt Design GRE Apts AM&M Fire Wall Approval LetterAlt Design Opinion_from_SEAOSC_on_Firewall_FinalAlternate Design 2 Hr Fire Wall_SMS LetterAPPROVED BLD DEF SUB 12 BLD2018-1622_FIRE STOPPING_02-14-2022_16_53_37_GRE_Edmonds_99_-_Sub078413_Firestopping_SMSAPPROVED BLD2018-1622 FINAL ARCH PLAN SET WITH REVISED SHEETS INCORPORATEDAPPROVED DEF SUB 13- BLD2018-1622+BALCONIES +3.7.2022_1.54.37_PM+2721873APPROVED DEF SUB 14- CANOPIES BLD2018-1622+PLANS+3.7.2022_2.30.39_PM+2721960APPROVED DEF SUB 16 BLD2018-1622+PERIMETER GUARDRAILS +6.5.2022_3.05.16_PM+2912500APPROVED DEFSUB 9 BLD2018-1622+GENERATOR_PLANS+1.10.2022_4.08.58_PM+2613173APPROVED ENG STORM BLD2018-1622 CIVILSApproved Transportation Study.pdfBLD2018-1622BLD2018-1622 Building height ComplianceBLD2018-1622 (2)BLD2018-1622 (3)BLD2018-1622 Approved Hwy 99 Edmonds - Transportation StudyBLD2018-1622 APPROVED STORMWATER REPORTBLD2018-1622 Approved WC3 Hwy 99 Edmonds - Sup Structural Calcs 2BLD2018-1622 Approved WC3 Hwy 99 Edmonds - Geo ReportBLD2018-1622 Approved WC3 Hwy 99 Edmonds - PlansBLD2018-1622 Approved WC3 Hwy 99 Edmonds - Structural CalcsBLD2018-1622 Approved WC3 Hwy 99 Edmonds - Sup Structural Calcs 1BLD2018-1622 Approved WC3 Hwy 99 Edmonds Shoring - Site and GradingBLD2018-1622 CIVILSBLD2018-1622 FINAL ALTAbld20181622 GRE engineering shoring comments 1.pdfBLD2018-1622 Hwy 99 Edmonds Podium Plan Review PC2.docxBLD2018-1622 Hwy 99 Edmonds Podium Plan Review PC3.docxBLD2018-1622 Hwy 99 Edmonds Shoring Deferral Plan Review PC1.docxBLD2018-1622 Hwy 99 Edmonds Shoring Deferral Plan Review PC2.docxBLD20181622 PLANSBLD2018-1622+ Detailed Smoke Control Report_2022-06-30BLD2018-1622+Application_DF_METAL_STAIRS+6.24.2021_11.56.02_AM+2267760BLD2018-1622+DEF SUB EXPLANATION+3.25.2022_5.45 (1)BLD2018-1622+DEF_SUB_ METAL_STAIRS_Structural_Calculations+6.24.2021_11.55.28_AM+2267755BLD2018-1622+DEF_SUB_METIAL_STAIRS_ Structural_Plan+6.24.2021_11.55.33_AM+2267756BLD2018-1622+ENG WOOD FLOORS Application+6.1.2021_12.51.17_PM+2225704BLD2018-1622+ENG WOOD FLOORS SHOP DRAWINGS+6.1.2021_12.50.41_PM+2225697BLD2018-1622+ENG WOOD FLOORS Structural_Plan+6.1.2021_12.51.04_PM+2225699BLD2018-1622+GENERATOR_Application+6.17.2021_10.37.56_AM+2255604Bond Worksheet-Approved (2)CofO BLD2018-1622Correction Response 1 - Building.pdfCorrection Response 1 - FIre.pdfCorrection Response 1 - Planning.pdfCorrection Response 3 - Transportation.docxDEF SUB 8 BLD2018-1622+CONCRETE_MIX_Application+6.2.2021_2.59.48_PM+2228665DEF SUB 8 BLD2018-1622+Concrete_Mix_Data+6.2.2021_2.59.33_PM+2228661DNS DEF SUB 13- BLD2018-1622+NOTE+3.7.2022_1.54.59_PM+2721874DNS DEF SUB 14- CANOPIES BLD2018-1622+NOTES+3.7.2022_2.11.48_PM+2721962Edmonds 23400 Highway 99.pdfEdmonds 99_Permit # BLD20181622_AAR Testing and Inspection_Final LetterEdmonds99-GRE-CKC Project Complete Letter-04-06-22Edmonds99-SMS-Branham-CKC Response-Plan Check Comments-Building-05-22-19.pdfEdmonds99-SMS-Branham-CKC Response-Plan Check Comm-Storm Water-05-22-19.pdfEdmonds99-SMS-Branham-CKC Structl Calcs-Bldg Permit Resub-05-22-19.pdfEngineering Comments 1.pdfEngineering Comments 2.with attachments.pdfEngineering Comments 3.pdfEngineering Comments 4.pdfEngineering Comments 4-Shoring.pdfFDC Storz Connection.docx.pdfFire Lane Standards EDM 2018.pdfGRE VALUATIONGRE-Hwy-99Highway 99 Shoring Plans Review Comment Response.pdfHwy 99 Edmonds - Civil ENGINEERING Comment Response Letter_190521.pdfHwy 99 Edmonds - Civil STORM Comment Response Letter_190521.pdfHwy 99 Edmonds – Engineering Comment Response Letter_191004.pdfHwy 99 Edmonds – Stormwater Comment Response Letter_191004.pdfKnox Box and Property Access Guidelines and order instructions.pdfLandscapeBondQuantityForm 051619.pdfPlanning Review Comments BLD20181622.pdfPlanning Review Comments BLD20181662.pdfRECORDED PEDESTRIAN EASEMENT.pdfRECORDED UTILITY EASEMENT.pdfREV 4 BLD2018-1622 - ADR MemoREV1 APPROVED BLD2018-1622 FRONTAGE IMPROVEMENTS- LANDSCAPE SHEETSREV2 APPROVED BLD BLD2018-1622 GRE - EOR AcceptanceREV2 APPROVED BLD BLD2018-1622 GRE - Shoring Revision Design MemoREV2 APPROVED BLD BLD2018-1622 GRE - Structural Calcs (Crane)REV2 APPROVED BLD BLD2018-1622 GRE Revision - Temp Shoring Wall PlansREV2 BLD2018-1622 SHORING AND CRANE LETTERREV3 APPROVED OVWSD MEMOREV3 APPROVED-STREET TREES-DUCT BANK-TRA MEMOREV3 GRE UTIL-DRY UTIL REVIEW REFERENCEREV3 REFERENCE DOC RELATED TO TREES (JMC)REV4 BLD2018-1622 - ADR Revision LetterREV5 APPROVED ENG TOWERCRANE DELIVERIES_TCPREV5 RESUB 1 REVISED_3_15_2021_TOWERCRANE TAKE DOWN_TCPREV6 Application+5.10.2021_12.33.56_PM+2187796REV6 APPROVED BLD REV 6 BLD2018-1622 Hold downs - STRUC CALCSREV6 APPROVED BLD REV 6 BLD2018-1622 Hold downs - STRUC PLANSREV7 APPROVED BLD2021-0846+Applicant_Response+4.5.2022_1.14.45_PM+2782889REV7 BLD2021-0846+Additional_File_Submittal+4.5.2022_1.14.51_PM+2782891REVIEWED DEF SUB 11 BLD2018-1622+EXTERIOR CLADDING+1.10.2022_5.51.42_PM+2613410REVIEWED DEFSUB 9 BLD2018-1622+GENERATOR_SPECS+1.10.2022_4.08.58_PM+2613174STORM1_BLD20181622_23400 Highway 99.pdfSTORM2_BLD20181622_23400 Highway 99.pdfSTORM3_BLD20181622_23400 Highway 99.pdfTEMPORARY CofO GRE